V. C. Summer April 2004 Exam 50-395/2004-301 Draft
ML041410417
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 04/19/2004
From:
- No Known Affiliation
To:
Office of Nuclear Reactor Regulation
References
Download: ML041410417 (167)


Text

{{#Wiki_filter:Draft Submittal (Pink Paper)

1.

Administrative Topics Outline (ES-381-1)

2.

Control Room Systems & Facility Walk-Through Test Outline (ES-301-2)

3.

Administrative JPMs

4. In-plant JPMs
5.

Control Room JPMs (simulator JPMs)

.. ES-301 ........ Administrative Topics Octline Form ES-30f.:i' Facility: V. C. Summer Date of Examination: 04/19/2004 Examination Level (circle one): / SRQ Operating Test Number: 1 (see N G ~ ) Conduct of Operations Conduct of Operations Equipment Control Radiation Control Emergency Plan Describe activity to be performed: Shutdown Margin Verification STP-I 34.OO.YAttachment X for Mode fentry. , 4 ,? J M & ~ a QPTR Calculation STP-108.001 Prepare a Tagout for maintenance on the "C" Charging pump. Determin~xdose pi:, rates with airborne activity present. 6' ?>. pa... .e:, N/A NOTE: All items (5 total) are required for SRos. 6'0 applicants require only 4 items unless they are retaking only the administrative topics, when 5 are required. R>>:>-.-.7.... 1:: :::. 22 of 27 NUREG 1021, Draft Revision 9

2 I? p r 7 ES-301 Control Room/ln-Plant Systems Form ES-301-2 Outline Facility: V.C. Summer Date of Examination: 04/19/2004 Exam Level (circle one): EO/ SRO(I) / SRO(U) Control Room Systems (8 for RO; 7 for SRO-I; 2 or 3 for 330-U) Operating Test No.: f I m / JPM Title ecirc. JPSF-002 Deveh an alternate

b.

Operate the CVCS System to Increase RCS Pressure. (JPS-023) 04A1.03) C. Start and Load 'B Die rator (JPSF-025) Develop J MAS alternate path (malfun generator after parail t requires tripping the

d.

Minimize the Consequences of A Total Loss of Service Water. (JPS- 033). 8; :::>

f.

Steam Generator Tube Rupture@kjpressurize RCS to less 'J than S/G pressure). (JPSF-OO$~'i::, In-Plant Systems (4 for RO; 3 for SRO-I; 3 or 2 for!SR:O-U) Safety Function ~ 4P 2 6 45 1 3 8

k.

boss of Containment Integrity (JPPF-112) Develoea \\ modified JPM using a different valve in RCA. I f f F, '4' 5 Type Codes: (D)irect from bank, (M)odified from bank, (N.&w, (Qlternate path, (C)ontroI 'oom, (S)imulator, &)ow-Power, (R)CA 3.:.,.. 23 Of 27 NUREG-I 021, Draft Revision 9

ADMINISTRATIVE JPMs NRC-A-001 Shutdown Margin Verification STP-I 34.001 Attachment I for Mode 5 Entry Perform a QPTR Calculation STP-188.001 Prepare a Tagout for Maintenance on the C: Charging Pump Determine Dose Rates with Airborne Activity Present NRC-A-002 NRC-A-003 NRC-A-004

Monday, JPhf NRC-A401 CALCULATE RCS BORON CONCENTRATION FOR COLD SHUTDOWN, XENON FREE AT 68'F APPROVAL:

APPROVAL DATE: REVNO: 0 March 29. 2004 PageioflO

TASK: TASK STANDARD: iW3:: Obtain required datea from the Curve Book tables and graphs. Use obtained data to calculate required boron concentration, using Attachment IV of STP-134 001 PREFERRED EVALUATIOX LOCATION PREFERRED hW4L &'.A TIO?JMETHOD SIMULATOR PERFORM MFERETCES: STP-134.001 SHUTDOWN MARGIN VERIFICATION TOOLS: EVAL LiATION TIAWE TIME CEITIC4L NO 10CFR55: 45(a)8 GOP-5; STP-134.001; Station Curve Book CANDIDATE: TIME TIME trnrim PERFORMANCE RA TLQG: SAT UNSAT QUkSTIUN GRAIX-PERFORM 4NLE EMMINER: DATE

INSTRUCTIONS TO OPERA TOR READ TO OPERATOR: WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING CUES I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE INITIATING CUES WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB PERFORMANCE MEASURE WILL BE LYITIAL

1. The reactor is being shutdown after several months operation at 100%

power.

2. The initial conditions for entry into GOP-5, Reactor Shutdown from Startup to Hot Standby, have been met.
3. Reactor power has been reduced to IOE-l&nd RCS temperature has been stabilized at 557°F using the steam dumps.
4. Current core burnup is 16,000 MWDIMTU.
5. Current boron concentration is 1000 ppm.
6. A11 control rods are operable.
7. Shutdown and Control Rod Drop Testing is to be performed.

IATTIA TING In preparation for borating the RCS to shutdown the Reactor for this testing per Step 3.5 of GOP-5, you have been directed to calculate the boron concentration required for Cold Shutdown, Mode 5, Xenon Free? at 68°F using STP-134.001. Mocronda.v, March 29,2004 Page3 of IO

OPERA TOR DJSTRUCTIONS: SA FETTY COiVSIDERATIONS: NIA INITIAL

1. The reactor is being shutdown after several months operation at 100%

power.

2. The initial conditions for entry into GOP-5, Reactor Shutdown from Startup to Hot Standby, have been met.
3. Reactor power has been reduced to 10E-1% and RCS temperature has been stabilized at 557°F using the steam dumps.
4. Current core burnup is 16,000 MWDlMTU
5. Current boran concentration IS 1000 ppm.
6. All control rods are operable.
7. Shutdown and Control Rod Drop Testing is to be performed.

In DreDaration for boratincr the RCS to shutdown the Reactor for this testin$ per Step 3.5 of GOP-5. you have been directed to calculate the boron concentration required for Cold Shutdown, Mode 5, Xenon Free, at 68°F using STP-134.001. EVALUATOR WHEN YOU FEEL THAT YOU Monday,.UpIrcII 29,2004 Poge40f 10

SIART. TIUE.

STEPS CR SEQ FIEP: 1 No Yes Review Piecautions. STEPS CR SEQ FIEP: 1 No Yes Review Piecautions. CUBS: COMWEXTS: CR SEQ STEP: 2 No Yes Review Initial Conditions. CUES: CR SEQ STEP: 2 No Yes Review Initial Conditions. CUES: COMiWEh'TLT: CR SEQ STEP: 3 No Yes Record Cycle Burnup. CLET: COMMENTS: .MonduJj, March 29,2004 STEP STANDARD: Reviews Precautions in front of STP-134.001. Initials the top blank on Page 1 of Atbchrnent IV of STP-134.001. SAT UXS.4 T STEP Si?4h1DARD: Reviews Initial Conditions for STP-134.001. Initials the second blank on Page 1 of Attachment IV of STP-134.001. SAT UW.4 T STEP STARDARD: Enters "16,000 on Attachment IV. Page

1. of STP-134.001.

Pugc 5 of io

CR SEQ STEP: 4 No Yes Record the present RCS temperature Cb'ES: CR SEQ STEP: 5 No Yes Record the desired temperature. CUES: CQMMEXTS: CR SEQ STEF: 6 STEP STANDARD: Enters "557" on Attachment IV, Page 1 of STP-134.001 STEPSTAXDARD: Enters "68" on Attatchment IV, page 1 of STP134.001 STEP STAKDARD: Yes Yes Record the highest boron concentration within the desired temperature range to be maintained as well as the Curve Book Figure from which it was obtained. Enters "'I319 ppm" and Figure 11-9.4" on Attachment IV, Page 1 of STP-I34.001. C[TES: C3MMENTS': ,%fQndQ>~, March 2% 2004 s.4 T iXWAT Page 6 of10

CR SEQ STEP: 7 STEP STANDARD: Yes No Contacts Reactor Engineering. Contacts Reactor Engineering via phone or plant page system. CUES: SAT As the Reactor Engineering representative, the Evaluator should cue the examinee ~ N S A T to enter 200 pcm for §amarium. Since this caicuiaicn is being performed for conditions other than the current conditions of this JPM, the examinee should apply "NOTE 2.1" and contact Reactor Engineering. COMM2?'TTS' CR SEQ STEP: 0 STEP STANDARD: Yes Yes Enter Samarium Worth. Enters "200 pcm" on Attachment IV, Page 1 of STP-134.001. CUES: SAT l7NS4 T COil4:WEiVTS: STEP STAXDARD: CR SEQ STEP: 9 Yes Yes Bounding Worth of one or more inoperable Control Rods. of STP-134.001. Enters " 0 pcm on Attachment IV, Page 2 CUES: SAT L'NSA T COM~WE.~TS~ iUon&y, March 29,2004

CR SEQ STEP: 10 STEF STANDARD: Yes Yes Add lines 2.1 and 2.2. Enter "-200 pcm" on line 2.3 of Attachment IV, Page 2 of STP-134.001 CUES: SA 1' m"A 1' COMMENTS: CR SEQ STEP: I? STEP STAiVDARD: Yes Yes Enter Differential Boron Worth for the boron Enters "7.45 (allow for rounding off) on line 2.40f Attachment IV, Page 2 of concentration on line 4.4 (Use Figure 11-7.3 @ 557°F). STP-134.001. CCES: COMMENTS: SAT UNSA T CR SEQ STEP: 12 Yes Yes Divide line 2.3 by line 2.4 STEP STANDARD: Enters "26.85 (allow for rounding cff) on line 2.5 of Attachment IV, Page 2 of STP-134.001. CUES: COMMENTS: Monday, Murch 29,2004 SAT U.WA T Page 8 of 10

CR SEQ STEP: 14 STEP STANDARD: Yes Yes Minimum boron concentration to maintain Subtracts "29" from "7319" and enters Shutdown Margin (subtract line 2.5 from line "1292" on line 3.1 of Attachment IV. k g 6 1.4). 2 of STP-134.001. CUES: SAT Examinee may be conservative and subtract "26 (rounding down) from "1 319 then6LWAT enter "1293 on line 4.1. COMMENTS: Examiner ends JPM at this point. Monday, March 29,2004 Page 9 of IO

JPM SETUP SHEET i BORON CONCENTRATION FOR DESCHPTI0.W: CALCULATE RCS BORON CONCENTRATION FOR FREE AT 68°F IC SET: INSTRUCTIQiVS: COMMENTS: COLD SHUTDOWN. XENON

STP-I 34.001 ATTACHMENT IV PAGE I OF 2 REVISION 11 STTS # SHUTDOWN MARGIN VERIFICATION FOR MODES 4 AND 5 6.1 PRECAUTIONS, Section 2.0 have been reviewed. INITIALS 6.2 1.I Cycle Burn-up.

16. 000 MWB/MTU 1.2 Present RCS temperature: 567 "F

INITIAL CONDITIONS, Section 5.0 have been met. INITIALS 1.3 Desired WCS temperature: 6+@ "F

a.

The RCS must be borated to aCold Shutdown, Xenon-Free concentration prior to manually blocking either the Low Pressurizer Pressure SI below P-I 1 or the Low Steam Line Pressure SI The Shutdown boron concentration requirements of some Mode 4 temperatures may be greater than the Cold Shutdown, Xenon-Free concentration required for Mode 5.

6.

1.4 The highest baron Concentration required to maintain Shutdown Margin for all Modes and temperatures between the present WCS temperature and the desired RCS temperature: 1314 ppm 1.5 The Curve Book Figure from which this boron concentration was obtained: Curve Book Figure: z - 7 ~ y (Figure 11-9.2,9.3, or 9.4) I NOTE 2.1 I The IPCS (XENDISP or U1503) should be used. if the IPCS is not available, of if a calculation is desired for other than current conditions, Reactor Engineering should be contacted to obtain Samarium worth. 2.2 Record Samarium Worth using 2.1.8 g2.l.b:

a.

IPCS Samarium Worth (XENBISP or U1503). (-1 r l h pcm

b.

Obtain Samarium Worth from Reactor Engineering. (-) 200 pem

STP-134.001 ATTACHMENT IV PAGE 2 OF 2 REVISION 11 STTS # SHUTDOWN MARGIN VERIFICATION FOR MODES 4 AND 5 (Cont'd) In Mode 4 or 5 with one or more inoperable Control Rod(s), the RCS should be borated per the applicable Abnormal Operating Procedure. A value of 2200 pcm should be entered for one inoperable rod and 7000 pcm for more than one inoperable rod. 2.2 2.3 2.4 2.5 3.1 3.2 8.3 Bounding Worth of one or more inoperable Control Rods. (+) 0 /pcm Add lines 2.1 and 2.2: 0 = (-{ 200 r/ pcm Step 2.2 Inoperable Control Reds Bounding (-) 200 + (+) Step 2.1 Samarium Worth Worth d W Enter the Differential Boron Worth forrthe boron concentration on line 1.4 (-) 7*qb pcml (Use Figure 11-7.3 at 557°F). ppm / / Divide line 2.3 by line 2.4: Step 2.3 pcm + (-) 7.4s-pcmlppm = (6 2 6. B S PPm Step 2.4 (4 2-(Subtract line 2.5 from line 1.4): T.1 / $7 (..) 27or26 Minimum boron concentration to maintain Shutdown Margin ppm Step 2.5 IT17 Step 1.4 Required Shutdown Margin Boran Concentration c-STOP Present boron concentration: ppm Shutdown Margin is satisfied if line 3.2 is greater than line 3.1. INITIALS Calculated By: DATE Verified By: DATE

Monday, March 29,2004

TASK: TASK STANDARD: ivo:: QPTK has beef7 calculated within 0.001 of actual QPTK value and identified as within Technical Specifications (61.02) per SPP-108.001. PREFERRED EVAL LJATION LQCATIOX PREFERRED E B'AL CIA TIOX,WETHOD CLASSKOOM PERFOKM

REFERENCES:

STP-108.001 QUADRANT POWER TILT RATIO 'FOOLS:

CALCULATOR STP-108.001 DETECTOR CURRENT VALUES HANDOUT E VAL klA TION TIME 20 TIME CRPTICAL CANDIDA TE:

8% 9 PERFOEWANCI? RA TIAT2 SAT UNSAT: QCESIION GRADE No IOCFRSS: 41(b)2 TIME TIME FINISH PERFORMA4CE Monday, March 29,ZROj Page 2 of 8

