MONTHYEARML24281A0662024-10-0404 October 2024 EN 57363 - MPR Associates, Inc. Report in Accordance with 10 CFR Part 21 on Incomplete Dedication of Contactors Supplied as Basic Components ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML19317D0932019-10-25025 October 2019 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10 CFR21-0127, Rev. 0, Emd Fuel Injectors - Seized Plunger and Bushing ML19239A1242019-08-23023 August 2019 Emerson Process Management, LLC - Fisher Information Notice: FIN 2019-01 - Mechanical Setting of Disk/Stem Taper Pins ML19053A5002019-02-0101 February 2019 Sor, Inc. Part 21 Notification of Deviation Sor R-Series Housing with Terminal Block ML16278A4712016-09-22022 September 2016 Notification of 10 CFR Part 21 Condition, Masterpact Breaker Fail to Close ML16281A2702016-09-22022 September 2016 Part 21 - Initial Notification of Masterpact Breaker Fail to Close ML16321A4502016-08-31031 August 2016 Part 21 Notification - Flowserve Swing Check Valves ML16139A8322016-05-13013 May 2016 Part 21 - Initial Notification of Masterpact Breaker Fail to Close ML16139A8332016-05-13013 May 2016 Part 21 - Initial Notification of Masterpact Breaker Fail to Close ML15099A0432015-04-0202 April 2015 Amendment to Event Number 50299, 10 CFR Part 21 Notification, Potentially Defective Pressure & Temperature Switches ML15099A0422015-04-0202 April 2015 Notification of Part 21 Report - Potentially Defective Pressure & Temperature Switches ML14351A3082014-12-16016 December 2014 10 CFR Part 21 Notification for a Defect in LOCA Analyses for B&W Plants ML14337A0952014-11-25025 November 2014 Part 21 - Defect in LOCA Analysis for B&W Plants ML14213A0992014-07-24024 July 2014 Notification of Part 21 Report - Potentially Defective Pressure & Temperature Switches ML14129A4362014-05-0808 May 2014 Interim Report -10CFR 21 Evaluation Regarding Potential Deficiencies in ASME Code Required Valve and Component Testing ML14113A3982014-04-17017 April 2014 Part 21 - Bearing Defect ML14094A4452014-04-0101 April 2014 Notification of Part 21 Report on Defective Raw Material Used to Manufacture Valve Stems ML14079A3532014-03-17017 March 2014 Notification of Part 21 Re Bearing Defect ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13142A3292013-05-0606 May 2013 Notification of Potential Part 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0109, Rev. 0 ML13127A0142013-05-0303 May 2013 Part 21 Report - Fuel Injectors Failed Pressure Test ML13092A1182013-03-29029 March 2013 Notification of Potential Part 21 Interim Report on the Failure of an Emergency Diesel Generator Excitation System ML13064A0122013-02-25025 February 2013 Notification of Potential Part 21 Report Re Wedge Pin Failure of an Anchor/Darling Double-Disc Gate Valve ML12352A1232012-12-13013 December 2012 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12348A1362012-12-13013 December 2012 Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers ML12075A1062012-03-14014 March 2012 Notification of Potential Part 21 Re Defect on Arvan Electrical Terminal Blocks ML12097A3162012-03-0202 March 2012 Part 21 Report - Rosemont Pressure Tranmitters Out of Tolerance Condition ML12066A1182012-03-0202 March 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML11341A0602011-12-0505 December 2011 Notification of Potential Part 21 Involving Defective Spring Clips Used as Seismic Restraints on Two Scientific Modules ML11340A1002011-12-0505 December 2011 Letter 10 CFR Part 21 Notification Report, CON2000 and RTD2100 Spring Clips ML1030601022010-10-29029 October 2010 Notification of Potential Part 21 Transfer of Information Concerning Control Components Inc. (CCI) Drag Valves ML0831900172008-11-12012 November 2008 Notification of Potential Part 21 on All Dimensionally Verified Commercial Grade Items Processed Per Fisher Manufacture Procedure Fmp 2K28 ML0830301412008-10-21021 October 2008 Engine Systems, Inc., Transmittal of 10CFR21-0095, Rev. 0 Reporting of Defects and Non-Compliance, Ingersoll-Rand Series 89 Air Start Motors, P/N 8367694-ESI ML0823901062008-08-25025 August 2008 Notification of Potential Part 21 on Failure of F and G Switches ML0733103812007-11-21021 November 2007 Notification of Potential Part 21 Report Welding of Safety Related Components ML0727504702007-09-21021 September 2007 MPR Associates, Inc. - Report