2003 Regulatory Commitment Change Summary Report
ML041680363
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 05/28/2004
From: Landahl S
Exelon Generation Co, Exelon Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML041680363 (2)


Text

ExekIen.M www.exeloncorp.com Exelon Generation Company, LLC LaSalle County Station Nuclear 2601 North 21'Road Marseilles, IL 61341-9757 May 28, 2004 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 LaSalle County Station, Units I and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374

Subject:

2003 Regulatory Commitment Change Summary Report Enclosed is the Exelon Generation Company (EGC), LLC, commitment change summary for LaSalle County Station for 2003. Revisions to docketed correspondence were processed using the Nuclear Energy Institute's (NEI) 99-04, Revision 0, "Guidelines for Managing NRC Commitment Changes," dated July 1999.

Should you have any questions concerning this letter, please contact Mr. Glen T. Kaegi, Regulatory Assurance Manager, at (815) 415-2800.

Respectfully, I'MT Susan R. Landahl Plant Manager LaSalle County Station Attachment cc: Regional Administrator - NRC Region IlIl NRC Senior Resident Inspector - LaSalle County Station 0,C)

tJ Commitment Date of Original Original Commitment Revised Commitment Basis For Revision Revision Commitment Document Tracking No. Revision 03-001 2/18103 Generic Letter 88-14 LaSalle's original response to Item 2 The subject discussion has been Generic Letter 88-14 Item 2 required Verification Included the following discussion: deleted from the response to Item 2. that maintenance practices, emergency

'LaSalle has Implemented a performance procedures, and training are adequate to ensure monitoring program for the SA that safety-related equipment will function as compressors which supply IAand IN Intended on a loss of Instrument air.'

compressors which is conducted monthly to detect deterioration of compressor The deleted discussion is not a required portion of performance. For the SA compressors, the response required by Item 2, and should not be stage pressure ratios and cold considered as part of the commitment.

temperature difference for the intercoolers are monitored. Operating pressures and loading and unloading times are measured for the IN compressors."03-002 9/24103 Response to IR50- Onsite dumping is no longer permitted. LaSalle County Station will follow The commitment to disallow all onsite dumping, 373/85-025 and 50- applicable Illinois Environment Including non-radiological wastes, Is not required to 374/85-026 dated Protection Agency (IEPA) regulations prevent dumping of radiological wastes onsite.

9/26/85 regarding the dumping of materials onsite. The Station Is subject to IEPA regulations regarding dumping of non-radiological wastes onsite.

Page 1 of I