MISCELLANEOUS CORRESPONDENCE FOR THE DAVIS-BESSE INITIAL EXAMINATION - MAY 2004

.)

r FENOC -

Firstfnergy Nuclear Operating Company 5501 Norfh Sfafe Roufe 2 Oak Harbor, Ohio 43449 Lew W. Myem Chief Operating Officer 4 19-32 I - 7599 Fax: 4 19-32 1 - 7582 Docket Number 50-346 License Number NPF-3 Serial 1 - 1302 February 1 9, 2003 Mr. R. Lanksbury Chief Operations Branch United States Nuclear Regulatory Conmission Region I11 801 Warrenville Road Lisle, Illinois 60532-435 1

Subject:

Scheduling of Initial Operator Licensing Examinations

Dear Mr. Lanksbury:

This letter is submitted to provide written notification of the FirstEnergy Nuclear Operating Company's (FENOC) intention of rescheduling the 2003 Initial Licensing Examination for the Davis-Besse Nuclear Power Station (DBNPS).

On December 20,2002, FENOC requested a postponement of the 2003 Initial License Examination originally scheduled for the weeks of June 16 and June 23, 2003, in order to support the restart effort at the DBNPS (reference DBNPS Serial 1-1297). As discussed on January 23, 2003, with Mr. Michael E. Bielby, NRC Region 111, and Mr. Don L. Bondy, a member of my staff, the earliest available examination date that the NRC will be able to support after October 2003, is in February 2004. Therefore, FENOC requests that the postponed 2003 Initial License Examination be rescheduled for the weeks of February 2 and February 9,2004.

Also attached is NRC Fonii 536, Operator Licensing Examination Data, which provides the estimated number of applicants that will be administered Operator Licensing Examinations (through calendar year 2006) and Generic Fundamentals Examinations (throiigli calendar year 2004). Please confimi that these dates are available and acceptable.

Should you have any questions or require additional infomiation, please contact MI.. Patrick.l. McCloskey, h4anager - Re~ulatoiy Affairs, at (41 9) 321 -8450.

Very truly yours, Eric I osui-e

Docket Number 50-346 License Number NPF-3 Serial Number 1-1302 Page 2 cc:

USNRC Document Control Desk M. E. Bielby, Operator Licensing Branch, NRC Region I11 J. E. Dyer, Regional Administrator, NRC Region III D. E. Hills, Chief, Operator Licensing Branch, NRC Region III J. B. Hopkins, DB-1 NRC/NRR Senior Project Manager D. R. McNei1, Operator Licensing Branch, NRC Region 111 C. S. Thomas, DB-1 NRC Senior Resident Inspector Utility Radiological Safety Board

Docket Number SO-346 License Number NPF-3 Serial Number 1 - 1302 Enclosure Page 1 of 1 COMMITMENT LIST The following list identifies those actions committed to by the Davis-Besse Nuclear Power Station in this document. Any other actions discussed in the submittal represent intended or planned actions by Davis-Besse. They are described only as information and are not regulatory commitments. Please notify the Manager - Regulatory Affairs (419-321-8450) at Davis-Besse of any questions regarding this document or associated regulatory commitments.

COMMITMENTS DUE DATE None N/A

LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS NRC FORM 536 (7-2002) 12 15 12 12 0

0 0

0 U.S. NUCLEAR REGULATORY COMMISSION PROPOSED NUMBER NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED OPERATOR LICENSING EXAMINATION DATA CY -

04 04 cy*

4 6

6 6

5 4

2 4

2 Davis-Besse Nuclear Power Station PRIMARY DATE February 2004 March 2004 ALTERNATE DATE APPROVED BY OMB: NO. 31500131 EXPIRES: 07/31Ro(

Estimated burden per response to comply with this voluntary information cdled request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This informalion collection is used to plan budgets and resouro for operator examinalions. Send comments regarding burden eslimale to tl Records Management Branch (T-6 E6). US. Nuclear Regulatory Commissic Washington, DC 20555-0001. or by internet e-mail lo infocdl&s@flrc.gov, and the Desk Officer, Office of Information and Regulatory Affairs, NEOB-1020 (3150-0131). Office of Management and Budget. Washinglon, DC 20503. If means used lo impose an information cdlectiw, does not display a currently va OMB control number, the NRC may no1 conduct or sponsor, and a person is n required lo respond lo. the information cdleclion.

