ML041550282
| ML041550282 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 05/26/2004 |
| From: | Ogle C NRC/RGN-II/DRS/EB |
| To: | Gasser J Southern Nuclear Operating Co |
| References | |
| IR-04-007 | |
| Download: ML041550282 (4) | |
See also: IR 05000424/2004007
Text
May 26, 2004
Southern Nuclear Operating Company, Inc.
ATTN: Jeffrey T. Gasser, Vice President
Vogtle Electric Generating Plant
P. O. Box 1295
Birmingham, AL 35201-1295
SUBJECT:
RESCHEDULING OF VOGTLE ELECTRIC GENERATING PLANT - TRIENNIAL
FIRE PROTECTION BASELINE INSPECTION - NRC INSPECTION REPORT
05000424/20040007 AND 05000425/20040007
Dear Mr. Gasser:
The purpose of this letter is to notify you that the onsite inspection dates for the triennial fire
protection baseline inspection of Units 1 and 2 at the Vogtle Electric Generating Plant have
been rescheduled for August 9 - 13 and August 23 - 27, 2004. These dates were confirmed
with Mr. Kenneth Lowery of your staff during a phone call on May 19, 2004. The inspection
team will be led by Mr. Norman Merriweather, Senior Reactor Inspector, of the Region II Office.
The inspection team composition and inspection objectives as well as requests for documents
will remain the same as that discussed in our previous letter of May 07, 2004.
Your cooperation and support during this inspection will be appreciated. If you have questions
concerning this inspection please contact Mr. Merriweather at (404) 562-4627, or me at
(404) 562-4605.
In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room or from the
Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS
is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public
Electronic Reading Room).
Sincerely,
/RA: Kathleen ODonohue for:/
Charles R. Ogle, Chief
Engineering Branch 1
Division of Reactor Safety
Docket Nos.: 50-424, 50-425
cc:
(See page 2)
SNOPCO
2
cc:
J. B. Beasley, Jr.
Executive Vice President
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
W. F. Kitchens
General Manager, Plant Vogtle
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
N. J. Stringfellow
Manager-Licensing
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
Director, Consumers Utility Counsel Division
Governors Office of Consumer Affairs
2 M. L. King, Jr. Drive
Plaza Level East; Suite 356
Atlanta, GA 30334-4600
Office of the County Commissioner
Burke County Commission
Waynesboro, GA 30830
Director, Department of Natural Resources
205 Butler Street, SE, Suite 1252
Atlanta, GA 30334
Manager, Radioactive Materials Program
Department of Natural Resources
Electronic Mail Distribution
Attorney General
Law Department
132 Judicial Building
Atlanta, GA 30334
Laurence Bergen
Oglethorpe Power Corporation
Electronic Mail Distribution
Resident Manager
Oglethorpe Power Corporation
Alvin W. Vogtle Nuclear Plant
Electronic Mail Distribution
(cc contd - See page 3)
SNOPCO
(cc contd)
Arthur H. Domby, Esq.
Troutman Sanders
Electronic Mail Distributioin
Senior Engineer - Power Supply
Municipal Electric Authority
of Georgia
Electronic Mail Distribution
Reece McAlister
Executive Secretary
Georgia Public Service Commission
244 Washington Street, SW
Atlanta, GA 30334
Distribution:
C. Gratton, NRR
L. Slack, RII EICS
RIDSNRRDIPMLIPB
PUBLIC
OFFICE
RII:DRS
RII:DRP
RII:DRS
SIGNATURE
RA
NAME
MERRIWEATHER BONSER
ODONOHUE
DATE
5/26 /2004
5/26 /2004
5/26 /2004
E-MAIL COPY?
YES
NO YES
NO YES
NO YES
NO
PUBLIC DOCUMENT
YES
NO
OFFICIAL RECORD COPY DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML041550282.wpd