of Defect in Accordance with 10 CFR 21 ML0710002292007-04-0606 April 2007 Rosemount Nuclear Instruments, Inc., Submittal of Notification Under 10 CFR Part 21 for Certain Model 1152 Pressure Transmitters ML0713703092007-03-0707 March 2007 Velan, Inc., Piston Check Cv Information ML0627702242006-09-27027 September 2006 Part 21 Report from Tyco Valves & Controls LP, Improper Valve Springs in Pressure Relief Valves ML0626204942006-09-15015 September 2006 Part 21 Report by Tyco Valves and Controls, LP Re Improper Valve Springs in Pressure Relief Valves. Corrective Actions Taken by Tyco Listed ML0603303452006-01-23023 January 2006 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0091, Rev. 0., Woodward DRU Controls (Manufactured Between November 2000 and November 2005) ML0536403292005-12-28028 December 2005 Notification of Deficiency Report (10 CFR Part 21) for Rosemount Nuclear Instruments Transmitters ML0415501552004-05-28028 May 2004 Areva Electrical Products - U.S. Nuclear Regulatory Commission Operations Center Event Report, Event No. 40691 ML0403002542004-01-28028 January 2004 10CFR Part 21 Notification Regarding Wide Range Ion Chamber (Update) ML0305502482003-02-17017 February 2003 10CFR Part 21 Notification - Carboline Company ML0233304202002-11-26026 November 2002 Part 21 Interim Report on Evaluation of Potential Safety Concern as Result of Findings from Limited Set of Chemical Samples Taken at Davis Besse That May Indicate Leakage from a Source Other than Upper Reactor Vessel Head ML0215604592002-05-23023 May 2002 Consumers Energy Report Under 10 CFR 21: Reactor Pressure Vessel Head ML0215102952002-05-15015 May 2002 10 CFR 21 Notification - Potential Defect Fan Assemblies for UPS Systems ML0215502492002-05-10010 May 2002 Letter from W. G. Hampton Subject: 10CFR Part 21 Notification-Potenial Defect Involving Fan Assemblies Used in Forced Air Cooled Uninterruptible Power Supply Systems 2024-09-06
[Table view] |
Text
I, U.S. NuclearRegulatory Commission OperationsCenter Event Report Paqe I General Information or Other (PAR) Event# 40691 Rep Org: AREVA ELECTRICAL PRODUCTS Notification Date/ Time: 04/21/2004 13:07 (EDT)
Supplier: AREVA ELECTRICAL PRODUCTS Event Date I Time: 04/21/2004 (EDT)
Last Modification: 04/21/2004 Region: 1 Docket #:
City: CRANBERRY TOWNSHIP Agreement State: No County: License #:
State: PA NRC Notified by: FRAN STARR Notifications: DAVID HILLS R3 HQ Ops Officer: JEFF ROTTON VERN HODGE NRR Emergency Class: NON EMERGENCY DAVID SILK RI 10 CFR Section: TERRANCE REIS NRR 21.21 UNSPECIFIED PARAGRAPH PART 21 NOTIFICATION INVOLVING VOLTAGE MONITORING RELAYS "The following information is provided pursuant to the requirements of 10 CFR Part 21 to report a potential safety concern. A potential safety condition may exist with the Eaton Cutler-Hammer D65 Series BI Voltage Monitoring Relay that can cause the unit to bypass the Manual Reset feature. This could result in the D65 relay being energized without an operator manually resetting it resulting in possible personal injury or death or property damage. This condition exists with Eaton Cutler-Hammer D65 Series BI Voltage Monitoring Relays with a manufacturing date between May 12, 2002, and February 20, 2004.
"On March 25, 2004, Framatome/AREVA Electrical Products received the attached Eaton Cutler Hammer Product Safety Warning for D65 Voltage Monitoring Relays, dated March 24, 2004. The Product Safety Warning states that Eaton's Cutler-Hammer D65 Series BI Voltage Monitoring Relays with a manufacturing date identified above may power up without being manually reset even when a NC [Normally closed] switch is wired to activate manual reset mode. This condition is only present when used in applications operating in the manual reset mode. This condition is not present when the device is used in automatic reset mode. This condition may only result when the D65 Series BI is used and will not result if the Al Series is used (as the Al series did not offer the potential for manual reset).
"The supply of Safety Related D65 Voltage Monitoring Relays by Framatome/AREVA Electrical Products is isolated to only one Nuclear Customer (i.e. First Energy - Davis Besse Nuclear Power Plant). The First Energy Davis Besse Nuclear Power Plant was notified by Framatome/AREVA Electrical Products on April 2, 2004."