October 2004 October 2005 December 2004 December 2005 NRC REGION I CY&

~

~~

~ _ _

A. PROPOSED EXAMINATION PREPARATION SCHEDULE I

I I

I cy 04 I

I PROPOSED NUMBER 11 cy04 I

10 CY 05 -

CY 06 -

1 I

I 1

t ESTIMATED NUMBER OF I

I I

I B. INITIAL OPERATOR LICENSE EXAMINATIONS I

PROPOSED DATES 6

4 2

October 2006 December 2006 IFlRSi I PROPOSED NUMBER ESTIMATED NUMBER OF CANDIDATES I

SECOND I THIRD I

FIRST I SECOND I THIRD NRC FORM 536 (7-2002)

PRINTED ON RECYCLED PAPER Th6 form was desfgnea using InForms

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION 111 801 WARRENVILLE ROAD LISLE, ILLINOIS 60532-4351 July 16, 2003 Mr. Lew W. Myers Chief Operating Officer FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor, OH 43449-9760

SUBJECT:

CONFIRMATION OF INlTlAUREQUALlFlCATlON OPERATOR LICENSE EXAMINATIONS: DAVIS BESSE NUCLEAR STATION

Dear Mr. Myers:

In a letter dated February 19, 2003, (Serial 1-1302) your staff requested we schedule an initial license operator examination in February 2004, and a second examination in October 2004. In a subsequent telephone conversation on June 19,2003, between Mr. D. McNeil of my staff and Mr. S. Martin, Davis Besse Senior Nuclear Instructor, the first examination was tentatively scheduled to occur during the weeks of February 23,2004 and March 1,2004. The second examination was tentatively scheduled to occur during the weeks of February 7, 2005 and February 14, 2005. On-site validation of the examination will occur at the station approximately 3 weeks before the examination administration. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.

As stated in your letter, your instructors will develop the examination. Mr. Martin indicated that you are training approximately 10 candidates for the first examination and 18 candidates for the second examination. Please inform us if the number of candidates declines below 10 as this will impact the examination schedule. Mr. Martin confirmed that the week of October 25, 2004, scheduled for the biennial requalification program inspection (IP 71 1 1 I.I 1 B), was still within the anticipated requalification examination administration cycle. Please inform us at your earliest opportunity if you discover you need to change the scheduled dates for either the initial license examinations or the requalification training program examinations.

A supplementary letter will be sent to the training department approximately 120 days prior to the initial examination informing them of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination dates, and reconfirm the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. M. Bielby of my staff at 630-829-9762.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.nov/readinq-rm/adams.html (the Public Electronic Reading Room).

Roger D. Lanksbury, Chief Operations Branch Docket No. 50-346 License No. NPF-3 cc:

The Honorable Dennis Kucinich B. Saunders, President - FENOC Plant Manager Manager - Regulatory Affairs M. O'Reilly, FirstEnergy Ohio State Liaison Officer R. Owen, Ohio Department of Health Public Utilities Commission of Ohio President, Board of County Commissioners Steve Arndt, President, Ottawa County Board of Commissioners D. Lochbaum, Union Of Concerned Scientists M. Marler, Training Department Of Lucas County

OFFICE RIII:DRS l(75 RII I:DRS I

NAME DATE 0.7 //4/03 13 1 1 103 MABies:sd fl,quff MBielby 4kt/G (,b V )

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www,nrc.qov/reading-rmladams. html (the Public Electronic Reading Room).

RIII:DRS I.,

RDLanksbury 29 j-

? /IF 103 Sincerely, Roger D. Lanksbury, Chief Operations Branch Docket No. 50-346 License No. NPF-3 cc:

The Honorable Dennis Kucinich B. Saunders, President - FENOC Plant Manager Manager - Regulatory Affairs M. O'Reilly, FirstEnergy Ohio State Liaison Officer R. Owen, Ohio Department of Health Public Utilities Commission of Ohio President, Board of County Commissioners Steve Arndt, President, Ottawa County Board of Commissioners D. Lochbaum, Union Of Concerned Scientists M. Marler, Training Department Of Lucas County

L. Myers ADAM S Distribution :

AJM D FT SPSI RidsNrrDipmlipb GEG HBC CSTl C. Ariano (hard copy)

