FENOC Perry Nuclear Power Plant 10 Center Road PO. Box 97 FirstEnergy Nuclear Operating Company Perry, Ohio 44081 June 16, 2004 PY-CEI/NRR-2808L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Perry Nuclear Power Plant Docket No. 50440 License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:
Attached is the May 2004 Monthly Operating Report for Perry Unit 1. Page I is the Operating Data Report and page 2 is the Unit Shutdowns Report. This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, "Revised Contents of the Monthly Operating Report."
This letter is being re-submitted as the wrong cover letter was attached to the correct monthly report and mailed.
If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.
Very truly yours, Vernon K. Higaki t
Manager - Regulatory Affairs Attachment cc: NRC Region III Administrator NRC Project Manager NRC Resident Inspector
~~~~.--*-W-
- i-;,L*:-*-- -i*-'
1 OPERATING DATA REPORT UNIT:
Perry DATE:
6/10/04
- 1.
Docket: 50-440
- 2.
Unit Name:
Perry Nuclear Power Plant
- 3.
Reporting Period: May 2004
- 4.
Utility
Contact:
T. PhelDs
- 5.
Telephone: 440-280-7660
- 6.
Design Electrical Rating (Net MWe):
1260
- 7.
Maximum Dependable Capacity (Net MWe):
1235 This MonthYr-to:Date-Cuimulative --
- 8.
Hours Reactor was Critical 523.7 3.426.7 115.671.4
- 9.
Hours Generator On-Line 512.7 3.415.7 112.927.0
- 10.
Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 11.
Net Electrical Energy (MWeH) 624.411. 0 4.221.745.0 129.350,157.0 Page 1
I UNIT SHUTDOWNS IREPORT MONTH - MAY 2004 DOCKET NO: 50-440 NAME: Perry Nuclear Power Plant DATE: 6/10/04 CONTACT: T. Phelps TELEPHONE: (440) 280-7660 No.
Date Type Duration Reason Method Cause and Corrective Action to Prevent Recurrence 1
Hours 2
3 04-01 5/22/04 F
231.3 A
I On 5/21/04, One of the Emergency Service Water Pumps failed. The plant commenced reactor shutdown at 16:00 on 5/21/04. The unit was taken off line at 08:42 on 5/22/04. The unit remained off line through month's end.
i
SUMMARY
- The Perry Nuclear Power plant remained on line until 5/22/04 at 0842, when the plant shutdown. This was a controlled plant shutdown.
- 1. TYPE:
- 2. REASON:
)
- 3. METHOD:
F: Forced A - Equipment Failure (explain) 1 - Manual S: Scheduled B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory 4-Continuation E -Operating Training &
5 - Other License Examination F - Administrative G - Operational Error (explain)
H - Other (explain)
I Page 2 l
,)