ML041670542

From kanterella
Jump to navigation Jump to search
May 2004 Monthly Operating Report for South Texas Project Units 1 and 2
ML041670542
Person / Time
Site: South Texas  
Issue date: 06/08/2004
From: Mallen F
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
G02, NOC-AE-04001733, STI: 31753171
Download: ML041670542 (14)


Text

-I Nuclear Operating Company June 8, 2004 NOC-AE-04001733 File No.: G02 10CFR50.71 STI: 31753171 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852 South Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Monthly Operating Reports for May 2004 Pursuant to 10CFR50.71(a) and South Texas Project Electric Generating Station (STPEGS) Technical Specification 6.9.1.5, attached are the Monthly Operating Reports for May 2004.

If you should have any questions on this matter, please contact R.L. Hill at (361) 972-7667.

F.H. Mallen General Manager, Financial Support Attachments: 1)

STPEGS Unit 1 Monthly Operating Report - May 2004

2)

STPEGS Unit 2 Monthly Operating Report - May 2004

NOC-AE-04001733 Page 2 cc:

(paper copy)

(electronic copy)

Bruce S. Mallett Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852 Richard A. Ratliff Bureau of Radiation Control Texas Department of Health 1100 West 49th Street Austin, TX 78756-3189 Jeffrey Cruz U. S. Nuclear Regulatory Commission P. 0. Box 289, Mail Code: MN1 16 Wadsworth, TX 77483 A. H. Gutternan, Esquire Morgan, Lewis & Bockius LLP L. D. Blaylock City Public Service Michael K. Webb U. S. Nuclear Regulatory Commission R. L. Balcom Texas Genco, LP A. Ramirez City of Austin C. A. Johnson AEP Texas Central Company Jon C. Wood Matthews & Branscomb C. M.;Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT I MONTHLY OPERATING REPORT MAY 2004 ST? NUCLEAR OPERATING COMPANY NRC DOCKET NO. 50498 LICENSE NO. NPF-76 Approved By:

G.L.

p i

Sj 16t Datd,'

MONTHLY

SUMMARY

South Texas Project Unit 1 operated during the reporting period at full power with no unit shutdowns or significant power reductions.

OPERATING DATA REPORT DOCKET NO.

50498 UNIT I

DATE June 1 2004 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 OPERATING STATUS

1.

REPORTING PERIOD: 5/1/04 - 5/31/04 GROSS HOURS IN REPORTING PERIOD:

744

2.

CURRENTLY AUTHORIZED POWER LEVEL (Mwvt): 3.853 MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 1.250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1.250.6

3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None

4.

REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE

5.

NUMBER OF HOURS REACTOR CRITICAL

6.

REACTOR RESERVE SHUTDOWN HOURS

7.

HOURS GENERATOR ON LINE

8.

UNIT RESERVE SHUTDOWN HOURS

9.

GROSS THERMAL ENERGY GENERATED (MWH)

10.

NET ELECTRICAL ENERGY GENERATED (MWH)

11.

REACTOR SERVICE FACTOR (%)

12.

REACTOR AVAILABILITY FACTOR (%)

13.

UNIT SERVICE FACTOR (%/)

14.

UNIT AVAILABILITY FACTOR (%)

15.

UNIT CAPACITY FACTOR - Using MDC (as)

16.

UNIT CAPACITY FACTOR - Using DER (%)

17.

UNIT FORCED OUTAGE RATE (%o) 744.0 0

744.0 0

2.878.992 952.964 100.0 100.0 100.0 100.0 102.4 102.4 0.0 3.591.9 0

3.575.8 13.797.194 4.576.084 98.5 98.5 98.0 98.0 100.3 100.3 2.0 107.607.4 0

105.903.3 0

396.764.651 129.650.921 77.9 77.9 76.6 76.6 75.0 75.0 14.3 18.

19.

SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION OF EACH): N/A IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-498 UNIT I

DATE June 1. 2004 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 MONTH MAY DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1 1283 2

1286 3

1289 4

1286 5

1284 6

1284 7

1284 8

1282 9

1282 10 1282 11 1281 12 1281 13 1280 14 1282 15 1283 16 1282 DAY 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 AVERAGE DAILY POWER LEVEL (MWe-Net) 1279 1278 1278 1276 1279 1280 1281 1280 1278 1281 1276 1276 1277 1279 1279

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-498 UNIT 1

DATE June 1. 2004 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 REPORT MONTH MAY 1

2 3

4 5

No.

Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action to Prevent Recurrence (Hours)

Shutting Event Code Code Down Report#

Reactor I

I J

X THERE WERE NO UNIT SHUTDOWNS OR SIGNIFICANT POWER REDUCTIONS DURING THE REPORTING PERIOD I

I I

I I

I I

I I

F: Forced S: Scheduled 2

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Exam F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3 Method:

I-Manual 2-Manual Scram 3-Automatic Scram 4-Cont. of Existing Outage 5-Reduction 9-Other 4

IEEE 805-1983 5

IEEE 803-1983

PORVS AND SAFETY VALVE

SUMMARY

There were no PORV or Safety Valves challenged during the reporting period.

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 MONTHLY OPERATING REPORT MAY 2004 STP NUCLEAR OPERATING COMPANY NRC DOCKET NO. 50-499 LICENSE NO. NPF-80 Approved By:

BiL4 L G.L. IAEY UDaeI

MONTHLY

SUMMARY

South Texas Project Unit 2 operated during the reporting period at full power with no unit shutdowns or significant power reductions.

OPERATING DATA REPORT DOCKETNO.

50-499 UNIT 2

DATE June 1. 2004 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 OPERATING STATUS

1.

REPORTING PERIOD: 5/1/04 - 5/31/04 GROSS HOURS IN REPORTING PERIOD:

744

2.

CURRENTLY AUTHORIZED POWER LEVEL (MVt): 3.853 MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 1.250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1.250.6

3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None

4.

REASONS FOR RESTRICTION (IF ANY): N/A 5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

NUMBER OF HOURS REACTOR CRITICAL REACTOR RESERVE SHUTDOWN HOURS HOURS GENERATOR ON LINE UNIT RESERVE SHUTDOWN HOURS GROSS THERMAL ENERGY GENERATED (MWH)

NET ELECTRICAL ENERGY GENERATED (MWH)

REACTOR SERVICE FACTOR (%)

REACTOR AVAILABILITY FACTOR (%)

UNIT SERVICE FACTOR ('%)

UNIT AVAILABILITY FACTOR (%)

UNIT CAPACITY FACTOR - Using MDC (%)

UNIT CAPACITY FACTOR - Using DER (%)

UNIT FORCED OUTAGE RATE (as)

THIS MONTH 744.0 0

744.0 0

2.897.178 950.060 100.0 100.0 100.0 100.0 102.1 102.1 0.0 YR TO DATE 3.001.9 0

2.984.5 11.429,213 3.761.578 82.3 82.3 81.8 81.8 82.5 82.5 1.3 CUMULATIVE 104.706.4 0

02.390.0 0

383.117.318 124,859,755 79.9 79.9 78.1 78.1 76.2 76.2 13.6

18. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION OF EACH): N/A
19. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A

AVERAGE DAILY UNIT POWER LEVEL DOCKETNO.

50-499 UNIT 2

DATE June 1, 2004 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 MONTH MAY DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1 1274 2

1279 3

1284 4

1284 5

1281 6

1282 7

1282 8

1281 9

1279 10 1280 11 1280 12 1279 13 1279 14 1279 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 17 1278 18 1277 19 1277 20 1276 21 1276 22 1276 23 1277 24 1270 25 1273 26 1273 27 1273 28 1275 29 1259 30 1271 15 16 1278 1278 31 1276

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-499 UNIT 2

DATE June 1. 2004 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 REPORT MONTH MAY 1

2 3

4 5

No.

Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action to Prevent Recurrence (Hours)

Shutting Event Code Code Down Report #

Reactor THERE WERE NO UNIT SHUTDOWNS OR SIGNIFICANT POWER REDUCTIONS DURING THE REPORTING PERIOD I

I I

l I

I I

1 F: Forced S: Scheduled 2

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Exam F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3 Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4-Cont. of Existing Outage 5-Reduction 9-Other 4

IEEE 805-1983 5

IEEE 803-1983

PORVS AND SAFETY VALVE

SUMMARY

There were no PORV or Safety Valves challenged during the reporting period.