DRPlll DRSlll PLBl JRKl D. C. Trimble, NRR:DIPM:IOLB M. A. Bies, DRS

FENOC -

FirstEnergy Nuclear Operating Company Lew W. My.ers Chief Operating Officer 4 79-32 1-7599 Fax 419-321-7582 Docket Number 50-346 License Number NPF-3 Serial 1-1 329 October 6, 2003 Mr. Roger D. Lanksbury Chief, Operations Branch United States Nuclear Regulatory Commission Region 111 801 Warrenville Road Lisle. Illinois 60532-435 1

Subject:

Rescheduling of Initial Operator Licensing Esaniination

Dear Mr. Lanksbury:

This letter is submitted to request rescheduling of the Dat,is-Besse Nuclear Power Station (DBNPS) Initial Operator Licensing Examination which is tentatively scheduled for the weeks of February 23, 2004, and March 1, 2004. On September 16, 2003, Mr. Michael Marler, Manager Nuclear Training (Acting) at the DBNPS, contacted you to discuss the availability of an April or May 2004 examination date. To better support the restart effort at the DBNPS, FirstEnergy Nuclear Operating Company (FENOC) requests that the February -- March 2004 Initial Operator Licensing Examination be rescheduled for the week of May 3, 2004. Please confii-ni wliether this date is available and acceptable to the Nuclear Regulatory Commission.

Should you have any questions or require additional infoimation, plcase contact Mr. Kevin L. Ostrowski, Manager -- Regulatory Affairs, at (41 9) 321 -8450.

Very truly yours, A W Bls

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION 111 801 WARRENVILLE ROAD LISLE, ILLINOIS 60532-4351 December 31, 2003 Mr. Lew W. Myers Chief Operating Officer FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor, OH 43449-9760

Dear Mr. Myers:

In a telephone conversation on December 22, 2003, between Mr. Mark Trump, Acting Supervisor, Operations Training, and Mr. Nicholas Valos, Reactor Engineer, arrangements were made for the administration of licensing examinations at the Davis-Besse Nuclear Station the week of May 3, 2004. In addition, the NRC will make an examination validation visit to your facility the week of April 12, 2004.

As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 9, Draft, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRC regional office will discuss with your staff any changes that might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by January 26, 2004. The written examinations, operating tests, and the supporting reference materials identified in Attachment 2 of ES-201 will be due by March 15, 2004.

Pursuant to 10 CFR 55.40(b)(3), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready to use. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.

In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

Appendix E of NUREG-I021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 31 50-0090), medical certifications (OMB approval number 31 50-0024),

and waiver requests (if any) (OMB approval number 31 50-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

I

L. Myers OFFICE Rlll I C Rlll I

I.

NAME NValos:sd

. p ~ d RLanksbury mL DATE 12/3/03 12& 103 This letter contains information collections that are subject to the Paperwork Reducfion Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 31 50-001 8, which expires on June 30, 2006.

The public reporting burden for this collection is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail at BJSI @NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-I 0202, (31 50-001 8), Office of Management and Budget, Washington, D.C. 20503-0001.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

Thank you for your cooperation in this matter. Mr. Trump has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Nicholas Valos at 630-829-9761, or me at 630-829-9631.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www,nrc.gov/reading-rmladams. html (the Public Electronic Reading Room).

Sin cere I y,

Roger D. Lanksbury, Chief Operations Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3

cc:

The Honorable Dennis Kucinich G. Leidich, President - FENOC Plant Manager Manager - Regulatory Affairs M. O'Reilly, Attorney, FirstEnergy Ohio State Liaison Officer R. Owen, Administrator, Ohio Department of Health Public Utilities Commission of Ohio President, Board of County Commissioners Steve Arndt, President, Ottawa County Board of Commissioners D. Lochbaum, Union Of Concerned Scientists J. Riccio, Greenpeace P. Gunter, N.I.R.S.

M. Marler, Training Department Of Lucas County ADAM S Distribution :

AJM D FT SPSl DCT RidsNrrDipmlipb GEG HBC CSTl DRPlll DRSlll PLBl JRKI M. Bies (concurrence copy)

FENOC -

FirstEnergy Nuclear Operating Company h4ak 6. Badlla vice President - Nuclear 4 19-31-7676 Fax: 4 19-321-7582 Docket Number 50-346 License Number NPF-3 Serial Number 30 IO January 9, 2004 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Operator Licensing Examination Data Ladies and Gentlemen:

The FirstEnergy Nuclear Operating Company (FENOC) is in receipt of the NRC Regulatory Issue Summary 2003-14, "Preparation and Scheduling of Operator Licensing Examinations."

