ML041700261

From kanterella
Jump to navigation Jump to search

Tech Spec Pages for Amendment 166 Elimination of Requirements for Hydrogen Recombiners and Hydrogen Monitors
ML041700261
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 06/16/2004
From:
NRC/NRR/DLPM
To:
References
TAC MC2177
Download: ML041700261 (3)


Text

PAM Instrumentation 3.3.3.1 SURVEILLANCE REQUIREMENTS


NOTE---------------------------------------

These SRs apply to each Function in Table 3.3.3.1-1.

SURVEILLANCE FREQUENCY SR 3.3.3.1.1 Perform CHANNEL CHECK. 31 days I SR 3.3.3.1.2 Deleted I

SR 3.3.3.1.3 ------------------ NOTE-------------------

Neutron detectors are excluded.

Perform CHANNEL CALIBRATION. 18 months GRAND GULF 3.3 -21 Amendment No. 41-°,166

PAM Instrumentation 3.3.3.1 Table 3.3.3.1-1 (page 1 of 1)

Post Accident Monitoring Instrumentation CONDITIONS REFERENCED FROM REQUIRED REQUIRED FUNCTION CHANNELS ACTION D.1

1. Reactor Vessel Pressure 2 E
2. Reactor Vessel Water Level - Wide Range 2 E
3. Reactor Vessel Water Level - Fuel Zone 2 E
4. Suppression Pool Water Level 2 E
5. Suppression Pool Sector Water Temperature 2 (c) E
6. Drywell Pressure 2 E
7. Drywell Temperature 2 E B. CRD Cavity Temperature 2 E
9. Primary Containment Pressure - Wide Range 2 E
10. Primary Containment Pressure - Narrow Range 2 E
11. Primary Containment Air Temperature 2 E
12. Primary Containment Area Radiation 2 F
13. Drywell Area Radiation 2 F
14. Deleted I
15. Deleted I
16. Penetration Flow Path, Automatic PCIV Position 2 per pene traffhn E flow path (a) Not required for isolation valves whose associated penetration flow path is isolated.

(b) Only one position indication channel is required for penetration flow paths with only one installed control room indication channel.

(c) Monitoring each of six sectors.

GRAND GULF 3.3-22 Amendment No. X4j6_

Deleted l 3.6.3.1 3.6 CONTAINMENT SYSTEMS 3.6.3.1 Deleted I Pages 3.6-35 and 3.6-36 have been deleted I GRAND GULF 3.6-35/3.6-36 Amendment No. 44, 166