ML041680373
| ML041680373 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 06/09/2004 |
| From: | Peterson N Detroit Edison |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| GL-97-002, NRC-04-0041 | |
| Download: ML041680373 (2) | |
Text
Fermi 2 6400 North Dixie Hwy., Newport, Ml 48166 Detroit Edison Generic Letter 97-02 June 9, 2004 NRC-04-0041 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555
Reference:
Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43
Subject:
Monthly Operating Status Report for May 2004 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for May 2004. This report includes the Operating Data Report and Summary of Unit Shutdowns identified in NRC Generic Letter 97-02 and Fermi 2 Technical Specification 5.6.4.
Should you have any questions or require additional information, please contact me at (734) 586-4258.
Sincerely Norman K. Peterson Manager - Nuclear Licensing Enclosure cc: R. J. Aben, Jr.
D. P. Beaulieu E. R. Duncan M. V. Yudasz, Jr.
NRC Resident Office Regional Administrator, Region m Region m A DTE Energy Company
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 50-341 Fermi 2 June 9, 2004 Kevin Burke (734) 586-5148 REPORTING PERIOD: May 2004
- 1.
Design Electrical Rating (MWe-Net) 1,150.00
- 2.
Maximum Dependable Capacity (Mwe-Net) 1,089.00 This Month Year-to-Date Cumulative
- 3.
Number of Hours the Reactor Was Critical
- 4.
Number of Hours Generator On-line
- 5.
Reserve Shutdown Hours
- 6.
Net Electrical Energy Generated (MWH) 744 744 0.00 819,978 3,647 3,647 0.00 4,028,435 111,543 107,656 0.00 108,652,003 UNIT SHUTDOWVNS
SUMMARY
- The plant operated at full power during the month (excluding small power reductions for required surveillance testing) with the following exceptions: On May 15, 2004, at 0735 hours0.00851 days <br />0.204 hours <br />0.00122 weeks <br />2.796675e-4 months <br />, power was reduced from 100% to 93% due to High Pressure Stop Valve No. 2 closure. Return to full power was completed at 1828 hours0.0212 days <br />0.508 hours <br />0.00302 weeks <br />6.95554e-4 months <br />. On May 30, 2004, at 1425 hours0.0165 days <br />0.396 hours <br />0.00236 weeks <br />5.422125e-4 months <br />, power was reduced from 100% to 93%
for control rod pattern adjustment. Return to full power was completed at 1633 hours0.0189 days <br />0.454 hours <br />0.0027 weeks <br />6.213565e-4 months <br />.
(1) Reason:
A Equipment Failure (Explain)
B Maintenance or Test C Refueling D Regulatory Restriction E Operator Training and License Examination F Administration G Operational Error (Explain)
H Other (Explain)
(2) Method:
1 Manual 2 Manual Trip/Scram 3 Automatic Trip/Scram 4 Continuation 5 Other (Explain)