Enclosed is NRC Form 536, Operator Licensing Examination Data, which provides the estimated number of applicants that will be administered Operator Licensing Examinations (through calendar year 2007) and Generic Fundamentals Examinations (through calendar year 2005).

If you require additional infomiation, please contact Mi-. Kevin L. Ostrowski, Manager - Regulatory Affairs, at (4 19) 32 1-8450.

Sincerely yours, A

d )

AWBIs Enclosures cc: Regional Administrator - Region 111 Chief, Operators Branch, NRC Region 111 DB-1 NRCNRR Senior Project Manager DB-I NRC Senior Resident Inspector USNRC Document Control Desk Utility Radiological Safety Board

Docket Number 50-346 License Number NPF-3 Serial Number 30 10 Page 1 of 1 COMMITMENT LIST The following list identifies those actions committed to by the Davis-Besse Nuclear Power Station in this document. Any other actions discussed in the submittal represent intended or planned actions by Davis-Besse. They are described only as information and are not regulatory commitments. Please notify the Manager - Regulatory Affairs (419) 321-8450 at Davis-Besse of any questions regarding this document or associated regulatory commitments.

COMMITMENTS DUE DATE None NIA

Docket Number 50-345 License Number NPF-3 Serial Number 3010 Page 1 of 2 Form NRC - 536 Operator Licensing Examination Data

qRC FORM 536 5-2003)

U.S. NUCLEAR REGULATORY COMMISSION OP E M T O R L1 C E N S I N G EXAMINATION DATA APPROVED BY OMB: NO. 3150-0131 WIRES: 07/31/200!

Estimated burden per res$,,,

to comply with this voluntary informatio cdlectlon request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

his information cdbction is used to plan budgel and resources for operator examinations. Send comments r arding burde estimate to the Records Management Branch (l-6 E6), U.S. N a a r Regulafoi Commission, Washington, DC 20555-0001. or by internet e-mail t infocollects@nrc.gov. and lo the Desk Officer, Office of Information an Re ulat Affairs, NEOB-10202, (3150-0131). Office of Management an Ek&.%shinglon.

DC 20503. If a means used to Impose an lnformatio cdlectm does not display 8 currently vald OMB mntrd number, the NRC ma not conduct or sponsor, and a person is not required to respond to. th information colleclion.