BNSTRD'e7TBOiQS IF8 QPEXATQR =AD TO OPERATOR: WHEN i TELL YOU TO BEGIN, YOU ARE TO PERFORM TH ACTIONS AS DIRECTED IN THE INITIATING CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED AND PROVIDE THE N%GE§§ARY TOOL§ WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I WILL EXPLAIN THE INITIAL CONDITIONS: WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB PERFORMANCE MEASURE WILL BE SATISFIED. SAFETY COXSIDEM TIONS: IMTIA L "ITPA TIRG The plant is operating at 100% power. Tha Shift Supervisor directs a Licensed Operator to perform a QPTR surveillance test? per STP-108.001,&f=p+++ +%eJ&IlaCSbehg out of service. \\ b Page 3 of 8

CONDITION:

STERY CR SEQ STEP: 1 No No Review Precautions of STP-208.001 CUES: COMMENTS: CR SEQ STEF: 2 STEF STXVDARPP: No No Reviews initial conditions of STP-208.001 Operator reviews precautions section of STP108.001 and initials the second blank on page 1 of Attatchment I, STP108.001. CUES: COMMENTS: STEP S%LVDARIP: Operator reviews precautions and initials the first blank on page 1 of Attachment I, STP-108.001 SAT UlVSA T SAT GTSA T CR SEQ STEF: 3 STEF SE4hDARb): No No Determine method of QPTR caculation to be Operator determines Manual calculation used. per step 6.2 will be used, due to IPCS not being available. Operator cicles Step 6.2 on page 1 of Attachment I, STP108.001. CUES: Cue operator if asked: All Power Range Instruments are operational. ~. o M ~ ~ E ~ v T s : Monday, March 29,2004 SAT 1:NSAT Page 5 of 8

C.X SEQ STEP: 4 STEP STANDARD): Yes No Record the expected detector current for Records the detector current values for 100% power for each excore detector using VCS CUNE book Figure V-3A. 100% power from VCS curve bock Figure V-3A CUES: SAT If the JPM is being performed in the plant control room, after the student has UVSAT satisfactorily demonstrated that they know where to obtain the values the evaluator should give the student the handout sheet for FIGURE V-3A with the expected detector currents for 400% power. CQMMENTS: CR SEQ STEP: 5 STEP STAiVDMD: No No At the NI panel: ensure all detector's range Verifies all detector range sdector switches are selected to 4000 micro ampslslow selector switches are in the same scale. c.ms: SAT GWAT COIMWEAVTX CR SEQ STEP: 6 STEP STANDARD: Yes Yes Read the actual excore detector readings snd record on Attachment ll of STP-108.001. Reads actual excore detector readings for all NIs and records on Attachment I of STP-108.001 CUES: SAT if the JPM is being performed in the plant control room, after the student has UVSAT satisfactorily demonstrated that they know where to obtain the values the evaluator should give the student a handout sheet with detector current values. Co.wnfEA~Ts: Manday, March 29,2004 PuguSaf8

CIZ SEQ STEP: 7 STEP STANDARD: No No Read reactor power and cofltrd bank "B" Reads reactor power and control rod bank "D" position, records on Attachment I1 of position and record on Attachment I1 of STP-lO8.001. STP-108.001 CUB: SAT If JPM is performed in classroom. Cue operator when asked: Reactor power as KVSAT read on Nl's =loo% Control Bank B position = 230 steps COMMENTS: CR SEQ STEP: 8 SIEP STA.?JDARD: Yes Yes Calculate maximum QPTR pet Attachment I Calculates maximum QPTR (1.004

  • 0.001 for handout values) per STP-108.881, Attachment II and records QPTR for upper and lower core sections.

and record data on Attachment II CUES: SAT Prompt operator that all calcuation should be taken out to AT LEAST THREE UNSAT DECIMAL PLACES. CO&fMENTS: CY2 SEQ STEP: 9 STEP STANDARD: Yes Yes Determines if the QPTR is within Determines calcuiated QPTR to be within specifications. T.S. limit of 1.02. Operator initials Acceptance criteria met on page 1 of Attatchment I, STP108.001 CUES: SAT If necessary, prompt the operator to state whether or not the QPTR is acceptable. LiMSAT COMWEiVTS: Examiner ends JPM at this point. Monday,.+faarch 29,2004 Page 7 of 8

JPM SETUP SHEET DESCRIPTION: PERFORM A QFTR CALCULATION HCSE'T: 10

1. Insert the following overrides:

IND-N1048 Analog Value=340 N-41 Detector A IND-N1049 Analog Value=334 N-41 Detector E) INB-N1084 Analog Value=335 N-42 Detector A IND-NI 085 Analog Value=364 N-42 Detector B OND-N1099 Analog Value=317 N-43 Detector A !NB-N1100 Analog Value=347 N-43 Detector B INB-N1135 Analog Value=389 N-44 Detector A INB-NI 136 Analog Value=377 N-44 Detector B

2. When student is ready RUN 1 is critical because student must be able to read proper normalized detector current values in r to properly calculate the QPTW.

3 is critical because the student must record the detecter readings properly on Attachment I tQ tep 5: Must calculate correct QPTR (fO.OO1 if given in-plant). Tolerance is low because student is ven values and no interpretation is required. Tolerance is given solely for ioundoff error. Monday, March ZU,ZOQd Page 8 of 8

STP-108.001 ATTACHMENT I PAGE B OF 4 REVISION 7 SBTS NO. ~ CHANGE A TESTDATASHEET 2.0 PRECAUTIONS reviewed: Initials 5.0 INITIAL COMDITK"3 met: Initials 6.0 Method used (circle one): Step 6.'l SkQ 6.3 8.0 ACCEPTANCE CRITERIA met: Initials PERFORMED BY: DATE/TIME:

.PAM BIUEFIXG SHEET OPERA TOR INSTRUCT1O.W: SAFETY CQ.WIDERA TIOiW: INITIAL INITIATING The plant is operating at 100% power. (&I: The Shift Supervisor directs a Licensed Operator to perform a QPTR surveilla service. to IPCS being out of /tdT-v pGJ ;>..I., 772-6 r c &d! 3 EVALUATOR WHEN YOU FEEL THAT YOU Marrdu.p, Mnrch 29,2004 Puge 4 of8

EXCORE DETECTOR CURRENT READINGS NRC-A-002 I I DETECTOR A DETECTOR B N42 335 364 I I I

K Ce SUMMER NUCLEAR STATION JOB PERF NCE MEASURE JP.M NRCA-003 TAGQUP " C CHARGING PUMP APPRO VAL: APPROVAL DAlE: Munday, March 69,2004

TASK: TASK STANDA RD: NO:: 'c' CHG/SI Pump is tagged out IAW SAP-201. The pump is hydraulically isolated from the CVCS system, electrical power is removed from pump and valve motors, and pump is vented and drained. The correct tag hang sequence. is identified. The use of Human Performance Teols(3-way communications, self-checking, peer checking, phonetic alphabet, etc.) and industrial safety practices. PREFERRED E VXL LM TIO?JLOCA TION PREFERRED EVALUA TIONMETHOD CLASSROOM PERFORM SAP-201 DANGER TAGGING REFERENCBS: SAP201 DANGER TAGGING TOOLS: SAP-201 SAP-201, ATTATCHMENT la SAP-201, ATTATCHMENP IB SAP-201, ATTATCHMENP IC 8-302-875, Chemical and Volume Control ELECTRICAL FEEDER LIST FOR IDA, 1DB, and 1DB2Y SOP-102 VALVE LINEUPS TECH SPEC CROSS REFERENCE FOR XPP-0043C PERFORMANCE EATIXG: Motpdny, March 29,2004 30 TIAWE CBTICAAL NO 10CFR55: 45.13 IIME TIME FINISH SAT: 1JNS.KT: QUESl'lON GRADE: PERI.OKM.4NCE SIGXATKXE DATE Page 2 of 13

IIVSTRUCTIONS TO OPE= TOR READ TO OPERATOR: WHEN I TELL YOU TO BEGIN, YQU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING CUES. I WILL DESCRIBE: THE GENERAL CONDiTlONS UNDER WHICH THE TASK IS TO BE PERFORMED AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR RISCUSS, AND PROVIDE INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THLS JOB PERFORMANCE MEASURE WILL BE SATISFIEU. SAFETY C.'OhBIDERA TIOM: INITIAL The plant is in Mode 1. "c" CHGlSl PUMP (XPP00436) has developed a umps balancing line. msrgency Repair" tagout, generate a tagout for the %' CHG/SI Pump to facilitate flex gasket replacement. gs, or Locked Component Monday, March 29, 2004 Page 3 of 13

START: TIME:

STEPS CR SEQ STEP: 1 STEP STAAIVDARD: No Nu SYSTEM-Enter the system desinator Enters "CS" beside "SYSTEM" on affected by this Danger Tag. SAP-201, ATT. IA CUES: SAT Once the operator has determined th biNSAT completed, the evaluator will provide SAP401 is classified as "INFORM from memory; hcwever, the user retains accountability for proper performance. CUMMENZX hments lA, IB, and I C need to be cedure may be performed /' CR SEQ STEP: 2 STEP STrlilDARD: No No TRAIN - Enter Enters "S" beside "TTRAIN" on appropriate, ie. Attachment IA. SAT U'VSA T CLJES: COMMENTS: Monda.v, Mu~rii 29, 2004 Page 5 of 13

CR SEQ STEP: 3 STEP STANDARD: No No REASON FOR TAG - Enter a brief and Enters wording similar to "Replace Flex Gasket on ' C CHGlSl pump (XPWQ43C) " beside "REASON FOR TAG" on accurate account of work being performed or reason for equipment not to be operated, 1.9. MVVRs, PMs M when operation of the Attachment IA. equipment results in a hazard i SAT If operator wants to include nomendat e in addition to the valve number, examiner ELWAY" should ask "Where can you obtain th / nomenclature?" Operator should answer CUES: "CHAMPS". If so, examiner should say, "CHAMPS is unavailable, where else can you find the nomenclature?" Operator should answer "SOP valve lineups." When examinee volunteers "valve lineups" examiner should hand the operator SOP-102 valve lineups. COMMENZS: STEP STAXDARD: Enters wording similar to "Ensure deenergined and isolated and drained" beside "SAFETY REMINDEW on Attachment IA CR SEQ STEP: 4 /I' No No SAFETY REMINDER ~ I n d i 4 any precautions such as drainin, venting, special notes or hazards associat d with this tagout. SAT UWAT / ems: Operator may elect to include wording Similar to "Contaminated System: RWP required". COMMEAVTS: Momfay, March 29,2004 Pnge 6 af I3

CR SEQ STEP: 5 STEP STXNDARD: No No SAFETY RELATED Circle YES or NO. Circles "YES" beside "SAFETY /' RELATED" on Attachment IA. /' SAT UNSAT ,I STEP STANDARD: Circles "YES" beside "TECH SPE Attachment IA. / CUES: COMMENTS: CR SEQ STEP: 6 No No TECH SPEC - Circle YES or NO. CLiES: il. SAT Operator may ask for a Tech Sp c Cross Reference for XPP-0043C. If so, the LLVSAT evaluator will provide the Tech pec Cross Reference. Operator may ask for a Removal and Restoration (R&R) number (or the R&R form). Examiner should tell the operator "The NROATC is completing the R&R and will provide that number when the tagout is complete." P CQMWENTS: CR SEQ STEP: 7 No No PREPARED BY - Enter n me of the preparing this tagout pa kage. CUES: r CQMWENTS: Mmday,.Much 29,2004 individual STEP STANDARD: Enters own name beside 'PREPARED BY" on Attachment IA. SAT Pa.?+! 7 of 13

i I i CR SEQ STEP: 8 STEP STA.VDARD: No No ALTERNATESF Enter the May enter "Mechanical Supervisor" or "Foreman" under "MECH" and beside lead individual's NIA. Foreman o used in "ALTERNATES FOR CLEARANCE" on lieu of a specific al Attachment IA. Foreman CL'ES: SAT UASA T CO.MWEWS: CR SEQ . STEP: 9 STEP STAAYL4RD: No No MWR - Enter work activity number, ie MWR, Enters "041234" under "MWR" on PMTS, MRF, ECR or Attachment IA. STEP STANDARD: on Attachment IA. CL'ES: co'w'%fE.vTs: CR SEQ STEP: 10 CHAMPS Enters 'XPP0043C" under "EQUIPMENT" SAT should hand the operator the 1L4Sz4T CUES: Maintainence Work Request Sheet ("green sheer') included with this package. COMMENTS: Monday, March 29,2004 SAT UNSAT Page 8 of13

CR SEQ STEP: 11 STEP STAAD.4RD: No No RSP GRP - Enter the abbreviation for e Enters "MECH" under "RSP G R P on Attachment IA. discipline to which the work activity ' assigned. SAT WiV§'4 I- / i 1 CUES: COMMENTS: CR SEQ STEP: 12 STEP STAXDARD: No No COMPONENT I.D. -Enter the complete CHAMPS identification number of the component to be realigned. See completed Attachment IB. SAT If operator wants to include nomen ature in addition to the valve number, examiner WVS.4T CEE§: should ask 'Where can you obtain the nomenclature?" Operator should answer "CHAMPS". If so, examiner should say, "CHAMPS is unavailable, where else can you find the nomenclature?" Operator should answer "SOP valve lineups. When examinee volunteers "vaive lineups" examiner should hand the operator SOP-102 valve lineups.. COMMEiWS: CR SEQ STEP: 13 STEP STANDARD: No No PLANT LOCATION ~ Enter the specific plant location of the component o be realigned. See completed Attachment IB SAT hNSA T CWES: For this JPM, the building and elevati location. is all that is required for component COMWEX'B: Monda.v, March 29.2004 Page 9 of13

CR SEQ STEP: 14 STEP STANDARD: No No . BEQ'DOPEtWBbE PO the See completed Attachment iB. normal operable positio nent as specified by the applic SAT DNSA T COMMENTS: SI%P STANDARD: \\ See completed Attachment IC. Q STEP: 15 No TAG - Enter the sequential tag number. SA T LWSAT Tag number is not critical, only the sequence is. COMMENTS: CR Sh'Q STEP: 16 fld STEP STANDMW: No No ISSUED TO Check blocks for which See completed Attachment IC. discipline each component is tagged. SAT UXSAT COMMEATS:

