Miscellaneous Correspondence for Prairie Island Retake Examination - Apr 2004
ML041470376
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 04/23/2004
From: Lanksbury R
NRC/RGN-III/DRS/OLB
To:
Nuclear Management Co
Shared Package
ML041280237 List:
References
50-282/04-301, 50-306/04-301
Download: ML041470376 (9)


Text

MISCELLANEOUS CORRESPONDENCE FOR THE PRAIRIE ISLAND RETAKE EXAMINATION - APR 2004

Committed to JAN 6 2004 Prairie island Nuclear Generating Plant Operated by Nuclear Management Company, LLC c

L-PI-03-115 10 CFR 55.55 Reg ion al Administrator U.S. Nuclear Regulatory Commission Region Ill 801 Warrenville Road Lisle, IL 60532-4351 PRAIRIE ISLAND NUCLEAR GENERATING PLANT DOCKETS 50-282 AND 50-306 LICENSE NOS. DPR-42 AND DPR-60 REQUEST FOR LICENSE EXAM Nuclear Management Company, LLC (NMC) would like to request a license exam to be scheduled for no earlier than April 23, 2004. This class is comprised of students who passed the operating test portion of the exam, but did not pass the written portion of the License Exam administered on September 19, 2003. Letters requesting a waiver of the operating test portion of the exam for the affected students will be completed as soon as results from the previous exam are finalized.

NMC is preparing the exam in accordance with the NUREG 1021, draft Rev. 9. We have established instructions and a process to ensure exam security.

This letter contains no new commitments and no revisions to existing commitments.

If you have any questions, please contact Jerry Bacon at (651) 388-1 165 ext. 5273 or Bill Markham at (651) 388-1 165 ext. 5277.

Nuclear Generating Plant cc:

Theodore R. Quay, Chief Equipment and Human Performance Branch Mail Stop OWFN 6D-I7 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 1717 Wakonade Drive East Welch, Minnesota 55089-9642 Telephone: 651.388.1 121

JAN 2 9 2004 Prairie Island Nuclear Generating Plant Operated by Nuclear Management Company, LLC L-PI-04-013 NUREG-I 021 Regional Administrator U S Nuclear Regulatory Commission Region Ill 801 Warrenville Road Lisle, Illinois 60532-4351 PRAIRIE ISLAND NUCLEAR GENERATING PLANT DOCKET NOS. 50-282 AND 50-306 LICENSE NOS. DPR-42 AND DPR-60 EXAMINATION MATERIAL FOR PRAIRIE ISLAND INITIAL LICENSE EXAMINATION, WEEK OF APRIL 19,2004 As a follow-up to our [[letter::L-PI-04-007, Withdrawal of License Amendment Request (LAR) Dated October 31, 2003 Changes to Technical Specifications to Implement NEI 97-06, Steam Generator Program Guidelines, and Inspection Requirements Associated with the Unit 1 Replacement SGs|letter dated January 6, 2004]], enclosed are the integrated examination outlines for the initial license examinations to be administered at our facility the week of April 19, 2004. As discussed in the earlier letter, this class is comprised of students who passed the operating test portion of the exam and thus the information enclosed supports only the written portion of a License Exam. Letters requesting a waiver of the operating portion of the exam for the affected students will be completed as soon as results from the previous exam are finalized.

This information is being provided in accordance with the guideline ES-201 of NUREG 1021, Operating License Examination Standard for Power Reactors, Draft Revision 9.

NUREG 1021 physical security requirements state that the enclosed examination materials shall be withheld from public disclosure until after the examination is complete.

Please direct any questions or comments regarding this material to Bill Markham at 651 -388-1 165, ext. 5277.

This letter contains no new commitments and no revisions to existing commitments.

Site Vice President, Prairie Island Nuclear Generating Plant C: Dell McNeill (NRC lead examiner) w/ attachments 1717 Wakonade Drive East Welch, Minnesota 55089-9642 Telephone: 651.388.1 121

,. =.

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION 111 801 WARRENVILLE ROAD LISLE, ILLINOIS 60532-4351 February 5, 2004 Mr. Joseph Solymossy Site Vice-president Prairie Island Nuclear Generating Plant Nuclear Management Company, LLC 1717 Wakonade Drive East Welch, MN 55089

Dear Mr. Solymossy:

In a telephone conversation on February 4, 2004, between Mr. T. Bacon, General Supervisor, Operations Training and Mr. D. McNeil, Reactor Inspector, arrangements were made for the administration of licensing examinations at the Prairie Island Nuclear Generating Plant the week of April 19, 2004.

As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Draft Revision 9 of NUREG-I021, "Operator Licensing Examination Standards for Power Reactors." The NRC regional office will discuss with your staff any changes that might be necessary before the examinations are administered.

To meet the above schedule, it was necessary for your staff to furnish the written examination outlines by January 30, 2004. The outlines were received on that date. The written examinations and the supporting reference materials identified in Attachment 2 of ES-201 will be due by February 23, 2004. Pursuant to 10 CFR 55.40(b)(3), an authorized representative of the facility licensee shall approve the outlines and examinations before they are submitted to the NRC for review and approval. All materials shall be complete and ready to use. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.

