ML041750617

From kanterella
Jump to navigation Jump to search
Initial Examination Corporate Notification Letter No. 50-223/OL-04-01, University of Massachusetts - Lowell
ML041750617
Person / Time
Site: University of Lowell
Issue date: 06/25/2004
From: Doyle P
NRC/NRR/DRIP/RNRP
To: Kegel G
Univ of Massachusetts - Lowell
Doyle P, NRC/NRR/DRIP/RNRP, 415-1058
Shared Package
ML041750578 List:
References
50-223/OL-04-01 50-223/OL-04-01
Download: ML041750617 (3)


Text

June 25, 2004 Dr. Gunter Kegel, Director Nuclear Radiation Laboratory University of Massachusetts Lowell One University Avenue Lowell, MA 01854

SUBJECT:

INITIAL EXAMINATION CORPORATE NOTIFICATION LETTER NO. 50-223/OL-04-01, UNIVERSITY OF MASSACHUSETTS - LOWELL

Dear Dr. Kegel:

I made arrangements with Mr. Leo Bobek for the administration of senior operator upgrade licensing examinations at the University of Massachusetts - Lowell reactor. The operating examinations are scheduled for the week of September 3, 2004.

In order to meet this schedule, I will use the reference material you provided for the last examination administered at your facility. Please forward any updates to this material as soon as possible to the following address:

(U.S. Postal Service) (Overnight Delivery)

U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission ATTN: Paul Doyle ATTN: Paul Doyle Mail Stop O-12 G-13 Mail Stop O-12 G-13 Washington, D.C. 20555 11555 Rockville Pike Rockville, MD 20852-2738 Final, signed senior reactor operator license applications certifying that all training has been completed must be submitted at least 14 days before the first examination dates. This will allow the chief examiner time to review the training and experience of the applicants, process the medical certifications, and process the applications. If the review cannot be completed in time to determine an applicant's eligibility, that applicant may not be permitted to sit for the examination. Therefore, it is recommended that license applications be provided as soon as possible to ensure an appropriate level of review. The NRC has copies of the application forms Personal Qualification Statement -- Licensee (NRC form 398) and Certificate of Medical History by Facility Licensee (NRC form 396) available on the Internet in Adobe Acrobat format. The forms are located at www.nrc.gov/reading-rm/doc-collections/forms/ nrc398.pdf and www.nrc.gov/reading-rm/doc-collections/forms/nrc396.pdf respectively.

This request is covered by Office of Management and Budget (OMB) Clearance Number 3150-0018, which expires June 30, 2006. The estimated average burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per response, including gathering, xeroxing and mailing the required material. Send comments regarding this burden estimate or any other aspect of this collection of information, including

Dr. G. Kegel June 25, 2004 suggestions for reducing this burden, to the Records Branch, (T-6 E-6), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001; or by Internet electronic mail to

<bjs1@nrc.gov>, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C. 20503.

If you have any questions regarding the examination procedures and requirements, please contact me at (301) 415-1058, or Internet e-mail pvd@nrc.gov.

Sincerely,

/RA/

Paul Doyle, Chief Examiner Research and Test Reactors Section New, Research and Test Reactors Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket No. 50-223 cc w/enclosures: Mr. Leo Bobek, University of Massachusetts - Lowell

Dr. G. Kegel June 25, 2004 This request is covered by Office of Management and Budget (OMB) Clearance Number 3150-0018, which expires June 30, 2006. The estimated average burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per response, including gathering, xeroxing and mailing the required material. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Records Branch, (T-6 E-6), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001; or by Internet electronic mail to

<bjs1@nrc.gov>, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C. 20503.

If you have any questions regarding the examination procedures and requirements, please contact me at (301) 415-1058, or Internet e-mail pvd@nrc.gov.

Sincerely,

/RA/

Paul Doyle, Chief Examiner Research and Test Reactors Section New, Research and Test Reactors Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket No. 50-223 cc w/enclosures: Mr. Leo Bobek, University of Massachusetts - Lowell DISTRIBUTION:

PUBLIC RNRP/R&TR r/f PMadden Facility File (EBarnhill) O-6 F-2 JLyons MMendonca, PM EXAMINATION PACKAGE ACCESSION NO.: ML041750578 CORPORATE NOTIFICATION LETTER ACCESSION #: ML041750617 TEMPLATE #: NRR-079 OFFICE: R&TR:CE IROB:LA R&TR:SC NAME: PDoyle EBarnhill PMadden DATE: 6/ 25 /2004 6/ 25 /2004 6/ 25 /2004 C = COVER E = COVER & ENCLOSURE N = NO COPY OFFICIAL RECORD COPY