Monday, March 29,2004 Page IO of 13

CR SEQ STEP: 17 STEP STANDARD: No No HOLD TAG INST - Enter a check mark if a Hold Tag is to be placed on a control panel component. See completed Attachment IC. CUES: SAT LWSA T COMMENTS: SEQ STEP: 18 \\-i STEP STAXDARD: No COMPONENT I.D. ~ Enter the complete CHAMPS identification number of the component being tagged. See completed Attachment IC. CUES: SAT If operator wants to include nomenclature in addition to the valve number, examiner U W A T should ask 'Where can you obtain the nomenclature? Operator should answer "CHAMPS". If so, examiner should say, "CHAMPS is unavailable, where else can you find the nomenclature?" Operator should answer "SOP valve lineups." When examinee volunteers "valve lineups" examiner should hand the operator SQP-102 valve lineups.. COMME.VZ7: SEQ STEP: 49 STEP STANDARD: o No PLANT LOC - Enter the specific plant location See completed Attachment IC. of the component beging tagged. CUES: SAT For this JPM, the building and elevation is all that is required for eompanent UASA T location. COMMENZS: Moonday, Murch 29,2004 Page Ii of 13

CR SEQ STEP: 20 STEP STA,VI?ARD: No REQ'D TAG POSIT - Enter the position in which the component is to be tagged. See completed Attachment IC. SAT ENSAT CO.WMEIVZY: CR SEQ STEP: 21 STEP STAXDAD: No INST SEQ - Enter sequence that tags are to be installed. If no sequence is needed, place a 1 in each INST SEQ black. If only some tags require a sequence, number these tags in sequence starting with 1 and ending with all tags not requiring sequence having the same number, for example, 1, 2. 3, 4, 4,4. See completed Attachment IC. COMME.VTS: Examiner ends JPM at this point. Monhj?, March 29,2004 Pnge 12 of13

JPM SETUP SHEET JPMiVO: NRC-A403 DESCRZPTION: TAGOUT " C CHARGING PUMP IC SET: JPMiVO: NRC-A403 DESCRZPTION: TAGOUT " C CHARGING PUMP IC SET: ZNSTR GrCTIQiVS: Monday, March 29,2004

I 1 I I I I I I I I I D S 1 8 f b n I1 El I e1 E tl I 01 I 91 I LI I I z E I t V

OPERA TOR LVSTRLiCa"IOLVS: SAFETY CONSIDERA T1O.V.Y: I.VITIAL "C" CHG/SI PUMP (XPP0043C) has developed a flex gasket on the pumps balancing line. has requested an "Emergency Repair" tagout, epiace flex gasket. Shift Supervisor directs you to generate a tagout for the 'c' GHGISI Pump (isolated,vented and drained) to facilitate flex gasket replacement. Completion of individual Danger Tags, Hold Tags, or Locked Component Tracking Sheets is NOT REQUIRED. HAVE SATISFACTORILY COMPLETED THE ASSIGNE Monday, Marcli 29,2004 Page 4 of 23

JPLWBRIEFING SHEET OPERATOR PMSTRLrCTPOMS: SAFETY COLVSIDERATIOIW: INITIAL An NLQ has been assigned the task of performing a valve lineup in the Auxiliary Building. The area where the valves ate located has a dose rate of 24 mWHr. and also has some airborne activity. From experience the NLO knows that it will take 45 minutes to perform the valve lineup with out a respirator, or 75 minutes to complete the job with a respirator. If the job is done without a respirator the NLO will receive 2 DAC-hours of internal exposure. You have been directed to: Determine the dose the MLQ will receive if he doesnt wear a respirator whiie performing the valve lineup and the dose he will receive if he wears a respirator. Report to the Shift Supervisor which method will be the lowest dose and keep exposure ALARA. HAVE SATISFACTOMLY COMPLETED THE Menday, March 29,2004 Page 4 of 7

( tu%-

R STATION NCE MEASURE NRC-A404 s with Airborne Activity Present APPRO VAL: APPRO VAL DATE: CAND[DATE-.~..- bX&UINER:..~ ~. .Moortdoy, March 29,2004 R STATION NCE MEASURE NRC-A404 s with Airborne Activity Present APPRO VAL: APPRO VAL DATE: LANDCDATE- - bX&UINER - .Moortdoy, March 29,2004 Pug@ I of 7

TASK: 343-029-03-03 E4SK STANDARD: Assess exposure limits of personnel for assigned duties NO:: Dose is correctly calculated with a respirator and without a respirator. GEN 2.3.1 Knowledge of 10 CFR: 20 and related facility radiation control requirements. (RO 2.6/SRO 3.0). GEN 2.3.4 Knowledge of facility MAW program. (RO 2.5/SR02.9) PEEFERRdD EVALUATION L O U TIOA' PREFERRED E VAL lL4 TIOX METHOD PLANT PERFORM REFEmlVCEs: TOOLS: EVAk UATIQN TIME 10 TIME CRITICAL NO 10CFR5.f: 43B4 CANDIDA TE: TIME TThlE FMISII: PERFORMAACE RA TIXG: SAT: UNSAT QCEWLON GKrWE PERFORMANCE ExA,1.INER: CQMMENZS: SIGNhrURP DATE Monday, March 29,2004 Page 2 of 7

W A R T TIME:

STEPS CR SEQ STEP: 1 STEP STANDARD: Yes No Calculates NLO dos Calculates the dose to the NLO without a = 18.0 mRem + respirator. 0.75 hours X 2 DAC hours 18.0 + 5 mRem ems: SAT UNSA T CO.WMENTS: CR SI@ STEP: 2 STEP SITANDARD: Yes No Calculates NLO dose Calculates the dose to the NbO with a respirator 1.25 hours X 24 mRemlhour = 40 mRem. / CUES: SAT UXSA T COMMBNT.9: STEP STAXDARD: Reports to Shift Supewisor that performance of work should be performed without a respirator to achieve a dose that is ALARA. CR SEQ STEP: 3 Yes No job should be performed and reports findings to CUES: COMMENTS: A4oonJa.v..March 29,2004 SAT UN.9'4 T Page 5 of 7

Examiner ends JPM at this point Monday, March 29,2004

P5ge 7 of 7

V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE

  • =e--.

JPM NO: JPPF-028 STARTUP AND PARALLEL A ROD DRIVE MW SET APPROVAL: TRH APPROVAL DATE: 07/07/2003 CANDIDATE ~ .~ EXAMINER Page I of I I

TASK: 001 -007-01 -04 TASK STAXDARD: STARTUP THE FULL LENGTH ROD CONTROL SYSTEM The "#1" rod drive MIG set has been started and parallel has been attempted. Due to the failure to parallel, the operator restores 81 MG set to standby status in accordance with Step lll.A.2.3.c. The use of applicable Human Performance Tools (3-way communications, self checking, pser checking, phonetic alphabet, etc) and industrial safety practices meets expectations. PREFERRED EVALVA TION LOCATION PREFERRED EVALUATION METHOD PLANT SIMULATE

REFERENCES:

SOP-403 ROD CONTRQL AND POSITION INDICATING SYSTEh TOOLS: SOP-403 SECTION III.A, STEPS 2.1 AND 2.3 EVALUATION TI.ME 20 T M E CRITICAL No 10CFR55: 45(a)l Il'ednusduy, March 24, 2004 V. Page 2 of11

INSTRUCTIOXS TO OPERATOR REAZ) TO OPEZUTOR: WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE INITIATING CUES. WHEN YQU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB PERFORMANCE MEASURE WILL BE SATISFIED. ZNZTZAL CONDZTIOA: A plant heatup is in progress. Initial conditions for startup of the red drive M/G sets have been completed per SOP-403, Section 1lI.A. The "#2" Rod Drive Motor Generator is already running. ZA'ZTZAZZNG CUES: NROATC directs that #1 red drive M/G set be started and paralleled in accordance with SOP-403, Section III.A, Steps 2.1 and 2.3. iATNO TIMEAR YOU TO OPERATE

ANY PLANT EQUIPMlENT!

I I Wednrsduy, March 24. 2004 Page 3 uf 11

.IPM BRIEFING SHEET OPERA TOR INSTRUCTIONS: SAFETY COA'SIDERA TIOAW INITIAL COA7DITION: A plant heatup is in progress. Initial conditions for startup of the rod drive M/G sets have been completed per SOP-403, Section 1II.A. The "#2" Rod Drive Motor Generator is already running. INITIATING CEES: NROATC directs that #1 rod drive MIG set be started and paralleled in accordance with SOP-403, Section IIM, Steps 2.1 and 2.3. I I

AT NO TiME ARE YOU TO OPERATE ANY
PLANT EQUIPMENT!

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK. Wednesdaj, March 24,2004 Page 4 of 11

STEPS CR SEQ STEP: 1 STEP STANDARI): No Yes Place VOLTMETER selector is position 1-2. Positions M/G set 81 VOLTMETER selector switch to the 1-2 position. ~- CUES: SAT LJhJSA 1' Cue operator before entering Rod Control Room to point to each operation performed and indication observed due to high noise area. Operator may use a pad of paper to write down additional information for examiner. Cue operator that voltmeter selector switch is in position 1-2. COMMEh7ZS: CR SEQ STEP: 2 STEP STAXDARI): No Yes Adjust VOLTAGE ADJUST potentiometer to Adjusts VOLTAGE ADJUST minimum by releasing the lock and turning fully counterclockwise. potentiometer to minimum by releasing the lock and rotating potentiometer fully counterclockwise. ~~~~ ~~~~~ ~ CUES: SAT UNSA T Cue operator that VOLTAGE ADJUST potentiometer has been turned fully counterclockwise. CUMMEi\\J1;F: CR SEQ STEP: 3 STEP STANDARD: No Yes Place AMMETER selector in position A. Places M E set #1 AMMETER selector switch to the " A position. CUES: SAT LWS.4 T Cue operator that AMMETER switch is in the " A position. COMMENTS: Wednesday, March 24,2004 Page 5of 11

CR SEQ STEP: 4 STEP STANDARL): Yes Yes Close MOTOR Breaker to start MIG #l. Positions MIG set #1 MOTOR Breaker to CLOSE position. Ct7ES: SAT After operator describes the expected response, then cue operator that the red ETA,sAT light is lit on MIG set #1 and the green light is off. COMhfEiVtS: CR SEQ STEP: 5 STEP STANDARB: Yes Yes Depress and hold GEN FIELD FLASH Depresses and holds GEN FIELD pushbutton until voltage is at least 235 VOLTS as indicated by GENERATOR LINE VOLTS, then release. releases pushbutton. FLASK pushbutton until voltage reads at least 235 volts on voltmeter and then ~~ CUES: SAT Examiner informs operator that the voltmeter reads 240 volt after field flash by ULvsAT pointing at indication. COMhfENTS: ~ CR SEQ STEP: 6 STEP STANDARD: Yes Yes Adjust VOLTAGE ADJUST potentiometer Adjusts VOLTAGE ADJUST clockwise until 255 TO 265 VOLTS is indicated by GENERATOR LINE VOLTS. potentiometer clockwise until voltage meter at MIG control panel for #1 MIG set indicates 260

  • 5 volts.

CCJES: SAT UNSA T Cue operator that voltage increases to 260 VOLT§ (as seen) by pointing at indication. CUMiWEi\\TS: Wedne\\day, March 24,2001 Page 6 o f I I

CR SEQ STEP: 7 STEP STANDARD: No Yes With the VOLTMETER selector in position 2-Verifies 260 a 5 volts on voltmeter phase 2-3 by placing voltmeter selector switch to the 2-3 position. 3, verify indication is between 255 and 265 volts. ~ ~ ~ ~ ~ ~ ~ ~ ~ ~. CUES: SAT CNSA T Examiner informs operator that each phase indicates 260 volts when each phase is selected by pointing at indication. COMMENTS: C,X SEQ STEP: 8 STEP STANDARD: No Yes With the VQLTMETER selector in position 3-Verifies 260 5 volts on voltmeter 1, verify indication is between 255 and 265 volts. phase 3-1 by placing voltmeter selector switch to the 3-1 position. ~ CUES: SA T UNSA T Examiner informs operator that each phase indicates 260 volts when each phase is selected by pointing at indication. CR SEQ STEP: 9 STEP STANDARD: No Yes Lock the VOLTAGE ADJUST potentiometer. Locks the Voltage Adjust potentiometer. CLES: SAT If performed correctly, cue operator that the voltage adjust potentiometer is CWSA T lacked. COMMENTS: Wednesday, Murch 24, 2004 Page 7 o f I I

CR SEQ s r m : IO STEP SIAh'DARD: Yes Yes Parallel Generator No. 1 as follows: Turn Positions the Generator No.1 Generator No.1 SYNCHRONIZE Switch ON. SYNCHRONIZE Switch to the ON position. CIIES: SAT Examiner informs operator that #2 M/G set IS already running per step 2.2 SOP-UlvsAT COM-WENTS: 403 and the #2 M/G set generator breaker is as-is if information is requested. ~ CR SEQ STEP: 11 STEP STANDARD: Yes Yes Place Generator No. 1 GENERATOR Positions the M/G set #1 GENERATOR Breaker Switch to CLOSE. circuit breaker switch to the CLOSE position. ~ _ _ _ CUES: SAT After examinee describes expected actions, cue operator that green light is off ti:asAT and that red light is lit by pointing to indication. COMMENTS: CR SEQ STEP: 12 STEP STAXDARD: Yes Yes Verify GENERATOR No. 1 GENERATOR Verifies M/G set #I generator breaker Breaker closed. closed by red light indicator lit for #1 M/G generator breaker. CUES: SA I' After examinee describes expected actions, cue examinee that green light is lit and that the red light is off by pointing to M/G set #1 generator circuit breaker. Inform examinee that conditions have not changed for TWO (2) minutes. NOTE: This indicates a failure to parallel, the examinee should perform the following steps. (13 -18). COMMENTS: t ; N, ~ A ~ Wednesday, March 24, 2004 Page 8 of I1

CR SEQ STEP: 13 STEP SlilNDARD: ~.. Yes Yes Place Generator No. 1 GENERATOR Positions the M M set #I GENERATOR Breaker Switch to TRIP. circuit breaker switch to the TRIP position. CL'ES: SAT After examinee describes expected actions, cue operator that green light is ON and that red light is OFF by pointing to indication. C:(IMMEh"TS: c,xsA1' CR SEQ STEP: 14 STEP STANDARD: No Yes Turn Generator No. I SYNCHRONIZE Positions Generator No. i Switch to OFF. SYNCHRONIZE switch to the OFF position. CUES: SAT L'NSA T After examinee describes expected actions, cue operator that MIG set #1 synchronizer is in OFF position. COM34ENT.Y: CR SEQ STEP: 15 STEP STANDARD: Yes Yes Readjust VOLTAGE ADJUST potentiometer Readjusts VOLTAGE ADJUST clockwise until 255 TO 265 VOLTS is indicated by GENERATOR LINE VOLTS. potentiometer clockwise until voltage meter at M/G control panel for #I MIG set indicates 260 f 5 volts. ~. [INSAT Cue operator that voltage increases to 260 VOLTS (as seen) by pointing at indication. Wednehday, March 24,2004 Page 9 of I1