AClLlTY Davis-Besse Nuclear Power Station REGION

~-

4. PROPOSED EXAMINATION PREPARATION SCHEDULE I

I I

I I

c y 4 I

c y 5 I

c y 6 -

PROPOSED NUMBER CY 7 -

I I

I ESTIMATED NUMBER OF EXAMINATIONS LICENSEE-PREPARED ESTIMATED NUMBER OF EXAMINATIONS NRC-PREPARED 0

0 0

3. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 6 CY 5 -

CY 4 -

CY 7 -

~~~

~

NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 3

1 6

6 6

5 7

6 2

1 2

6 6

NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES O

I 0

0 0

PRIMARY DATE 0811 512006 0911 5/2003 05l0312004 0711 512005 0811 5/2005 0911 5/2006

~~

10/15/2007 ALTERNATE DATE

z. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE MARCH PROPOSED NUMBER I

ESTIMATED NUMBER OF 16 18 CANDIDATES 1

NRC FORM 536 (5-Mo3)

PRINTEDONRECYCLEDPAPER

FENOC -

FirstEnergy Nuclear Operating Company 550 1 North State Route 2 Oak Harboc Ohio 43449 Mark B. Bezilla Vice President - Nucleai 4 19-32 1-7676 fax 419-321-7582 1 OCFR2.790(a)(S)

Docket Numher 50-346 License Number NPF-3 Serial Numher 1-1 344 J a n u a r y 2 2, 2004 MI-. E. Valos Chief Examiner - Region 111 United States Nuclear Regulatory Commission 801 Warrcnville Road Lisle, IL 60532-435 1 S LI bj ec t : Opera lo 1' L i c en se Ex ami n at i o 11 0 LI t I i ne

Dear MI-. Valos:

Enclosed is the operator license examination outline required to support the operator license euaniinatioiis being administered at the Davis-Besse Nuclear Power Station (DBNPS) diiring the

\\\\reek of May 3, 2003. This examinatioii outline is considered confidential material and shall be

\\vithlield from public disclosure in accordance with 10 CFR 2.790(a)(8) iintil after the scheduled operator esaminations are complete.

Mr. John C. House, Staff Nuclear Instructor, can respond to questions with regard to the s~tbniitted materials, at (4 19) 32 1-733 1.

If you I-eqiiirc additional information, please contact Mr. Gregory A. Dum, Manager

~ Regulatory Affairs, at (41 9) 321-8450.

Sincerely yours, AM.:B:s Enclosures d'

cc:

Chief - Operations Branch, NRC Region I11 wlo DB-1 NRC/KRR Senior Project Manager w/o DB-1 Senior Resident Inspector LV/O USNRC Doc~iiiieiit Control Desk M./O Utility Radiological Safety Board n'/o

Dock et N LI m b er 5 0 - 3 45 License Number NPF-3 Serial Number 1-1 344 Operator License Examination Outline

Docket Number 50-346 License Number NPF-3 Serial Number 1-1 344 Page 1 of I COMMITMENT LIST The following list identifies those actions committed to by the Davis-Besse Nuclear Power Station in this document. Any other actions discussed in the submittal represent intended or planned actions by Davis-Besse. They are described only as information and are not regulatory commitments. Please notify the Manager - Regulatory Affairs (419) 321-8450 at Davis-Besse of any questions regarding this document or associated regulatory commitments.

COMMITMENTS DUE DATE None NIA

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION 111 801 WARRENVILLE ROAD LISLE, ILLINOIS 60532-4351 March 2, 2004 Mr. Lew W. Myers Chief Operating Officer FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor, OH 43449-9760

SUBJECT:

DAVIS-BESSE NUCLEAR POWER STATION CONFIRMATION OF INITIAL/REQUALIFICATION OPERATOR LICENSE EXAM1 NATIONS:

Dear Mr. Meyers:

In a letter dated February 19, 2003 (Serial 1-1302), your staff requested we schedule an initial license operator examination in February 2004, and a second examination in October 2004. In a subsequent letter dated January 9, 2004, (Serial 3-010) the dates for the examinations were changed. The initial license examination requested for February 2004 was changed to May 2004, and the examination requested for October 2004 was changed to July 2005. The examination requested for May 2004 will be administered during the week of May 3, 2004, and is currently being prepared by Davis-Besse Training Department personnel. The examination requested for July 15, 2005, has been scheduled for the week of July 18, 2005. Since the number of applicants participating in this examination exceeds 10, the week of July 25, 2005, was added to the examination schedule. These dates were confirmed during a telephone conversation on February 19, 2004, between Mr. D. McNeil of my staff and Mr. M. Trump, Davis-Besse Station Training Manager. Your letter also requested examinations be scheduled during the months of August 2006 and August 2007. These examinations will be scheduled as we approach those dates. On-site validation of the examinations will occur at the station approximately 3 weeks before examination administration. In the unlikely event that we are unable to support any of the examinations during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.

As stated in your letter, your instructors will develop the examinations. Please inform us if the number of candidates declines below 10 for any of the examinations as this will impact the examination schedule. We have scheduled the week of October 25, 2004, for your biennial requalification program inspection (IP 71 11 1.1 1B). We understand this date is still within your anticipated requalification examination administration cycle. Please inform us at your earliest opportunity if you discover you need to change the scheduled dates for any of the initial license examinations or the requalification training program examinations.

