Yankee Atomic Electric Company LTP Submittal Overview Meeting with USNRC April 6, 2004 1

Discussion Topics mUpdate of Decommissioning Progress mLTP-Related Submittals

- Hydrogeologic Report

  • Related Activities - 2004
  • Future Communications with NRC 2

Update of Decommissioning Progress During Operations Ir \i 1 Currently 3

Update of Decommissioning Progress m Building Demolition o Turbine Building Monolith o Waste Warehouse o Safe Shutdown Building .1 o Fuel Transfer Enclosure o Plant Vent Stack 4

Update of Decommissioning Activities I1 i Cutting of the Metal Vapor Container ____

5

Timeline of LTP Activities

. f rS .

Section 6 Appendices FSS (0undw03 inabal Sd Sensitviy 1(2I1012004) I jCak Submitta ftg at Slte (512003)1 J(W43 FodItkup Dose Modeling N RC LTP Im W20) P ,IoiRpt' c,

Soil and bunading Vocupancy OvUL I land Area Factors Caks (1/19/2004)

I Sep--02 Speclal Tqi' 2 0 g(6/ 03)I RC Dose NRC Cal Modellig Mtg 1(3WA0)

Tech Rpt on Dose Integrtion Parameter 1(111122004) I IGroundwater CompendiumI VIoumretrc

(<5t192003) I Ilnbrii Groundwater RptI C~onorete Cale.

I (3142004)

P12=0n04) 6 Co I

License Termination Plan

  • General Information
  • Summary of Historical Site Assessment ii Identification of survey areas iDInitial classification of survey areas Li Radionuclides of interest L Known groundwater information L Areas of additional investigation
  • Subsurface areas
  • Groundwater
  • Remaining Decommissioning Activities and Remediation Plans 7

License Termination Plan (Con't)

  • Dose Modeling Methodology
  • Criteria, scenarios, and codes used
  • Calculations sent separately
  • Input/output details provided in appendices
  • Final Status Survey Methodology
  • Follows MARSSIM
  • Groundwater and subsurface considerations
  • Financial Information
  • Supplement to the Environmental Report 8

Dose Modeling Calculations

  • Calculations provided:
  • For soil and building surfaces:
  • Parameter sensitivity
  • Parameter values
  • DCGLs
  • Area Factors
  • For concrete:
  • Correlate residual radioactivity and dose
  • Establish DCGL corresponding to 0.5 mrem/yr

- LTP Section 6 Appendices Summarize Information from CaIcs (Inputs and Results) for Soil and Building Surfaces 9

Historical Site Assessment C Basis Document for Site Characterization and Survey Area Classification

  • Describes:

0 Operational history and impacts o Events and spills o Potential for subsurface contamination o Past remediation efforts o Underground systems

  • Summarizes:

o Historical sample data o Statistics on open land area data (SOF, mean, median, std dev)

  • Includes CD with Scanned References (Organized by Survey Area) 10

Hydrogeologic Report of 2003 Supplemental Investigaton

  • Supplements "3rd Quarter Interim Groundwater Report"
  • Summarizes Well Drilling Methods and Construction
  • Identifies Local Stratigraphy
  • Discusses Hydraulic Gradient and Groundwater Flow
  • Identifies Sample Analyses Performed
  • Gamma spec L Tritium and gross alpha/beta
  • Hard-to-detects (including transuranics)
  • Discusses Sample Analyses Results u Tritium only plant-related radionuclides identified
  • Provides Updated Tritium Plume Maps
  • Describes Three-Dimensional Investigation 11

Shallow Tritium Plume (Nov. 2003) 12

Intermediate Tritium Plume (Nov. 2003) 13

I Three-Dim-ensional Investigation D D ifut r4 12M UMWNT IL f VIA NovV

'23 m Ca.OnRnT COCA)

(MMACAM DEWS 5 3U 8nf 5' S1lUUCONEMRA1N lox .1E ~ ESAS0mG WONIT0iG FRL SW11,SATUMEW =07 locoVONMNG IELLSINJG C ATA DEEC1TC*

NOTDETECTED UNIT OF20WpC H*o*QCMns frD. D' Jtwyk-0 i m 14 CQ L-

Related Activiti es - 2004

  • FSS Activities u Assembling FSS staff o Developing FSS plans and procedures o Considering methodology to survey excavations m Site Closure Project Plan
  • PCB Remediation of Sherman Reservoir
  • Continued Stakeholder and Community Outreach 15

Future Communications with NRC mRegular Meetings mPeriodic Calls

  • Early Identification of Concerns
  • Path to Close Issues Before RAI Issuance 16