CR SEQ STEP: 16 s1'EP STANDARD: ~ - ~, No Yes Turn Generator No. 1 SYNCHRONIZE Positions Generator No. 1 Switch to ON. SYNCHRONIZE switch to the ON position. ~. CUES: SAT L:1ISA T After examinee describes expected actions, cue operator that M/G set #I synchronizer is in ON position. COM.ME"S: CR SEQ STEP: 17 Yes Yes Place Generator No. 1 GENERATOR Breaker Switch to CLOSE. STEP STANDARD: Positions the MIG set #1 GENERATOR circuit breaker switch to the CLOSE position. CUES: SA 1 After examinee describes expected actions, cue operator that green light is off U ~ ~ S A T COMMENTS: and that red light is lit by pointing to indication. a STEP STANDARD: CR SEQ STEP: 18 No No Verify Generator No. 1 GENERATOR Verifies Generator No. 1 GENERATOR breaker closed. breaker closed. UJES: SA T After examinee describes expected actions, cue operator that green light is off u, v, ~ r and that red light is lit by pointing to Generator Breaker indication. COMMEXTS: Examiner ends JPM at this point. Wedraesduy, March 24,2004 Page 10 of I1

JPM SETUP SHEET JPMNO: JPPF-028 DESCRIPTION: STARTUP AND PARALLEL A ROB DRIVE M E §ET IC SET: INSTRUCTIOi1Ts': IVednrsda)'. March 24, 21104 Page 11 of 11

V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE JPM NO: JPP-108 LOCALLY SHED NOM-ESSENTIAL UC LQAUS APPROVAL: TRH APPKOVAL DATE: 07/31/2003 REVh'O: 9 CANDIDATE EXAMINBR Wednesday, March 24,2004 Page I o f 9

TASK: 000-1 14-05-04 RESPOND TO LOSS OF ALL ENGINEERING SAFETY FEATURES ALTERNATING CURRENT POWER TASK STARTDARD: Nonessential DC loads have been shed per EQP-6.0. Attachment 2. The use of applicable Human Performance Tools (3-way communications, self checking, peer checking, phonetic alphabet, etc) and industrial safety practices meets expectations. PREFERRED EVALUATION LOCATION PLANT

REFERENCES:

EO$-6.0 TOOLS: EOP-6.0, Attachment 2 FLASHLIGHT EVALUATION TIME 15 CANDIDATE: PERFORMANCE RATING: SAT PREFERRED EVALUATION METHOD SIMULATE LOSS OF ALL ESF AC POWER TIME CRITICAL No IOCFRSS: 45(a)8 Wednesday, March 24,2004 Page 2 of9

INSTRUCTIONS TO OPERATOR READ TO OPERATOR: WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE INITIATING CUES WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB PERFORMANCE MEASURE WILL BE SATISFIED SAFETY CONSIDERATIONS: INITIAL CONDITIOAr: The plant is at 100% power when a station blackout occurs, with subsequent entry into EOP-6.0. INITIATING CUES: Control Roam Supervisor directs stripping nonessential BC loads per EOP-6.0, Attachment 2. Wednesday, Marrir 24,2004 Page 3 of 9

JPM BRIEFING SHEET \\ _ OPERATOR INSTRUCTIONS: SAFETY CONSIDERA TIONS: IhTTIAI, CONDITION: The plant is at 100% power when a station blackout QCCUIS, with subsequent entry into EQP-6.0. INITIATING ClJES: Control Room Supervisor directs stripping nonessential DC loads per EOP-6.0, Attachment 2. HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE -.e ASSIGNED TASK. Wednesday, March 24,2004 Page 4 of 9

STEPS CR SEQ STEP: 1 STEP STANDARD: Yes Yes Close GEN GAS PURGING SYS Operator closes GEN GAS PURGING HYDROGEN SUPPLY valve (TB-412). SYS HYDROGEN SUPPLY VLV (XVr12225-HY) by turning valve handwheel in the clockwise direction until the valve is closed. CUES: Valve turns clockwise then stops COMMENTS: SAT UNSAT CR SEQ STEP: 2 STEP STANDARD: Yes Yes Open HYDROGEN-CARBON DIOXIDE Operator opens HYDROGEN-CARBON XCONN VALVE (TB-412). DIOXIDE XCONN VALVE (XVT-12218-HY) by turning the handwheel in the counter-clockwise direction until the valve is open. CUES: Valve turns counter-clockwise then stops COMMEh'TS: Wednesday, Murch 24,2009 SAT Page 5 of 9

CR SEQ STEP: 3 ~ Yes Yes Open CARBON DIOXIDE VENT HEADER ISOL VALVE (TB-412). STEP STAA'DARD: Operator opens CARBON DIOXIDE VENT HEADER ISOL VALVE (XVTl0556-CD) by turning the valve handwheel in the counter-clockwise direction until the valve is open CUES: Valve turns counter-clockwise then stops. COMMEVTS: CR SEQ STEP: 4 Yes Yes Open MAIN CONDENSER A & B VACUUM BREAKER (TE-436). CUES: SAT UA'SAT STEP STANDARD: Operator opens MAIN CONDENSER AR) operating the Declutch mechanism and turning the handwheel CCW until handwheel stops. A&B VACUUM BREAKER (XVEOOlOl-SAT Valve position indicator is not calibrated and therefore not required for this step. Valve turns clockwise then stops. COMMENTS: UN,~AT.-__ CR SEQ STEP: 5 STEP STAXDARD: No Yes Check if the MFW pumps have stopped. Operator verifies that the shafts of the (TB-436). MFW pumps are stopped. CUES: SAT When requested. inform the examinee that each MFW pump shaft is stopped UNSAT COMMENTS: Wednesday? March 24,2004 Pa@ 6 of 9

CR SEQ STEP: 6 STEP STANDARD: No Yes Check if the Main Turbine has stopped. (TB-Operator verifies that the main turbine 463). shaft has stopped. CUES: SAT When requested inform the examinee that Main Turbine speed indicates "zero". UNsAT COMMENlS: ~ CR SEQ STEP: 7 STEP STANDARD: No Yes Check that IPI-5130, MACHINE Operator verifies that IPI-5130 indicates HYDROGEN GAS PRESSURE INDICATOR, indicates less than 5 psig. (TB-412). less than 5 psig on the Turbine/Generator Auxiliary Panel. CUES: SAT Cue examinee that 20 minutes has elapsed and hydrogen pressure indicates C"SAT "zero" after XVTl0556 is opened. COMMENZS: ~ ~ _ _ CR SEQ STEP: a STEP STANDARD: Yes Yes De-energize TPP00224, (B), (C) - FWPT Operator opens breaker for EMERGENCY BEARING OIL PP (TB-412). FWPA(B)(C) - FWP EBOQ (XSX0002A(B)(C)) from Panel DPN-2X 01 (02)(03) after FW pumps stop. ClJES: SAT UNSA T If requested, inform the examinee that each MFW pump shaft is stopped. ~ COMMENTS: Wednesday, March 24,2004 i Page 7 of 9

CR SEQ STEP: 9 Yes Yes De-energize EMERGENCY SEAL OIL PUMP, XPTTOoOl-PP3 (TB-412). STEP STANDARD: Operator de-energizes X I PO001 -FY3 EMEHGENCY SEAL OIL PUMP from ?ace1 DPN.QX by ope'ling breaker #4. CUES: If requested, inform operator that machine gas pressure is < 5 psig. COMMENTS: CR SEQ STEP: 10 STEP STANDARD: Yes Yes De-energize breaker for EBOP (XSXOOCS) Operator deenergizes MAIN TURB. EMERG. BEARING OIL PP, (XQROOI), by opening breaker 05 (XSXOOOS) on BPN-ZX, after the Main Turbine has stopped. (TB-412). CUES: If requested, inform examinee that Main Turbine shaft has stopped COMMENTS: Examiner ends JPM at this point U'ednesduy, Murch 24,2004 Page 8 of 9

JPM SETUP SHEET .d JP.%f,VU: JPP-108 DESCRIPTION: LOCALLY SHED NON-ESSENTIAL DC LOADS IC SET: INSTRUCTIONS: COMMENTS: Wedizesduy, Murch 24,2004 L. Puge 9 of 9

V.C. SUMMER NUCLEAR STATION JQB PERFORMANCE MEASURE JPM JPPF-301 LOSS OF CONTAINMENT INTEGRITY (MVG-6797) APPROVAL: APPROVAL DATE: REV NO: Wednesday, March 10,2004 Page 1 of 7

TASK: TASK STANDARD: NO:. Fire service to the Reactor Building is isolated per EOP 1.Or Attachment 4 and 5. The use of the PREFERRED EVALUATION LOCA TION PREFERRED EVALUATION METHOD PLANT SIMULATE

REFERENCES:

EOP-I.o REACTOR TRIP/SAFTY INJECTION ACTUATION TOOLS: EOP 1.O Attachment 4, page 3 of 4 EOP 1.0 Attachment 5, page 2 of 4 OAP 100.5 GUIDELINES FOR CONFIGURATION CONTROL AND OPERATION OF PLANT EQUIPMENT, Step 9.5 EVALCJATION TIME 10 TIME CRITICAL NO IOCFRSS: CAXDIDA TE: TIME START TIME RMSH PERFORMANCE RATING: SAT: LXLSAT u QUESTION FR.ADE PEKFORMANCE EXAMIAER: CQMMENTS: Wednesday, March 10,2004 SICKATCRE UATE Page 2 of 7

INSTRUCTIONS TU OPERATOR READ TO OPERATOR: WHEN I TELL YOU TO BEGIN. YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB PERFORMANCE MEASURE WILL BE SATISFIED. L SAFETY CONSIDERATKONS: INZTKAL CONDITION: The plant has experienced an SI from 100% power with the CRS implementing EOP 1.O. The BOP operator, while performing EOP 1.O, notes that the status light for SAFETY INJECTION PHASE A lSOb on XCP 6104 for FIRE SERV ISOL 6797 CLSD is dim, indicating the valve has failed to close on a valid phase "W containment isolation signal. The CMC switch on the MCB for MVG 6797 has no white indicating lights, and the red OPEN light is lit and the green CLOSE llght is not lit. KNPI'KATINC; CUES: The Control Room Supervisor directs you to close MVG-6797 manually as the BACKUP ISOLATION to XVG06797-FS per EOP 1.O, Attachment 5, page 2 of 4. AT NO TIME ARE YOU TO OPERATE ANY PLANT EQUIPMENT! HAND JPM BRIEFING SHEET TO OPERATOR AT 1'111s TIME! applicable Human Performance Tools (3-way communications, self checking, peer checking, phonetic Wdnesdny, March 10, 2004 Page 3 of 7

'TIME:

JPM BRIEFING SHEET OPERA TOR ILVSI'KUCTIONbS: SAFETY CONSIDERA I'IONS: INITIAL CONDIIIIION: The plant has experienced an SI from 100% power with the CRS implementing EOP 1.O. The BOP operator, while performing EOP 1.O, notes that the status light for SAFETY INJECTION PHASE A ISOL on XCP 6104 for FIRE SEWV SOL 6797 CLSD is dim, indicating the valve has failed to close on a valid phase "A containment isolation signal. The CMC switch on the MCB for MVG 6797 has no white indicating lights, and the red OPEN light is lit and the green CLOSE light is not lit. INITIATING CIJES: The Control Room Supervisor directs you to close MVG-6747 manually as the BACKUP ISOLATION to XVG06797-FS per EOP 1.O, Attachment 5, page 2 of 4. ATNO T/MEARE YOU TO OPERATEANY PLANT EQUIPMENT! alphabet, etc.) and industrial safety practices meets expectations. ASSIGNED TASK. Wednesday, March l0,2004 Page I of 7

STEPS CR SEQ STEP: 1 STEP STANDARD: No No Puli down on the declutch lever, to disconnect Examinee simulates pushing the declutching lever away from the the motor from the handwheel via a clutch assembly. handwheel. CUES: SAT If examinee mentions checking the breaker first and/or opening the breaker prior to KVSAT operation of the valve manually, inform the examinee that 1 BB2Y 23 AD, FS TO RB CHARCOAL CLEANUP SYS 4A-4B ORC XVG 6797-F§, has already been checked. The overloads were found tripped and could not be reset, and the breaker was opened. COMMENTS: CR SEQ STEP: 2 STEP STANDARD: No No Turn the handwheel in the clockwise direction The examinee simulates turning the valve handwheel in the clockwise (closed) direction until movement stops. CUES: SAT Cue to examinee that the handwheel rotated manually for several revolutions and UNSAT then stopped. COMMEIL'I'S: Wednesduy,.Wurch 10,2004 Pa@ 5 of 7

CR SEQ STEP: 3 STEP STANDARD: No No Leave declutch lever in the down (motor Examinee simulates releasing the disengaged) position. The motor will declutching lever. re-engage when motion is demanded electrically. CUES: SAT There is no reliable valve position indication on an MOV. Cue the operator that the L'NSAT CRS has informed the operator that the SAFETY INJECTION PHASE A ISOL monitor light on XCP 6404 for FIRE SERV I W L 6797 CLSD light is now BRIGHT. Examiner ends JPM at this point. Wednasdq, March 10,2004 Page 6 of 7

JPM SETUP SHEET JPM NO: JPPF-301 DESCRIPTIOIV: LOSS OF CONTAINMENT INTEGRITY (MVG-6797) IC SET: INSTRUCTIONS: COMMENTS: Wednesday, March 10,2004 Page 7 of 7

V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE JPM JPSF-002 TRANSFER TO HOT LEG RECIRCULATION APPROVAL: APPROVhL DhlE: REVNO: 6 CANDIP ATE EX/U1IIVER Wednesday, March IO, 2004 Page I of I 1

TASK: 000-1 37-05-01 TRANSFER RHR FROM COLD LEG TO HOT LEG RECIRCULATION TASK STANDARD: NO:: Safety Injection system has been aligned for Hot Leg Recirculation. Charging pumps haw not been runout or deadheaded. The use of applicable Human Performance Tools (Sway communications, self checking, peer checking, phonetic alphabet, etc) and industrial safety practices meets expectations. PREFERRED EVALUATION LOCATION PREFERRED EVAGLTA TIOh' METHOD SIMULATOR