A supplementary letter will be sent to the training department approximately 120 days prior to the initial examination informing them of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination dates, and reconfirm the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. M. Bielby of my staff at 630-829-9762.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, Roger D. Lanksbury, Chief Operations Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 cc:

The Honorable Dennis Kucinich G. Leidich, President - FENOC Plant Manager Manager - Regulatory Affairs M. O'Reilly, Attorney, FirstEnergy Ohio State Liaison Officer R. Owen, Administrator, Ohio Department of Health Public Utilities Commission of Ohio President, Board of County Commissioners C. Koebel, President, Ottawa County Board of Commissioners D. Lochbaum, Union Of Concerned Scientists J. Riccio, Greenpeace P. Gunter, N.I.R.S.

M. Marler, Training Department Of Lucas County

L. Myers OFFICE RIII:DRS (1/

RIII:DRS RI I I:DRS RIII:DRS N A M E DATE 02/i7/04 \\i'o( ~

I L

13 OZ?,j//O4 J$/2 104 MAB i es : sd.&itl..~/-M B ie I by-RDLanksbury @.fi -9 A supplementary letter will be sent to the training department approximately 120 days prior to the initial examination informing them of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination dates, and reconfirm the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. M. Bielby of my staff at 630-829-9762.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/readinq-rm/adams. html (the Public Electronic Reading Room).

Since re1 y,

Roger D. Lanksbury, Chief Operations Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 cc:

The Honorable Dennis Kucinich G. Leidich, President - FENOC Plant Manager Manager - Regulatory Affairs M. O'Reilly, Attorney, FirstEnergy Ohio State Liaison Officer R. Owen, Administrator, Ohio Department of Health Public Utilities Commission of Ohio President, Board of County Commissioners C. Koebel, President, Ottawa County Board of Commissioners D. Lochbaum, Union Of Concerned Scientists J. Riccio, Greenpeace P. Gunter, N.I.R.S.

M. Marler, Training Department Of Lucas County

L. Myers ADAMS Distribution:

AJM D FT SPSl RidsNrrDipmlipb GEG HBC CSTI DRPlll DRSlll PLBI JRKI DCT MAB 1

FENOC -

FirstEnergy Nuclear Operating Company 5507 North Stare Route 2 Oak Harbor, Ohio 43449 Mark 3. Bezilla Vice President - Nuclear 4 19-327-7676 Fax: 479-321-7582 WHEN SEPARATED FROM ATTACHMENTS, HANDLE THIS DOCUMENT AS UNRESTRICTED 10 CFR 2.390 10 CFR 55.40 Docket N iim b er 5 0- 3 4 6 License Number NPF-3 Serial Number 1-1 353 March 1 2, 2004 Mr. N. Valos Chief Examiner - Region 111 United States N ~ c l ear Regu latory Coinmi ss ion 801 Warrenville Road Lisle, IL 60532-4351

Subject:

Submittal of Written Examinations and Operating Tests

Dear Mr. Valos:

Enclosed are the written examinations, operating tests, and supporting reference material prepared by the Davis-Base Nuclear Power Station (DBNPS) staff for the examinations to be administered during the week of May 3,2004.

The following items and reference material, which are considered confidential, are being submitted to the NRC for review and approval in accordance with 10 CFR 55.40, "Implementation. "

0 Written operator license examinations e

Simulator examination scenarios Examination job performance measures WHEN SEPARATED FROM ATTACHMENTS, HANDLE THIS DOCUMENT AS UNRESTRICTED

Docket Number 50-346 License Number NPF-3 Serial Number 1-1353 Page 2 of 2 WHEN SEPARATED FROM ATTACHMENTS, HANDLE THIS DOCUMENT AS UNRESTRICTED These materials shall be withheld from public disclosure until after the scheduled examinations are complete in accordance with I O CFR 2.390, "Public inspections, exemptions, requests for withholding."

If you have any questions regarding the attached material, please contact Mr. John C. House, Staff Nuclear Instructor, Davis-Besse Nuclear Operations Training, at (41 9) 321-733 1.

AWB /s Enclosures cc: Regional Administrator, NRC Region 111 (w/o)

DB-1 NRC/NRR Senior Project Manager (w/o)

Chief, Operations Branch, NRC Region 111 (w/o)

DB-1 NRC Senior Resident Inspector (w/o)

USNRC Document Control Desk (w/o)

Utility Radiological Safety Board (w/o)

WHEN SEPARATED FROM ATTACHMENTS, HANDLE THIS DOCUMENT AS UNRESTRICTED

Docket Number 50-346 License Number NPF-3 Serial Number 1-1 353 Page 1 of 1 WHEN SEPARATED FROM ATTACHMENTS, HANDLE THIS DOCUMENT AS UNRESTRICTED COMMITMENT LIST The following list identifies those actions committed to by the FirstEnergy Nuclear Operating Company (FENOC), Davis-Besse Nuclear Power Station (DBNPS) in this document. Any other actions discussed in the submittal represent intended or planned actions by FENOC. They are described only as information and are not regulatory commitments. Please notify the Manager - Regulatory Affairs (419-321-8450) at DBNPS of any questions regarding this document or associated regulatory commitments.

COMMITMENTS DUE DATE None N/A WHEN SEPARATED FROM ATTACHMENTS, HANDLE THIS DOCUMENT AS UNRESTRICTED