April 2004 Monthly Operating Report for Susquehanna Units 1 and 2
ML041480159
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 05/14/2004
From: Richard Anderson
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PLA-005760
Download: ML041480159 (7)


Text

V I 3'P.

TM Richard L. Anderson Vice President - Nuclear Operations PPL Susquehanna, LLC 769 Salem /Boulevard Berwick, PA 18603 Tel. 570.542.3883 Fax 570.542.1504 RLAnderson @ pplweb.com May 14,2004 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-Pl-17 Washington, D.C. 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 and 50-388/NPF-22 PLA-005760 The April 2004 Monthly Operating Reports for Susquehanna SES Units 1 and 2 are attached.

Very truly yours, Richard L. Andersn JJH/cmm cc: NRC Region 1 NRC Sr. Resident Inspector, Mr. S. Hansell NRC Project Manager, Mr. R V. Guzman

OPERATING DATA REPORT DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-387 One 05/12/2004 J. J. Hennings (570) 542-3747 1.

2.

3.

4.

OPERATING STATUS Unit Name:

Susguehanna Steam Electric Station (Ul)

Reporting Period:

April 2004 Design Electrical Rating (Net MWe):

1115*

Maximum Dependable Capacity (Net MWe) 1105*

5.

6.

7.

8.

9.

Hours in Reporting Period Number of Hours Reactor Was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)

This Month 719 228.8 180.4 0

164,823 Yr.-to-Date 2,903 1,622.2 1,572.4 0 O 1,540,404 Cumulative 183,192 152,107.0 149,182.0 0

154,153,842 NOTES:

  • Design Electrical Rating (DER) and Maximum Dependable Capacity (MDC) will change starting with the May reporting period due to turbine modifications that were completed in April.

Page 1 of I

UNIT SHUTDOWNS DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-387 One 05/12/2004 J. J. Hennings (570) 542-3747 REPORT MONTH April 2004 No.

Date Type Duration Reason Method of Cause & Corrective Action (Hours) 2 Shutting To Prevent Recurrence Down

_Reactor 3

1 2/28/04 S

1329.6 C

4 Continuation of Planned Refuel Outage.

(total)

2.

4/21/04 F

0 A*

2 Prior to generator on-line, plant procedures required a manual scram due to plant high turbine vibration.

Summary: The Unit 1-13 Refueling Outage end date was April 23,2004.

  • On 4/21/04, prior to generator being placed on-line during plant start-up, excessive turbine vibrations developed due to a shaft "rub". The plant procedures required that a manual scram be performed prior to breaking condenser vacuum to slow the turbine down. The scram was initiated while at 14.5% power. No maintenance activities were required and subsequent turbine/generator start-up was successful. Breaker was closed at 10:36 on 4/23/04 and 100% power was achieved on 4/28/04.

1.

F. Forced S. Scheduled 2.

Reason:

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction 3.

Method:

1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)

Page I of I

SUSQUEHANNA STEAM ELECTRIC STATION Docket Number:

50.387 Completed by: J. J. Hennings Challenges to Main Steam Safety Relief Valves Date:

05/12/04 Telephone:

(570) 542-3747 None.

OPERATING DATA REPORT DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 05/12/04 J. J. Hennings (570) 542-3747 OPERATING STATUS

1. Unit Name:

Susauehanna Steam Electric Station (U2)

2.

Reporting Period:

April 2004

3. Design Electrical Rating (Net MWe):

1182

4.

Maximum Dependable Capacity (Net MWe):

1140 5.

6.

7.

8.

9.

Hours in Reporting Period Number of Hours Reactor Was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)

This Month 719 719 719 0

834,875 Yr.-to-Date 2,903 2,903 2,903 0

3,393,874 Cumulative 168,432 146,798.8 144,811.6 0

152,151,885 NOTES:

The 2004 Monthly Operating Report for January 2004 stated an incorrect value of 838,588 net electrical energy generated (MWH). The correct value was 875,168 MWH. A similar item was identified for January 2003 overstating the actual production by 7,640 MWH.

The April Yr-to-date and cumulative data for April, 2004 incorporates the correct values for January 2003 and 2004.

The electronic Consolidated Data Entry (CDE) adjustments have been completed for Jan, Feb and March of 2004.

No NRC Performance Indicators are impacted by this correction.

Page I of 1

UNIT SHUTDOWNS DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 05/12104 J. J. Hennings (570) 542-3747 REPORT MONTH March 2004 No.

Date Type Duration Reason Method of Cause & Corrective Action (Hours) 2 Shutting to Prevent Recurrence Down Reactor N

3 t

No shutdowns this month.

Summary: On 4/28/04 Reactor power was rapidly reduced to 80% power due to the loss of a plant equipment electrical transformer. The power loss impacted condenser air removal capability, causing turbine back pressure to increase.

Alternate equipment was put in service and condenser pressure was stabilized. 100% power was restored within 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> of the downpower.

1 1.

2.

3.

F. Forced S. Scheduled Reason:

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction Method:

I - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)

Page 1 of I

SUSOUEHANNA STEAM ELECTRIC STATION Docket Number:

50-388 Date:

05/12/2004 Completed by:

J. J. Hennings Telephone:

(570) 542-3747 Challenges to Main Steam Safety Relief Valves None.