REFERENCES:

EOP-2.0 EOP-2.3 'rooLs: EVALUATION TIME CANDIDATE: PEIWORhfANCE RATING: EXAMINER: COMMENTS: Wednesday, March 10,2004 PERFORM LOSS OF REACTOR OR SECONDARY COOLANT TRANSFER TO HOT LEG RECIRCULATION 10 TIME CRITICAL No loCFR55: 45(a)7 TIME START: TIME FINISH: SAT: UNSAT QUESTION GRADE: PERFORM ANCE SIGNATURE DATE Page 2 of 11

IA'STRUCTIONS TO OPERATOR READ TO OPERATOR: WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED AND PROVIDE THE NECESSARY TOOLS WITH WHIW TO PERFORM THIS TASK. BEFORE STARTING, I WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB PERFORMANCE MEASURE WILL BE SATISFIED SAFETY CONSlDERA TIONS: INITlAL CONDITlON: It has been 8 hours since a Loss of Coolant Accident occurred and the plant is presently in the Cold Leg Recirculation mode. The CRS has entered EOP-2.3 (Hot Leg Recirculation) from EOP-2.0. CHG/§I Pump C is aligned to " B hain. INITIATING CUES: The CRS directs the NROATC to transfer from Cold Leg to Hot Leg Recirculation per EOP-2.3. HAND JPM BRIEFING M E E T TO OFEKATOR AT THIS TIME! Wednecday, March IO, 2004 P a p 3 of I1

TME:

JPM BRIEFING SHEET OPERA TOR ZiVSTRC%TIONS: SAFETY CONSlDER.4 TIONS: IhZTlAL CONDIllON: It has been 8 hours since a Lass of Coolant Accident occurred and the plant is presently in the Cold Leg Recirculation mode. The CRS has entered EOP-2.3 (Hot Leg Recirculation) from EOQ-2.0. CHGiSl Pump C is aligned to B train. INZTZATZNG CUES: The CRS directs the NROATC to transfer from Cold beg to Hot Leg Recirculation per EOP-2.3. HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK. Wedriesday, March 10, 2004 ._I Page 4 of11

STEPS CK SEQ STEP: 1 STEP STANDARD: - Ye Yes Stop the Charging Pump on "A" Train CHG/SI Pump 'A indicates OFF SAT Charging Pump " A is still running when 8885 is closed, it will be deadheaded; this onstitutes failure. Running the charging pump with both 8885 and a 8 4 runs the mp out, also failing. UNSA T CK SEQ STEP: 2 No Yes Check if CHG/SI Pump C is aligned to Train A by verifying XFER switch XET 2002C on Train A is lit. CUES: COMMENTS: CH SEQ STEP: 3 Ye Yes Ensure MVG-8132A(B), CHG PP C TO LP A BISCH, are closed. CUES: COMMENTS: STEP SlAiVDAKD: XFER SWITCH XET 2002C on Train A is not lit, directing the operator to alternative action step 1.b. SAT UNSAT STEP STANDARD: MVG-8132A and MVG-81328, CHG PPL C TO bP A BISCH, indicate CLOSE. SAT UNSAT Wedrresrlay, March 10,2004 PageSofII

CR SEQ STEP: 4 STEP STANDARD: Ye Yes Close charging LP "A" ALT to COLD LEG MVG-8%%5, CHG LP A TO COLD LEGS, (MVG-8885). indicates CLOSE. CUES: C0M.WENT.S: SAT UNSA T CR SEQ STEP: 5 STEP STANDARD: Ye Yes Open CHG LP "A" to HOT LEGS (MVG-8884). MVG-8884, CHG LP A TO HOP LEGS, indicates OPEN. CUES: COMMENTS: CR SEQ STEP: 6 Ye No Start " A Charging Pump CUES: COMMELVI'S: Wednrsday, March 10, 2004 SAT UNSAT STEP STANDARD: CHG/SI PUMP " A indicates ON with normal running amps. SAT Uh'SA T PageduflI

CR SEQ STEP: 7 Ye Yes Stop "B" charging pump. CUES: CR SEQ STEP: 8 No Yes Check if 'c' charging pump is aligned to Train B. CUES: COMMENTS: CK SEQ STEP: 9 STEP STANDARD: CHGlSI Pump 't3' indicates OFF with 0 amps. SAT UNSAT STEP STANDARD: Verifies XFER SWITCH XET2000C ON TRAIN B is lit. SAT UhSA T STEP STANDARD: No Yes Ensum MVG-8132A and MVG-$1328, CHG PP MVG-8132A and MVG-81328, CHG PP C C TO bP A DISCH, are closed. TO bP A DISC#, indicate CLOSE. CUES: COMMEXT s: Wednesduy, &furrh 10,2004 SA T UNSA T Puge 7 of I1

CR SEQ STEP: 10 STEP STANDARD: No Yes Verify HI HEAD to COLD LEG INJECTION MVG-8801A, HI HEAD TO COLD LEG INJ (MVG-88OlA) is closed. indicates CLOSE. CUES: COMMENTS: SA I' UNSA T CR SEQ STEP: 11 STEP STANDARD: Ye Yes Close HI HEAD TO COLD LEG INJECTION valve MVG-8801 B, Hi HEAD TO COLD LEG INJ MVG-8801 B. indicates CLOSE. CUES: SAT constitutes failure of the JPM. pi'/v & z + ~ / N COMMENTS: /k-If 8801 B is closed with "B" Charging Pump running, this deadheads the pump and UNSAT . ( N2a-- ~~7 -$ CR SEQ STEP: 42 STEP STANDARD: Ye Yes Open MVG-8886,CHG LOOP "B" in HOT LEGS. MVG-8886, CHG LP B TO HOT LEGS, I indicates OPEN. CUES: COMMENTS: Wednesday, March IO, 2004 SAT UNSAT Page 8 of 11

CR SEQ STEP: 13 Ye No Start "5" CHGiSl pump. STEP STAiVIEARD: b s,d7 /ci"' 4 P" C#G/SI Pump 'B' indicates OFF with zero running amps, and annuciator XCP 614. 4-2, CHG PP BIC TRIP is received. The NRO should review the ARP for XCP 614, 4-2 and recognize that the only step which will result in a success path would be the direction that if "8'. Charging Pump is inoperable, then align "C" Charging Pump to '.B" train. CUES: SAT If requested, IB A0 andlor electical maintenance personnel will investigate and UNSAT determine that a breaker malfunction exists and they estimate 6 hours to complete changeout and testing. COMMENTS: CR SEQ STEP: 14 STEP STANDARD: No No Align Charging Pump on Train C to B train electically. Place "3" Charging Pump in PTL, direct I5 A 0 to rack down "3" Charging Pump, ensure "C" Charging Pump ("B" train) is in PTL, direct IB AB to rack up "C" Charging Pump ("E? train). CUES: SAT If requested, SOP 102, Att VB, Charging Pump C to Train 3 lineup had previously UNSAT been performed and verified, with the exception of racking down "B" Charging Pump breaker and racking in "C" Charging Pump ("B" train). Booth operator should request NRO to verify both Charging pump switches are in PTL prior to racking breakers up or down: IAW SOP 313. COMMENTS: Wednesday, March PO, 2004 i

CR SEQ STEP: 15 STEP STANDARD: No No Start the Charging Pump on Train B (PUMP B or C). running amps. C#G/SI Pump " C indicates ON and normal CUES: This completes this JPM. COMMENTS: Examiner ends JPM at this point. Wednesday, March 10, 2004 .__/ SAT UNSAT Page 10 of 11

JPM SETUP SHEET JPM NU: JPSF-002 DESCRZPTZON: TRANSFER TO HOT LEG RECIRCULATION K S E T : 10 ZNSTRUCTZUNS:

1. Activate MAL-RCS005A RCS Loop 'A DBA LOCA
2. RUN
3. Perform actions of EOP-1.O and 2.0
4. FREEZE
5. Ensure RHR Sump Level >415', then activate LOA-AUXll5 SEVERITY=0.17 (17% in RWST)
6. RUN
7. Transfer Cold Leg Injection to Cold Leg Recirculation IAW EOP-2.2.
8. To shift CCW to fast speed during EQP-2.2:

LOA-CCW050 SELECT-FAST SPEED 'A CCW Pump Speed Switch to fast or LOA-CCW052 SELECT=FAST SPEED 'c' CCW Pump Speed Switch to fast

9. FWEEZE
10. When student is ready:

RUN COMMENTS: Charging Pumps must be stopped before opening Hot Leg High Head Valves (8884/8886) to prevent pump runout. Wednesday, March 10, bOQ4 Page 11 of11

V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE JPM NO: JPS-023 OPERATE THE CVCS SYSTEM TO INCREASE RCSPRESSURE APPROVAL: TRH APPROVAL DATE: 06/19/2003 KEVMO: 3 Wednesday, March 24,2004 ./ Page 1 of 8

TASK: 004-032-01 4 1 OPERATE CHEMIC* AN5 VOLUME CONTROL SYSTEM TO INCREASE REACTOR COOLANT SYSTEM PRESSURE TASK STANDARD: RCS pressure has been increased to 350-425 psig without lifting RHR suction relief and is stable PREFERRED EVALUATION METHOD PREFERRED EVALUATION WCATION SIMULATOR PERFORM REFERENCES': SOP-I 02 CHEMICAL AND VOLUME CONTROL SYSTEM EVALUATION TIME 15 TIME CWTICAL No IOCFRSS: 45(a)6 __.~ CANDIDATE: TME W A R T TME FlNISH PERFORMANCE RATING: SAT: UNSAT ~ PERFORMANCE TIME Q[JESIlON GRADE: ,/' ~ ~ .~ EXAMINER: ~ ~~~~~~~ SlGNATilRE DATE COMMENTS: Wednesday, March 24,2004 XSd Page 2 of 8

INSTRUCTIONS TO OPERATOR READ TO OPERATOR: WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING CUES. I W l U DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOB THIS JOB PERFORMANCE MEASURE WILL BE SATISFIED. SAFETY CONSIDERATIONS: INITIAL CONDITION: The plant has been in long term cold shutdown due to refueling. The RCS is in solid plant conditions with RCS pressure at 50 psg and the RHR system in operation. INITIATING CUES: The CRS directs that RCS pressure be increased to 350-425 psig per SOP-102, Section III.C., by performing step 2.1 and 2.2 so that a reactor coolant pump may be started for plant heatup. HhXD JPM BRIEFING SHEEI TO OPER4TOR AT THl§ TIME! Wrdnesdqv, March 24,2004 Page 3 of 8

JPM BRIEFING SHEET OPERA TOR INSTRUCTIONS: SAFETY CONSIDERATIONS: INITIAL CONDITION: The plant has been in long term cold shutdown due to refueling. The WCS is in solid plant conditions with RCS pressure at e 50 psis and the RHR system in operation. INITIATING CUES: The CRS directs that RCS pressure be increased to 350-425 psig per SOP-102, Section III.C., by performing step 2.1 and 2.2 so that a reactor coolant pump may be started for plant heatup. HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK. Wednesday, March 24,2005 Page 4 of 8

STEPS CR SEQ STEP: 1 STEP STANDARD: No Ne Ensure RCP seal leakoff valves are open. PVT-8141 A (B,C) A (5) (C) SEAL LKOFF indicate OPEN. CUES: COMMENTS: CR SEQ STEP: 2 No No Ensure normal letdown available. CUES: COMMENTS: SAT CNSAT STEP STANDARD: LCV-459 and 460, PVT-8152, LTDN LINE ISOL, and 8149A, B, C, LTDN ORIFICE A (B) (C) ISOL indicate OPEN. SAT UNSAT CR SEQ STEP: 3 STEP STANDARD: Yes Yes Adjust PCV-145 controller to increase RCS Decreases PCV-145 controller output to pressure. close PCV-145. CCE.7: SAT UNSAT Wednesday, March 24,2004 Page 5 of 8

CR SEQ STEP: 4 STEP STANDARD: No Yes Monitor RCS pressure meters and/or Monitors N.R. and/or W.R. 86s recorders to observe trend in RCS pressure. pressure meters and recorders to determine increase in RCS pressure above 50 psig. CUES: SAT UNSA T COMMENTS: CR SEQ STEP: 5 No No Establish RCP Seal Water Return. CUES: STEP STANDARD: MVT-8112 SAL WTR TRN ISOL, and indicate OPEN. MVT-8100, SEAL WTR RPN ISOL, SA T UNSA T CR SEQ STEP: 6 No No Maintain Seal Injection Flow. Wednesday, March 24, ZOUl STEP STANDARD: Adjusts HCV-186, INJ FLOW, as required to keep seal injection flow between 6 and 13 gpm. Page 6 of 8

CR SEQ STEP: 7 STEP STANDARD: Yes Yes Adjust PCV-145 controller to maintain RCS Adjusts PCV-145 controller output to pressure at 350-425 psig. maintain RCS pressure at 350-425 psig. CUES: COMMENTS: SA 1' UNSAT __ CR SEQ STEP: 8 STEP STAIVDARD: No No Monitor RCS pressure meters and/or Monitors N.R. and/or W.K. RCS recorders to observe trend in RCS pressure. pressure meters and recorders to determine RCS pressure stable at 350-425 psig. CUES COMMENTS: Examiner ends JPM at this point. Wednesday, March 24,2004 SAT UNSA T. Faze 7 of 8

JPM SETUP SHEET JPM NO: JPS-023 DESCRIPTION: OPERATE THE CVCS SYSTEM TO INCREASE RCS PRESSURE ICSfiT: 1 INSTRUCTIONS:

1. RUN
2. Close PCV-145. Establish
3. When RCS pressure 420 psig, reduce charging flow to,>75 gpm. Open PCV-145 to 40% demand.
4. FREEZE
5. When student is ready gpm flow on FI-122 by manually opening FCV-122.

