5/27/04, Summary of Meeting with Diablo Canyon to Discuss Pg&Es Response to the San Simeon Earthquake and Related Licensing Basis Issues
ML041620315
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 06/09/2004
From: Shukla G
NRC/NRR/DLPM/LPD4
To:
Shukla G, NRR/DLPM/LPDIV-2/415-8439
Shared Package
ML041620324 List:
References
Download: ML041620315 (4)


Text

June 9, 2004 LICENSEE:

Pacific Gas and Electric Company FACILITY:

Diablo Canyon Nuclear Power Plant, Units 1 and 2

SUBJECT:

SUMMARY

OF MEETING HELD ON MAY 27, 2004, TO DISCUSS PACIFIC GAS AND ELECTRIC COMPANYS (PG&E) RESPONSE TO THE SAN SIMEON EARTHQUAKE AND RELATED LICENSING BASIS ISSUES On May 27, 2004, representatives of PG&E met with the NRC staff to make a presentation on their response to the San Simeon earthquake and related licensing basis issues.

The meeting began with PG&Es discussion that their decision for not shutting down the plant was appropriate. The San Simeon earthquake was significantly less than the design earthquake (DE) and did not have the potential to cause damage to the Diablo Canyon Power Plant (DCPP). PG&E further stated that the excursion from the DE vertical response spectra at top of containment was as expected, and the DCPP DE licensing/design basis provides adequate margin for the operating basis earthquake function. Finally, PG&E also discussed that San Simeon earthquake was consistent with the tectonic framework developed in the DCPP long-term seismic program. Following the meeting, the staff expressed its appreciation to PG&E for their presentation.

An attendance list is provided in the attachment. The presentation slides used during the meeting are available in ADAMS under Accession No. ML041490247.

/RA/

Girija S. Shukla, Project Manager, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323

Attachment:

Attendance List cc w/att: See next page

ML041620315 PKG: ML041620324 NRC-001 OFFICE PDIV-2/PM PDIV-2/LA PDIV-2/SC NAME SDembek for GShukla:mp EPeyton SDembek DATE 6/9/04 6/7/04 6/9/04

MEETING WITH PACIFIC GAS AND ELECTRIC COMPANY ATTENDANCE LIST MAY 27, 2004 PACIFIC GAS & ELECTRIC COMPANY L. Womack S. Ketelsen L. Parker B. Horstman N. Jahangir D. Locke D. Miklush L. Cluff N. Abrahamson B. Norton B. Kennedy NRC G. Shukla G. Imbro K. Manoly G. Bagchi Y. Li S. Wong M. Young D. Tang B. Jones B. Tripathi R. Hall

Diablo Canyon Power Plant, Units 1 and 2 cc:

NRC Resident Inspector Diablo Canyon Power Plant c/o U.S. Nuclear Regulatory Commission P.O. Box 369 Avila Beach, CA 93424 Sierra Club San Lucia Chapter c/o Henriette Groot 1000 Montecito Road Cayucos, CA 93430 Ms. Nancy Culver San Luis Obispo Mothers for Peace P.O. Box 164 Pismo Beach, CA 93448 Chairman San Luis Obispo County Board of Supervisors Room 370 County Government Center San Luis Obispo, CA 93408 Mr. Truman Burns Mr. Robert Kinosian California Public Utilities Commission 505 Van Ness, Room 4102 San Francisco, CA 94102 Diablo Canyon Independent Safety Committee ATTN: Robert R. Wellington, Esq.

Legal Counsel 857 Cass Street, Suite D Monterey, CA 93940 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower & Pavillion 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Richard F. Locke, Esq.

Pacific Gas & Electric Company P.O. Box 7442 San Francisco, CA 94120 Mr. David H. Oatley, Vice President and General Manager Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 City Editor The Tribune 3825 South Higuera Street P.O. Box 112 San Luis Obispo, CA 93406-0112 Mr. Ed Bailey, Chief Radiologic Health Branch State Department of Health Services P.O. Box 997414 (MS 7610)

Sacramento, CA 95899-7414 Mr. James D. Boyd, Commissioner California Energy Commission 1516 Ninth Street (MS 31)

Sacramento, CA 95814 Mr. James R. Becker, Vice President Diablo Canyon Operations and Station Director Diablo Canyon Power Plant P.O. Box 3 Avila Beach, CA 93424 Mr. Gregory M. Rueger Senior Vice President, Generation and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 3 Avila Beach, CA 93424