ML041810221
| ML041810221 | |
| Person / Time | |
|---|---|
| Site: | Big Rock Point, Davis Besse File:Consumers Energy icon.png |
| Issue date: | 06/24/2004 |
| From: | Diaz N, Merrifield J, Reyes L NRC/Chairman, NRC/EDO, NRC/OCM/JSM |
| To: | NRC/EDO |
| McCraw A | |
| References | |
| G20040430 | |
| Download: ML041810221 (1) | |
Text
EDO Principal Correspondence Control FROM:
DUE: 07/12/04 EDO CONTROL: G20040430 DOC DT: 06/24/04 FINAL REPLY:
Chairman Diaz Commissioner Merrifield Luis Reyes, EDO TO:
OEDO FOR SIGNATURE OF :
- GRN **
CRC NO:
DESC:
ROUTING:
Briefing Package for Chairman Diaz, Commissioner Merrifield and L. Reyes, EDO for Visit to Davis-Besse on July 19, 2004 and Big Rock Point on July 20, 2004 DATE: 06/25/04 Reyes Norry Virgilio Kane Collins Dean Burns/Cyr Dyer, NRR Strosnider,NMSS Weaver, OEDO ASSIGNED TO:
RIII CONTACT:
Caldwell SPECIAL INSTRUCTIONS OR REMARKS:
NO DOCUMENTATION ATTACHED.
Prepare briefing package with bios for Chairman, Commissioner Merrifield and L. Reyes, EDO to Doug Weaver, OEDO by 7/12/04.
Coordinate response with NRR for Davis-Besse and NMSS for Big Rock Point.
.11-le"441 C& e 1. :t 0 _o 0 1 C-CI6S Eb C-bO -