RUN COM.WENTS: Wednesday, AfaFCh 24,2804 Page 8 of 8

V.C. SUMMER NUCLEAR STATION JQB PERPQRMANCE MEASURE JPM J PSF-025 START AND LOAD "B" EMERGENCY DIESEL GENERATOR APPROVAL: APPROVAL DATE: REVR'O: 4 CANDIDATE Wednesday, March IO, W04 Page I of13

TASK: 064-003-01 -01 LOAD THE DIESEL GENERATOR NO:: "B" Diesel Generator is started and loaded to 4150-4250 KW, and then tripped and the engine shutdown when oscillations occur. The use of applicable Human Performance Tools (3-way communications, self checking, peer checking, phonetic alphabet, etc) and industrial safety practices meets expectations. PREFERRED EK4ILlATIO.V LOCATION PREFERRED EVALLiATlON METHOD SIMULATOR PERFORM

REFERENCES:

SSCB-IV-7 DIESEL GENERATOR POWER FACTOR, CURRENT VS. LOAD SOP-306 EMERGENCY DIESEL GENERATOR TOOLS: EVALUATZOhT TIME 15 TIME CRITICAL No IOCFRSS: 45(aj8 CANDIDAlE: TIME START T M E FEWB: PERFORMANCE RATZhGs SAT I!XSAl' QLIESTION GRADB: PERFORMANCE EXAMIh'ER: COMMENTS: Wednesda~, March 10,2004 SIGNATURE DATE Page 2 of 13

TASK STANDARD: INSTRUCTIONS TO OPERATOR READ TO OPERATOR: WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB PERFORMANCE MEASURE WILL BE SATISFIED. SAFETY CONSIDERA TIONS: INITIAL CONDITION: The plant is operating at 100% power with normal AC power available to all buses. "B" D/G is to be started and loaded for monitoring cylinder temperatures. A11 local steps have been completed.

ZNITIATING CUES: CRS directs starting and loading of "W D/G to 41 50-4250 KW per SOP-306, Section IV.B, steps 2.3 thru 2.10. HAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIMEf Wednesday, March 10,2001 Page 3 of 13

JPM BRIEFING SHEET OPERA TOR I,V.STRLIC!TZONS: SAFETY COXSZDEZU TZONS: INZliAL CONDITION: The plant is operating at 100% power with normal AC power available to all buses. "W DIG is to be started and loaded for monitoring cylinder temperatures. All local steps have been completed. ZNZTZATZA'G CUtiS: CRS directs starting and loading of "B" DIG to 41 50-42250 Kw per SOP-306, Section IVB, steps 2.3 thru 2.10. Page 4 of 13

STEPS CR SEQ STEP: 1 STEP STAXDARB: No No Verify Annuoicia!or XCP-637 1-2, DS B Verities Annunciator XCP.637 1-2, DG B AGTOS'I'AITT NOT READV, is clear. AUTOSTART NOT HEADY, is clear. CUES: CQMMENTS: SAT UA'SA T CR SEQ STEP: 2 STEP STANDARD: No No The READY FOR AUTO START light is Calls the 18 operator and verifies the "READY FOR AUTO START" light is lit at me "B" D/G Local Control Panel. illuminated at the D/G Local Control Panel CUES: SAT When requested, as the IB operator, inform the operator that the "READY FOR UNSAT AUTO START" light is lit at the "B" D/G Local Control Panel. COMMENTS: ,- CR SEQ STEP: 3 STEP STANDARD: No Yes Verify D/G starts and accelerates to 58.9 - 61.1 Hertz and 6700-7600 volts. DG B VOLTS indicates 6700-7600 volts and FREQUENCY indicates 58.9 - 61.1 Hertz. CUES: COhfMEATS: Wednesday, March 10, 2004 SAT UNS.4 T Pa@ 5 of 13

CR SEQ STEP: 4 STEP SZANDARD: No Yes Place "E" Diesel Generator TEST switch to Momentarily rotates "B" Diesel Generator TEST switch to the START position. START. CUES: COMMENTS: SAT UNSA T CR SEQ STEP: 5 SZEP STANDARD: No Yes Place the DG B SYNC SEL switch in BSL. DG B SYNC SEL switch indicates DSL. CUES: SAT CRS directs BOP to load "6" DG per Section I l l Precaution 24. When examinee UNSAT mentions that he is waiting 3-5 minutes for pressures and temperatures to stabilize inform examinee that he may continue without waiting the 3-5 minutes referenced by the procedure. COMMENTS: CR SEQ STEP: 6 No No Ensure VOLT REG switch is in AUTO. CUES: COMMENTS: Wednesday, Murrh 10,2004 STEP STANDARD: VOLT REG switch for the '5 DIG indicates AUTO. SAT UXSA T Page 6 of 13

CR SEQ STEP: 7 STEP STANDARD: No No Monitor voltage on 1 DB SYNC VOLTS and Locates 1 DB SYNC VOLTS and SYNC SYNC VOLTS. VOLTS meters and monitors voltage. CUES: COMMENTS: SAT UXSAT CR SEQ STEP: 8 STEP STANDARD: Ye No Adjust SYNC VOLTS to slightly higher than VOLT REG RAISE LOWER switch used to adjust DG 'B' SYNC VOLTS slightly higher 1 DB SYNC VOLTS using VOLT REG RAISE LOWER. than 1DB SYNC VOLTS. CtiES: SAT UNSAT COMMENTS: CR SEQ STEP: 9 STEP STAhlDARD: Ye No Adjust Diesel Generator "8" frequency to DG 'B SPEED switch used to adjust D/G speed so that SYNCHROSCOPE rotates slowly in the FAST direction. ~ cause synchroscope to rotate slowly in the FAST direction using SPEED switch. CUES: COMMENTS: Wednesday, March IO, 2004 SAT UNSA T Page 7 af 13

CR SEQ STEP: 10 STEP STARWARD: Ye Yes When synchroscope is in proper position, close BUS 1 DE BG FEED breaker. When synchroscope is between 11 o'clock and 12 o'clock, closes BUS 1 DB DG FEED breaker. CUES: COMMENTS: CR SEQ STEP: 11 SZEP STANDARD: No Yes Verify breaker 1 DB DG FEED breaker closed. Bus 1 DE3 DG FEED breaker indicates red light ON, green light OFF. CUES: SAT UNSAT COMMENTS: CR SEQ STEP: 12 STEP STANDARD: D E 'B' KILOWATTS indicates 850-1250 KW for 3-5 minutes. DG B VOLTS indicates 6840-7344 volts and DG AMPS indicates +IO0 amps. No Yes Adjust load to 850-1250 KW using SPEED switch and maintain for 3-5 minutes CUES: SAT When examinee mentions that he is waiting 3-5 minutes for pressures and UNSAT temperatures to stabilize inform examinee that he may continue without waiting the 3-5 minutes referenced by the procedure. COMMENTS: Wednesday, March 10, 2004 ~ Page 8 of 13

CR SEQ STEP: 13 STEP STANDARD: DIG 'B KILOWATTS indicates 2150-2550 KW for 3-5 minutes. DG 6 VOLTS indicates 6840-7344 volts and BG AMPS indicates i 100 amps. D/G 'B indicates 2150 - 2550 KW for 3-5 minutes. No Yes Adjust load to 2150-2550 KW using SPEED switch and maintain for 4-5 minutes. CL'ES: SAT temperatures to stabilize, inform examinee that he may continue without waiting the 3-5 minutes referenced in the procedure. COMMEVTS: When examinee mentions that he is waiting 3-5 minutes for pressures and C'NSA T CK SEQ STEP: 14 Ye Yes Adjust load to between 4150 and 4250 KW using S P E D switch. CUES: COMMEM'S: CR SEQ STEP: 15 No Yes Place DIG '8' SYNC SEL switch in OFF. CUES: COMMENTS: Wednesday, March 10,2004 - -4 STEP STANDARD: B1G '3' KILOWATTS indicates 4150-4250 Kw 6800-7400 VOLTS. SAT UA'SAT STEP STANDARD: BG I3 SYNC SEL switch indicates OFF. SAT UR'SA T Page 9 of 13

CR SEQ STEP: 16 STEP STANDARD: Ye No Annunciator XCP 637, 6-3 DG B ENG TEMP Operator reviews ARP for XCP 637, 6-3 investigate. -id TRBL is received. and dispatches the BG operator to CUES: SAT DG operator reports receipt of XCP 5202,l-2 HIGH LUBE OIL TEMPERATURE and reports that LUBE OIL TEMP TO ENGINE on the "B" DG gaugeboard reads 170 degrees F and increasing. If the operator requests permission to begin decreasing load on "B" DG, prompt him to begin a normal load reduction using SOP 305, step 2.6.b using narmal time limits. CO.Wn.IEI\\T~SS: UNSAT CR SEQ STEP: 17 STEP STANDARD: Ye No Annuciator XCP 637,2-5 DG B ENG TRBL Refers to ARP for XCP 637,2-5 and notes that the diesel should have shutdown. ARP further directs that the operator ensure "8" DG is shutdown. SHUTBN is received. CUES: SAT DG Operator reports receipt of XCP 5202,6-3 ENGINE TROUBLE SHUTDOWN, but the diesel engine continues to run at full load and LUBE OIL TEMP TO ENGINE on the "W DG gaugeboard now reads 176 degrees F and still increasing. If the operator requests permission to trip the "3" DG under full load, CRS directs that load be rapidly reduced using SOP 306, step 2.6.b as a guide only. If the operator trips "6" DG under full load due to a trip condition being exceeded without receiving a trip, proceed to step 21 of this JPM and continue. UNSA T v COMMENTS: Wednesday, March 10,2004 Page 10 of 13

CR SEQ STEP: 18 STEP STANDARD: No No Unload Diesel Generator B by holding the SPEED Switch in LOWER until load is 50 KW. BG B KILOWATTS indicates less than 100 KW. .__./ CUES: SAT If the operator requests guidance from the CRS as to whether or not to trip "B" BG UNSAT or unload, the CRS will direct that the "B" DG be unloaded rapidly using SOP 306, step 2.6.b as a guide only. if the operator decides to open the DG output breaker under full load due to a trip condition being reached and exceeding without receiving a trip, proceed to step 21 of this JPM and continue. COMMENTS: CR SEQ STEP: 19 STEP STANDARD: No No Using the VOLT REG RAISE-LOWER Switch, reduce KILOVARS to minimum. DG B KILOVARS indicates approximately zero KVARS. CUES: C(1MAfENTS: CR SEQ STEP: 20 No No Open BUS 1 DB DG FEED Breaker. CUES: Wednesday,.Murch 10, 2004 --.a SAT UhSA 1 STEP STANDARD: BUS IDB DG FEED breaker green light is LIT. SAT UhSA T Page 11 of 13

CR SEQ STEP: 21 STEP STANDARD: No No Momentarily place the EXCITER Switch in DG E AMPS and VOLTS decrease to zero, SHUTDN. and FREQUENCY decreases to minimum. CUES: COMMENTS: SAT UNSAT CR SEQ STEP: 22 STEP STANDARD: No No Momentarily place the TEST Switch in STOP. TEST Switch is placed in the STOP position. CUES: DG "8" operator reports that the "B" DG engine is shutdown. COMMENTS: Examiner ends JPM at this point. Wednesday, March 10,2004 i-. SAT UNSAT Puge I 2 of 13

JPM SETUP SHEET JYiM,VO: JPSF-025 DESCRZPTIOA': START AND LOAD " 5 EMERGENCY DIESEL GENERATOR ZC SET: 10 (1 00% ZNSTRUCTZUNS:

1. When student is ready; RUN JPM Initial Condition of "Cylinder Monitoring" was intentionally used to prevent requiring STP-125.002 attachments from having to be available. Also to prevent having to have a stopwatch available. This is too much effort to test the same skills as in SOP-306.

COMMENTS: Wednesday, March IO, ZOO4 Page 13 of 13

V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE JPM NO: JPS-033 MITIGATE THE CONSEQUENCE8 OF A TOTAL LOSS OF SERVICE WATER APPROVAI,: DclW APPROVAL DATE: 06/20/2002 REVNO: 2 CANDIDATE EXAMINER Wednesduy, March 24.2004 Page I of10

TASK: L.' 000-062-05-01 RESPOND TO LOSS OF NUCLEAR SERVICE WATER TASK STANDARD: Plant is stabilized pending evaluation. '6 and 'C RCPs have been tripped. B CCW Loop has been placed in service without loss of cooling to the running RCP. The use of applicable Human Performance Twls (3-way communications, self checking, peer checking, phonetic alphabet, etc) and industrial safety practices meets expectations. PREFERRED EVALkrATIOiV LOCATION PREFERRED EVALUATION METHOD SIMULATOR PERFORM

REFERENCES:

SOP-1 18 COMPONENT COOLING SYSTEM AOP-117.1 TOTAL LOSS OF SERVICE WATER TOOLS: EVALUATION TIME 10 TIME CRITICAL No CANDIDATE: __ ~ IOCFR55: 45(a)8 Wediiesday, March 24,2004 Page 2 of 10

INSTRUCTIONS TO OPERATOR jp READ TO 0PER.I TOR: INITIATING CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STAflTING, I WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SlhNLATE OR DISCUSS, AND PROVIDE INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB PERFORMANCE MEASURE WILL BE SAFETY CONSIDERA TIOM: ZNZTZAI, CONDZTZON: Mode 3 ready to startup. Both running SW pumps have tripped. The running WAC chiller units have tripped on high temperature. Attempts to restore at least one train of SW have failed. ZNITZATZNG CUES: The CRS has directed the NROATC to respond to a total loss of service water, per BOP-I 17.4 and complete steps 11-14. HAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME! Wednmdaj, Murch 242004

.IPM BRIEFING SHEET OPERATOR INSTRlJCTIONS: SAFETY CONSIDERA T1O.W: INITMI, CONDITION: Mode 3 ready to startup. Both running SW pumps have tripped. The running HVAC chiller units have tripped on high temperature. Attempts to restore at least one train of SW have failed. INITIATING CUES: The CRS has directed the NROATC to respond to a total loss of service water, per AOP-117.1 and complete steps 11-14 HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK. Wednesday, March 24,2004 Page 4 of 10

STEPS CR SEQ STEP: 1 STEP STANDARD: Yes Yes Minimize CCW heatup by stopping '0 and'C Secures '0 and ' C RCPs by taking control switch to trip position and verifying green fight lit. RCPs. CUES: SAT When asked examiner informs examinee that the CRS concurs with securing L,NsAT COMMENTS: two RCPs and directs securing 'B' and 'C RCPs per SOP-IO? section 4A. CR SEQ STEP: 2 No Yes Checks RCP A temrmatures CC'ES: I COMMENTS: STEP STANDARD: Displays ZZ RCP BRG on IPCS monitor to verify: RCP motor bearing temperature z 1950F, Lower seal water bearing temperature < 225oF. CR SEQ STEP: 3 STEP STANDARD: No Yes Minimize CCW heatup by alternating Perform an active CCW loop switchover operation of Component Cooling Water loops. per SOP-1 18, section 38 step 2.3. CUES: SAT Examiner states that the NROATC has been directed to perform an activ@ CCW LJ,%rs~~ I Q Q ~ switchover Per SOP-1 18, by CRS. COMMENTS: Wednesday, March 24,2004 Page 5 of 10