Appendix E of NUREG-I 021 contains a number of NRC policies and guidelines that will be in effect while the written examinations are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 31 50-0090), medical certifications (OMB approval number 31 50-0024),

and waiver requests (if any) (OMB approval number 31 50-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

J. Solymossy 2

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 31 50-001 8, which expires on June 30,2006.

The public reporting burden for this collection is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail at BJSl@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (31 50-0018), Office of Management and Budget, Washington, D.C. 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

Thank you for your cooperation in this matter. Mr. Bacon has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact D. McNeil at 630-829-9737, or me at 630-829-9631.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at httD://www.nrc.aov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, 7 Roger D. Lanksbury, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-282; 50-306 License Nos. DPR-42; DPR-60 See Attached Distribution

J. Solymossy OFFICE Rlll I d Rlll Id Rlll I

NAME DMcNeil:sd,

RLanksbury 0 DATE 02/~$/04 02/ 4 /04 2

Rlll I

This letter contains information collections that are subject to the Papenvork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on June 30,2006.

The public reporting burden for this collection is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001 or by Internet electronic mail at BJSl@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-001 8), Office of Management and Budget, Washington, D.C. 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

Thank you for your cooperation in this matter. Mr. Bacon has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact D. McNeil at 630-829-9737, or me at 630-829-9631.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/readinwrm/adams.html (the Public Electronic Reading Room).

Sincerely, Roger D. Lanksbury, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-282; 50-306 License Nos. DPR-42: DPR-60

' I '

J. Solymossy 3

cc:

Craig G. Anderson, Senior Vice President, Group Operations John Paul Cowan, Executive Vice President and Chief Nuclear Officer Manager, Regulatory Affairs Jonathan Rogoff, Esquire, Vice President, Counsel & Secretary Nuclear Asset Manager Tribal Council, Prairie Island Indian Community Administrator, Goodhue County Courthouse Commissioner, Minnesota Department Manager, Environmental Protection Division J. Lash, Training Department of C o m m erce Office of the Attorney General of Minnesota ADAMS Distribution:

DFT TJK3 RidsNrrDipmlipb GEG HBC JTA DRPlll DRSlll PLBl JRKI DCT M. Bies (concurrence copy)

WtJGldLGU Uy I Committed to Nuclear Excellence

.../

FEB 1 9 2004 Regional Administrator U S Nuclear Regulatory Commission Region Ill 801 Warrenville Road Lisle, Illinois 60532-4351 PRAIRIE ISLAND NUCLEAR GENERATING PLANT DOCKET NOS. 50-282 AND 50-306 LICENSE NOS. DPR-42 AND DPR-60 EXAMINATION MATERIAL FOR PRAIRIE ISLAND INITIAL LICENSE EXAMINATION L-PI-04-024 NUREG-I021 Enclosed are the validated written examinations and supporting reference materials requested in your February 5, 2004 letter for the initial license examinations to be administered at our facility on the week of April 19, 2004. This information is being provided in accordance with the guidelines ES-201 of NUREG 1021, Operating License Examination Standard for Power Reactors, Draft Revision 9. Pursuant to I O CFR 55.40(b)(3), the enclosed examinations have been approved by our authorized representative.

NUREG-I 021 physical security requirements state that the enclosed examination materials shall be withheld from public disclosure until after the examination is complete.

Please direct any questions or comments regarding this material to Bill Markham at 651 -388-1 165, Ext. 5277.

This letter contains no new commitments and no revisions to existing commitments.

Joseph M. Solymossy Site Vice President, Prairie Island Nuclear Generating Plant C: Roger D. Lanksbury, USNRC, Region Ill w/o attachments Dell McNeil (NRC lead examiner) w/ attachments Attachments (to Dell McNeil only):

171 7 Wakonade Drive East Welch, Minnesota 55089-9642 Telephone: 651.388.1 121

USNRC L-PI-04-024 Page 2 NUCLEAR MANAGEMENT COMPANY, LLC - Prairie Island 2004 NRC Exam RO/SRO Written Examination 2004 NRC RO Sample Plan Information (5 pages) 0 2004 NRC SRO Sample Plan Information (2 pages)

Form ES-401-4 Record of Rejected WAS (2 pages)

Form ES-401-6 Written Examination Quality Checklist (1 page) - Prairie Island 2004 NRC RO Written Examination 0

Form ES-401-7 Site-Specific RO Written Examination Cover Sheet (I page) 0 RO Examination Without Supporting Information (90 pages) 0 RO Examination Key With Supporting References (391 pages) 0 Summary of RO Examination Changes since 1/30/2004 (2 pages) - Prairie Island 2004 NRC SRO Written Examination 0

Form ES-401-8 Site-Specific SRO Written Examination Cover Sheet (1 page) 0 SRO Examination Without Supporting Information (93 pages) 0 SRO Examination Key With Supporting References (1 77 pages) 0 Summary of SRO Examination Changes since 1/30/2004 (1 page) 1717 Wakonade Drive East Welch, Minnesota 55089-9642 Telephone: 651.388.1 121