CR SEQ STEP: 4 STEP STANDARD: .i_.._ Yes Yes Place XPP-OQfJlC, PUMP C, TRAIN B, in The B Train Handswitch for C PULL TO LOCK. Component Cooling Water Pump is in Pull To Lock. CUES: SAT COMMENTS: CR SEQ STEP: 5 STEP STARDARD: No Yes Align XPP-0001C PUMP C, to Train B per Direct the AB Operator to complete Attachment VIB with the exception of racking up the breaker for C CCW Pump on B Train. Attachment VIB with the exception of racking in CCW pump C breaker. CUES: SAT in the procedure. Racking up the breaker for C CCW Pump at this time does not Racking up the breaker is a separate direction from the NROATC in a later step constitute 2 failure of this JPM. avsAT ~~ ~ ~ ~.___ COMMENTS: CR SEQ STEP: 6 STEP STANDARD: Yes Yes Verify CCW to the RHR HX B is open. The red light for MVB-95038, CC TO RHR HX B, is lit and the green light is off. CUES: Wednesday, March 24,2004 SAT UNSA 2 Page 6 of 10

CR SEQ STEP: 7 Yes Yes Start B CCW Pump. STEP STAA7DARD: Indicated by the red light for B CCW Pump lit and the green light off CR SEQ STEP: 8 STEP STANDARD: Yes Yes Start MVB-9503B in the closed direction. Start MVB-9503B CC TO RHR HX B, strocking in the closed directlon as indicated by both the red and green lights being lit. CUES: COMMENTS: CR SEQ STEP: 9 Yes Yes When flow is indicated on Fl-7044 between 5000 and 4000 gpm Open MVB-96878/95258 and MVB-9524B/9526B; and 9587N9525A; and Open MVB-9503A. Close MVE9524N9526A; MVB-STEP STAXDARD: Indicated by the red light on the handswitchs for MVB-9687B/9525B, MVB-9524BB526B being lit and the green light on the handswitches for MVB-9524N9526A and MVB-9687N9625A being lit, and the red light on the handswitchs for MVB9503A being lit. ~- CUES: SAT The valves listed in this step must be operated in rapid succession to prevent CTN,~AT loss of flow or excessive flow perturbations in the non-essential loop and should be operated by Train sequence as indicated. Auto closure of the CCW valves to the RB or Thermal Barrier constitutes a failure of this JPM. COLWMEIVTS: Wednesday, March 24,2004 Page7of10

CR Sh'Q STEP: 10 STEP STAXIIARD: No No Rack in the C CCW Pump breaker on Train B. Direct the A 0 to Rack in the breaker for B Train power to C CCW Pump per Attachment VIB. Indicated by the green light on the B Train switch for C CCW Pump being lit. CUES: COMMENTS: SAT UNSAT - CR SEQ STEP: 11 STEP STANDARD: No No Place XPP-0001C Switch in After-Stop. Place the handswitch for 6 CCW Pump in the Normal After-Stop position. CUES: SAT CNSA T ~ COMMENTS: CR SEQ STEP: 12 STEP STANDARD: No No Direct the AB Operator to verify flow for The AB Operator reports that flow is greater than 1 gpm. RML2B is greater than 1 gpm. CUES: COMMENTS: Wednesdaj, March 24,2004 s.4 T UNSA 1' Page 8 of IO

CR SEQ SlEP: 43 STEP STANDAKD: Yes Yes Ensure the following valves have not auto Ensure that MVG-9625, MVG-9626, closed due to high flow. MVG09583, and MVT-9593A (B) (C) are open as indicated by the red lights on the switches being lit and no alarms indicating closure are received. CUES: SAT Closure of these valves constit~tes a failure of this JPM. This concludes this ulvsA~ JPM. COMMEi\\lS: Examiner ends JPM at this point. Wednesday, March W? 2004 Page 9 of 1u

JPM SETUP SHEET JPM NO: JPS-033 DESCRIPTION: MITIGATE THE CONSEQUENCES OF A TOTAL LOSS OF SRVICE WATER IC SET: INSTRUCTIONS: COMMENTS: Wednesday,.Wararch 24,2004 Page 10 of 10

bl V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE JPM NO: JPS-052 PERFORM BORON GONCENTflATlON DILUTION OF THE RCS APPROVAL: TRH APPROVAL DATE: 06/16/2003 REVNO: 3 EXAMINER: THfS JPM bS APPROVED Wednesday, March 24,2004

.-----=-- TASK: 004-007-01 -01 PERFORM BORON CONCENTRATiONlDlbUTlON OF THE REACTOR COOLANT SYSTEM ThSK STANDARD: Bank 'D' Control Rods have been alternate diluted to 198 steps using the Alternate Dilution mode of the Reactor Makeup Water System. Tavg-Tref maintained within 15°F. PREFERRED EVALUATION LOCATION PREFERRED EVALUA TIOh' METHOD SIMULATOR PERFORM REFEREh'CES: SOP-lo6 REACTOR MAKEUP WATER SYSTEM TOOLS: EVALlJhTION TIME 10 TIME CRITICAL No lQCFR55: 45(A)1 TIME START TIME mISH CANDIDATE: Wednesday, March 24,2004 Page 2 of I1

INSTRUCTIONS TO OPERATOR REhD TO OPERATOR: INITIATING CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB PERFORMANCE MEASUBE WILL BE SATISFIED. SAFETY COXSIDERA TION$: INITIAL COA9DITION: The reactor is operating at 75% power, all controls in automatjc. Turbine load has been held at 75% for 2 weeks due to NIS problems Reactor engineering has requested that Bank "D" control rods be positioned to 198 steps by Alternate Dilution (10,000 MWD/MTU). INITIATING CUES: CRS directs NROATC to alternate dilute Bank D Control Rod to 198 steps. HAND JPM IIRPEFING SHEET TO OPERATQR AT THIS TME! Wednesday, March 24,2004 ~ Page 3 of I1

.IPM BRIEFING SHEET OPERA TOR INSTRUCTIONS: SAFETY CONSIUERA TIONS: INII'IAL CONDITION: The reactor is operating at 75% power, all controis in automatic. Turbine load has been held at 75% for 2 weeks due to NIS problems Reactor engineering has requested that Bank "8" control roods be positioned to 198 steps by Alternate Dilution (10,000 MWD/MTU). INITIATING CUES: CRS directs NROATC to alternate dilute Bank 5 Control Rod to 198 steps. ASSIGNED TASK. Wedne,yday, March 24,2004 Page 4 of I1

STEPS CR SEI,) STEP: 1 SiEP STANDARL): No Yes Operator calculates expected amount of Calculation result is 415 - 453 gallons dilution. CUES: COMMENTS: ~- SAT UNSA T CR SEI,) STEP: 2 STEP STANDARD: No Yes Place RX COOLING SYS MU switch to RX COOL SYS MU SELECT switch in STOP. the STOP position. CUES: SAT - This is a Reference Use Procedure. The operator should verify actions with U N ~ ~ ~ procedure. .~ COMMENTS: CM SEI,) STEP: 3 STEP STANDARD: Yes Yes Place RX COOLING SYS MU mode select RX COOL SYS MU MODE SELECT switch to ALT DlL position. switch in the ALT DIL position. CUES: COMMERTTS: Wednesday, March 24,2004 S.4 T ___ UNSA T Page 5 of I1

CR SEQ STEP: 4 STEP STANDARD: No Yes Adjust FCV-168, TOTAL MU FLOW Adjust FCV-I 68 controller to desired controller to desired flowrate. flowrate CUES: Optional: Controller normally set for 120 gpm flow rate. COMMENTS: SAT -~ UNSA T CR SEQ STEP: 5 STEP STANDARD: Yes Yes Set FIS-I68 TOTAL MU FLOW batch Set FIS-168 batch integration to 200 integrator to desired volume. gallons. CUES: Cue the operator to set to 200 gallons. COMMENTS: CR SEQ STEP: 6 Yes Yes Start dilution. Wednesday, March 24,2004 SAT UNSAT STEP STANDARD: RX COOL SYS MU switch indicates red light on, green light off. Page6oflI

CR SEQ STEP: 7 STEP STANDARD: No Yes Verify RX MU WTR PP start. RX MU WTR PP running by MC5 indication. CUES: COMMENTS: CR SEQ STEP: 8 STEP STANDARD: No Yes Verify FCV-I68A, MU TO VCT opens. FCV-168A indicates red light on, green light off. CUES: COMMENTS: SAT UNSAT CR SLCQ STEP: 9 STEP STANDARD: No Yes Verify FCV-4685, MU WTR TO BLENDER FCV-1685 indicates red light on, green light off. FCV-1138 indicates red light opens and FCV-1133, MU TO CHG PP, opens. an, green light off. CUES: COMMEATS: Wednesdqv, March 24,2004 SAT [JiVSA I Page 7uf I I

CR SEQ STEP: 10 SIEP STANDARD: -_. No Yes Verify desired fiowrate on FR-113, TOTAL 120 gpm indicated on FR-113 recorder. MU GPM (F-168). CIJES: COMMENTS: CR SEQ STEP: 11 Yes Yes Energize PZR BU Heaters. CIJES: Step 10 is optional. SAT UNSAT STEP STANDARD: PZR HTRS BU GP 1 (2) indicate red light on, green light off. SAT UNSAT COMMENTS: CR SEQ STEP: 12 STEP STANDARD: No Yes Verify letdown diverts to Holdup Tanks. LCV-l15A, LTDN DIVERT TO HU-TK, indicates HU-TK positin when VCT level - 70%. CUES: COMMENTS: Wednesda.y, March 24, 2004 Page 8 of I1

CR SEQ STEP: 13 Yes Yes Verifies dilution (alternate dilution) stops when preset volume is reached on FIS-168, TOTAL MU FLOW batch integrator. STEP STANDARD: Verfies dilution has stopped by observing FIS-268, total MU flow batch integrator counter stopped at set gallons. CUES: CR SEQ STEP: 14 No Yes Verify rods controlling Tavg-Tref. CUES: SA 1' WNSA T STEP STAh'DARD: Verifies rods controlling Tavg-Tref within 1.5"F in Auto or Manual. SAT ~ Examinee should be verifying Tavg-Tref controlled by rods during dilution. UNSAT COMMEA'TS: CR SEQ STEP: 15 STEP STAXDARL): No Yes Place RX COOL SYS MU switch to STOP. RX COOL SYS MU indicates red light off. green light on. CWES: SAT Cue the operator that 425 gallons have been added and Bank B control rods are [INSAT at 198 steps. COMMENTS: Wednesday, March 24,2004 ~ Page 9 of11

CR SEQ STtiP: 16 STEP STANDARD: No Yes Place RX COOL SYS MU MODE SELECT RX COOL SYS MU MODE SELECT switch to AUTO. switch in the AUTO position. CUES: COMMEA'TS: SAT UNSA T ~ CU SEQ STEP: 17 STEP STAlvDARD: No Yes Place RX COOL SYS MU switch to START. RX COOL SYS MU indicates red light on, green light off. CUES: COMMENTS: Examiner ends JPM at this point. Wednesday, h4arch 24,2004 SAT UNSAT Page 10 of I1

JPM SETUP SHEET JPiM NO: JPS-052 DE,TCRIPTION: PERFORM BORON CONCENTRATION DILUTION OF THE RCS ICSET: 11 INSTRUC~~OLVS'S:

1. When student is ready:

RUN COMMENTS: Wednesda.y, March 24,2004 Page 11 of 11

V.C SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE JPM NO: JPSF-007 STEAM GENERATOR TUBE RUPTURE (DEPRESSURIZE RCS TO e RUPTURED SI6 PRESSURE) APPROVAL: TRH APPROVAL DATE: 05/29/2003 REVNO: 7 Wednesday, March 24,2004 Page i of 7

TASK: 000-038-05-01 TASK STAR'DARD: RESPOND TO STEAM GENERATOR TUBE RUPTURE RCS pressure is reduced to less than ruptured W G pressure with PZR level > 18% or PZR b V d > 68% or RCS subcooling e 30°F. The use of applicable Human Performance Tools (3-way communications, self checking, peer checking, phonetic alphabet, etc) and industrial safety practices meets expectations. PREFERRED EVALUATION LOCATiON PREFERRED EVALUATION h4ETHOD SIMULATOR

REFERENCES:

EOP-4.0 TOOLS: E17ALUATION TIME 10 CANDIDATE: PERFORMANCE RATING: SAT PERFORM STEAM GENERATOR TUBE RUPTURE TlME CRITICAL No IOCFRSS: 45(a)6 LINSAT Wedi8esda.v. March 24, 2004 Page 2 of 7

INSTRUCTIONS TO OPERATOR READ TO OPERATOR: WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING. I WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB PERFQRMANCE MEASURE WILL BE SATISFIED. SAFETY CONSIDERATIONS: INITIAL CONDITION: A Steam Generator Tube Rupture is in progress. S/G "c" has been isolated per EOP-4.0. An operator initiated cooldown has been performed according to EQQ-4.0, through step 24. INITIATING CUES: Control Room Supervisor directs operator to depressurize the RCS using PZR Spray, per EQP-4.0, Step 22. HAND JP.W BRfEFING SHEET TO OPERATOR.AT THIS TIME! Wednesday, March 24,2004 Page 3 of 7

.IPM BRIEFING SHEET OPERA TOR INSTRUCTZUXS: SAFETY CUNSZDERA TZUNS: ZNITZAZ. CULVDZTZUN: A Steam Generator Tube Rupture is in progress. S/G "C' has been isolated per EOP-4.0. An operator initiated cooldown has been performed according to EOP-4.0, through step 21. INZTZATZNG CUES: Control Room Supervisor directs operator to depressurize the RCS using PZR Spray, per EOP-4.0, Step 22. HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK. Wednesday, Marcti 24,2004 Page 4 of 7

STEPS CR SEQ STEP: 1 STEP STANDARD: Yes Yes Depressurize the RC§ using normal spray Places PZR Spray PVC-444C & 444D controllers in MANUAL and increases output to 100% demand. valves PCV-444C and 444D. CUES: SAT UNSAT Give examinee 1-2 minutes to familiarize himself with his control hoard indications and his place in the procedure. COMMENTS: CR SEQ STEP: 2 STEP STANDARD: No Yes Use ma.ximum available spray until any Recognizes from MCB indication that RCS pressure is less than 'c' SIG pressure with PZR level 218% or PZR level >68%. termination criteria is met; RCS pressure c'c' (ruptured) §/G pressure and PZR level > 18%; or PZR level >68; or RCS subcooling <30"F. CUES: COMMENTS: CR SEQ STEP: 3 Yes Yes Stop RCS depressurization. SAT UNSAT STEP STANDARD: Decreases PCV-444C & 444D controller output demand to zero. CUES: SAT If RCS pressure equals ruptured S/G pressure first and student continues to UNSAT depressurize to 68% PZR level, this would constitute failure. COMMENTS: ~ Wedileday, March 24,2004 Page 5 of 7

CR SEQ STEP: 4 smr STAXLMRD: Yes Yes Identify failure of PCV-444B to close and 'A RCP tripped to stop depressurization. secures 'A RCP. CUES: SAT COM.MENTS: Examiner ends JPM at this point. Wednesday, March 24,2004 Page 6 of 7

JPM SETUP SWEET \\-- - JPh4NO: JPSF-007 DESCRIPTION: STEAM GENERATOR TUBE RUPTURE (DEPRESSURIZE RCS TO e RUPTURED SIG PRESSURE) ICSET: 10 INSTRUCTlOiVS:

1. Activate MAL-WCS002C SEVERITY=450 RAMP=30 (SIG Tube Rupture on 'C' S/G)
2. RUN 180 seconds
3. RUN
4. Manual SI and perform actions of EOQ-I.O & EOP-4.0 up through step 39
5. Throttle EFW to 'C' S/G when level > 30%.
6. FREEZE
7. Activate LOA-MSS033 SELECT-RACK OUT (RACK OUT BKR FOR MVG-2802B (STM SUPPLY TO

...-~.' ' TDEFP))

8. RUN
9. Perform actions of steps 3h-20 of EOP-4.0.
10. FREEZE I
i. Place BIU heaters in P-T-L.
12. When Student is ready:

RUN

13. After spray valve is started manually closed by student when depressurization termination criteria met, Activate:

MAL-PRS003B SEVERITY=IOO RAMPzO (PCV-444D STUCK OPEN) COMMENTS: This JPM can be run from the same snap as JPSOO7 with the addition of MAL-PRSQ03B = 100% Wednesday, March 24,2004 Page 7 of 7

V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE JPM NO: JPS-008 LOSS OF POWER RANGE INSTRUMENT N-44 APPROVAL: TRH APPROVAL DATE: 06/09/2003 REVNO: 5 W'edneyday, March 24,2004 Page 1 of 10

TASK: \\-_ 030-034-05-01 RESPOND TO POWER RANGE INSTRUMENTATION CHANNEL FAILURE TASK STANIMRD: N-44 has been removed from service (control power fuses removed) Control rod motion has been stopped (Bank selector switch placed in MAN). PREFERRED EVALLMTION IBChTlOh' PREFERRED EVALUATION METHOD SIMULATOR PERFORM REFEREIVCES: AOP-401.IO POWER RANGE FAILURE TOOIS: EVALUATIOLV TIME 15 TIME CRITICAL No IOCFR55: 45(a)4 TIME START: Tlhm FWISW: ~ CA NDZDA TE: -. ~ ~ ~. ~ IIEjSAT PERFORMANCE RATING: SAT PEKklRMANCE TIME: ~~ QUESTTON GRADE: ~~~~ ~ ~ ~ ~ ~~~ ~ ~ ~ . L - EXAMIAWR: COMMENTS: SIGNATIJRE DATE Wednesday, March 24,2004 Page 2 of I 0

INSTRUCTIOAS TO OPERATOR READ TO OPERATOR: WHEN I TELL YOU TO BEGIN, YOU ARE TQ PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED AND PROVIDE THE NECESSARY POOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB PERFORMANCE MEASURE WILL BE SATISFIED. SAFETY CONSIDEM TZONS: INITIAL CONDITION: The reactor is at 75% power. All controls are in automatic. INZTZATZNG CUES: Respond to developing plant conditions. H A W JPM BRlEFING SHEET TO OPERATOR AT THIS TIME! Wednesday, March 24,2004 Page 3 of IO

JPM BRIEFING SHEET OPERATOR INSTRUCTIONS: SAFETY CONSIDERATIONS: ZNZTIAL CONDITION: The reactor is at 75% power. All controls are in automatic. ZNZTZATZNG CUES: Respond to developing plant conditions. HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK. Wednesday, iVarck 24,2004 Page 4 of 10

STEPS CR SEQ STEP: 7 STEP STANDARB: No Yes Identify power range channel N-44 has Operator identifies N-44 has failed low failed. by MCE indication. CUES: SAT ~. UNSAT COMMENT'S: CR SEQ STEP: 2 Yes Yes Manually control rods. CUES: Steps 2 and 3 are immediate Operator Actions. COMMENTS: CR SEQ STEP: 3 No No Stop any transients in progress. CUES: COMMENTS: Wednesduy, March 24,2004 STEP STANDARD: Positions the ROD CNTRL BANK SEL switch to the MAN position. -~ SAT UNSAT STEP STANDARD: Verifies no load change is in progress. SAT UNSAT Puge 5 of 10

CR SEQ STEP: 4 No No Maintain stable plant conditions. CUES: Note: This is a continuous action step. COMMENTS: CR SEQ STEP: 5 No No Verify no testing is in progress. CUES: Cue operator that no testing is in progress. COMMENTS: STEP STANDARD: Pzr pressure and Tavg maintained stable. SAT UNSAT STEP STANDARD: Looks at NI panel and/or asks examiner if any testing is in progress. SAT UNSA T ~ CR SEQ STEP: 6 STEP STANDARD: Yes No Set the rod stop bypass switch for the failed channel to bypass and verifies bistable light lit. Positions the ROD STOP BYPASS switch to the BYPASS Pi3 N-44 position and verifies XCP 61 11 light 4-4 lit. CUES: COMMEXTS: Wednesday, March 24.2004 SAT UNSAT Page 6 of I0

CR SEQ STEP: 7 STEP STANDARD: .-_ Yes No Maintain Tavg within I T of Tref. Controls Tavg within 1°F of Tref with manual rods. CUES: COMMENTS: SAT UNSA T CR SEQ STEP: 8 STEP STANDARD: Yes No Remove control power fuses from the N-44 Control power fuses fer the N-44 power range "A" drawer removed. power range "A" drawer. CUES: SAT Instruct NROATC that the CRS has requested him to remove N-44 from service. U N ~ ~ ~ COMMENTS: CR SEQ STEP: 9 STEP STANDARD: Yes No Remove instrument power fuses from the N-Instrument power fuses from the power 44 power range "B" drawer. range N-44 power range "B" drawer removed. Wednesday, March 24,2004 SAT C'h'SA T Pagf7oflO

CR SEQ STEP: 10 STEP STANDARD: No No §et the comparator defeat switch on the Positions the comparator channel defeat comparator and rate drawer to position associated with failed channel. switch to the N44 position. CUES: SAT UNSAI COMMENTS: CR SEQ STEP: 11 STEP STANDARD: No No §et upper section and lower section Upper and lower section switches on the detector current comparator indicate Pi3 N44 position. switches on the detector current comparator to position associated with the failed channel. CUES: COMMENTS: CR SEQ STEP: 12 No No Ensure NR-45 is selected to operable channels. CUES: COMMENIS: Wedaesda.v, March 24,2004 SAT UNSA T STEP STANDARD: Selects pen 2 (delta I) to N42 (Delta Flux 11). SAT GNSA T __ Page 8 of 10

CR SEQ SlEP: 13 STEP STAh7DAlW: No No Verify the status lights indicate the bistables Operator verifies that bistable lights fer trip. Channel IV, PR RATE HI, P!? LO and HI setpoints have energized to bright. CUES: SAT UNSAT COMMENTS: Examiner ends JPM at this point. Wednesdaj, March 24, 2004 Page 9 of I0

JPM SETUP SHEET JPM NO: JPS-008 DESCRIPTION: LOSS OF POWER RANGE INSTRUMENT N-44 ICSET: 11 INSTRUCTIONS:

1. RUN
2. When student is ready Activate MAL-NIS003B §EVE...TY = 0 RAMP = 5 (N-44 Failure)

COMMENTS: Rods will eventually (3 min.) restore Tavg to Tref (power rate mismatch signals die off, rods control on Tavgnref). Leaving rods in AUTO still constitutes failure, as further transients on the failed channel (e.g. trouble shooting) would produce more uncontrolled rod motion. Wednesday, March 24,2004 Page 10 of 10

V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE JPM NO: JPS-056 CONTROL ROOM EVACUATION (DUTIES OF NROATC) APPROVAL: TRH APPROVAL DATE: 06/16/2003 REVNO: 5 Wednesday, March 24,2004 L. Page 1 of 10

TASK: 000-068-05-01 PERFORM CONTROL ROOM EVACUATiON TASK STANDARD: Reactor is tripped, Turbine is tripped, WCPs "EY and " C are tripped, PCV-444C (spray vlv) is closed PREFERREQ EVALL'A TION LOCATION PREFERRED EVALUATION METHOQ SiMUMTOR PERFORM

REFERENCES:

AOP-600.1 CONTROL ROOM EVACUATION TOOLS: AOP-600.1 EVALUATION TIME 10 TIME CRITICAL No IOCFRSS: 45(a)12 PERFORMANCE RATING: SAT UNSAT ~ PBRFORMANCE TIME: ~~~~~~ ~ QUESTION GRAIIZ: i ~ ~1~ EXAMINER: SIGNATURE DATE COMMENTS: Wednesday, March 24,2004 Page 2 of 10

INSTRUCTIONS TO OPERATOR READ TO OPERATOR: WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED AN5 PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AN5 PROVIDE INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OWlECTlVE FOR THIS JOB PERFORMANCE MEASURE WILL BE SATISFIED. I I SAFETY CONSIDEMTZONS: Z,VZTZAL CON1)ZTION: The plant is operating at 100% power, all controls in automatic. A bomb has been found in the Control Room. The Shift Supervisor has directed a Control Room evacuation. INITIATING CUES: The Shift Supervisor directs that the Control Room should be evacuated. The CRS directs the NROAPC to complete Attachment I of AOP-600.1, starting with step 2. HAND JPM BRIEFfNG SHEET TO OPERATOR AT THIS TIME! Wednesda.v, March 24,2004 Page 3 of 10

.IPM BRIEFING SHEET OPERA TOR ZNSTKUCTZONS: SAFETY CONSZDEZU TZONS: ZNZI'ZAL CONDZTZON; The plant is operating at 100% power, all controls in automatic. A bomb has been found in the Control Room. The Shift Supervisor has directed a Control Room evacuation. ZNZTZATZNG CUES: The Shift Supervisor directs that the Control Room should be evacuated. The CRS directs the NROATC to complete Attachment I of AOP-600.1, starting with step 2. HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY CONl PLETED THE ASSIGNED TASK. L Wednesday, March 24,2004 Page 4 of 10

STEPS CR SEQ STEP: 1 STEP STANDARD: Yes Yes Trip Reactor manually from the MCB. Position the reactor trip switch (CS-CROl or CS-CflOlA) to the TRIP position CUES: SAT UVSA T Cue operator time IS available to complete additional Control Room actions. COMMENTS: CR SEQ STEP: 2 STEP STANDARD: Yes No Verify all reactor trip breakers open. TRIP BKR A & B indicate red light OFF, green light ON. CUES: SAT UNSAT ~ COMhfENTS: CR SEQ STEP: 3 Yes No Verify all rod bottom lights lit. CUEIS: COMMENTS: Wednesday, March 2 4 2004 STEP STANDARD: All roc! bottom lights are lit by DRPl indication. Page 50flO

CR SEQ STEP: 4 STEP STANDARD: Yes No Verify reactor power level decreasing. Reactor power level decreasing on N35 and N36 indication. CUES: SAT ~ G'NSAT COMMENTS: CR SEQ STEP: 5 Yes Yes Trip the main turbine from MCB. ClJES: COMMENTS: CR SEQ STEP: 6 Yes No Verifies turbine stop valves closed. CUES: COMMENTS: Wednesday, Murch 24,2004 STEP STANDARD: Momentarily depresses EMERG TRIP push button. SAT UNSAT STEP STANDARD: STM STOP VLVs indicate closed by lit indication on XCP-6114 status lights. Pugs 6 of 10

CR SEQ STEP: 7 STEP STANDARD: Yes No Ensures GEN BKR open (after 30 second GEN BKR indicates red light OFF, green time delay). light ON. CUES: COMMENTS: CR SEQ STEP; 8 STEP STANDARD: Yes No Ensures generator field breaker is open. GEN FIELD BKR indicates red light OFF, green light ON. CUES: COMMENTS: CR SEQ STEP: 9 Yes Ne Trips Exciter Field Control breaker. CUES: COMMEA!TS: Wednesday, March 2 4 2004 SAT UNSA T STEP STANDARD: EXC FIELD CNTRL indicates red light OFF, green light ON. SAT UNSAT Page7ofll)

CR SEQ STEP: 10 Y@s NQ Stop WCP'B'. CC'ES: COMMENTS: CR SEQ STEP: 4 1 No No Verify RCP ' A is running. CUES: COMMENTS: STEP STANDARD: Stop XPP-00308, RCP 8, indicates red light OFF, green light ON. SAT UNSAT __ STEP STANDARD: XPP-O030A, RCP A, indicates red light ON, green light OFF, normal running amps. SAT __ UNSA T CR SEQ STEP: 12 STEP STANDARD: Yes NQ Close pressurizer spray valve, PCV-444C. Manually closed PCV-444C, PZR SPRAY, and indicates red light OFF, green light QN. CUES: COMMENTS: Wednesdn), March 24,2004 SAT UNSAT Puge 8 of IO

CR.$E& STEP: 14 Yes No StopRCP'C'. Examiner ends JPM at this point. Wednesday, March 24,2004 STEP STANDARD: Stop XPF-O030C, WCP C, indicates red light OFF, green light ON. SAT UNSAT Page 9 of 10

JFM SETUP SHEET JPM NO: JPS-056 DE,YCRIPTION: L CONTROL ROOM EVACUATION (DUTIES OF NRQATC) iesm IO INSTRUCTIQLVS: 7. When student is ready: RUN COMMENTS: Wednesday, March 23,2004 Page IO of10}}