E-mail Dated 04/27/04 Re ANO 1 Status of Alloy 600/RV Head Inspection
ML041410130
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 04/27/2004
From: Sharon Bennett
Entergy Operations
To: Alexion T, David Bice, Burford F, Compton L, Daiber B, Davant G, Rick Deese, Eaton W, Edgell D, Ehren T, Eubanks C, Forbes J, Forrest F, Gobell J, Gordon R, Houghtaling J, James D, James W, Kowalewski J, Robert Lewis, Means B, Mitchell T, Panther K, Parks G, Payne G, Sims W, James Smith, Swain R
Entergy Operations, NRC/NRR/DLPM/LPD4
Alexion T W, NRR/DLPM, 415-1326
References
Download: ML041410130 (5)


Text

[Thomas A!exion - Status of Alloy 600/RV Head Inspection _ -Page1 From: "BENNETT, STEVE A" <SBENNE2@entergy.com>

To: Tom Alexion dtwa~nrc.gov>, mJeff Clark (ac~nrc.gov)" <jac~nrc.gov>, "SWAIN, RONALD VANCE' <RSWAIN1 @entergy.com>, "BICE, DAVID B" <DBICE@entergy.com>, "BURFORD, FRANCIS G" <FBURFOR~entergy.com>, "CAMPBELL, BILL - NUCLEAR" <WCAMPB3@entergy.com>,

"COMPTON, LESLIE" <LCOMPTO@entergy.com>, "DAIBER, BRYAN J" <BDAIBER©entergy.com>,

"DAVANT, GUY H <GDAVANT@ entergy.com>, "DEESE, RICHARD W <rdees9O@entergy.com>,

"EATON, WILLIAM A" <WEATON~entergy.com>, "EDGELL, DOUGLAS W"

<DEDGELL@entergy.com>, "EHREN, TERRY G" <TEHREN @entergy.com>, "EUBANKS, CLIFFORD"

<CEUBANKentergy.com>, "FORBES, JEFFREY" <JFORBE1 @entergy.com>, "FORREST, FREDDIE"

<FFORRES~entergy.com>, "GOBELL, JAMIE N" <JGOBELL~entergy.com>, GORDON, ROBERT A"

<RGORDON entergy.com>, "HOUGHTALING, JOHN B" <JHOUGHT~ entergy.com>, "JAMES, DALE E <DJAMES @entergy.com>, "JAMES, WILLIAM" <WJAMES1 @entergy.com>, "KOWALEWSKI, JOSEPH A" <JKOWALE@entergy.com>, "LEWIS, RAYMOND S" <RLEWIS1 @entergy.com>, "MEANS, BRACY E" <BMEANS~entergy.com>, "MITCHELL, TIMOTHY G" <TMITCH1 @entergy.com>,

"PANTHER, KENNETH C" <KPANTHE@entergy.com>, "PARKS, GLENN A" <GPARKS@entergy.com>,

"PAYNE, GARY - WF3" <GPAYNE@entergy.com>, "SIMS, WILLIAM D" <WSIMSientergy.com>,

"SMITH, JAMES Am <JSMITH@entergy.com>

Date: 4/27/04 8:16AM

Subject:

Status of Alloy 600/RV Head Inspection Attached is the Alloy 600/RV Head inspection status performed for 1R1 8 through April 27, 2004

.TM1ae~

I C\INDW\EPGiOOO CAW1ND0WS\TEMP\GW)00001.TMP Page1 I Mail Envelope Properties (408E4F15.865: 4: 39013)

Subject:

Status of Alloy 6001RV Head Inspection Creation Date: 4/27/04 8:11AM From: "BENNETT, STEVE A" <SBENNE2@entergy.com>

Created By: SBENNE2@entergy.com Recipients nrc.gov owf4_po.OWFN_DO TWA (Thomas Alexion) nrc.gov ARLPO.ARL_DO JAC (Jeffrey Clark) entergy.com JSMITH (SMITH, JAMES A)

WSIMS (SIMS, WILLIAM D)

GPAYNE (PAYNE, GARY - WF3)

GPARKS (PARKS, GLENN A)

KPANTHE (PANTHER, KENNETH C)

TMITCH1 (MITCHELL, TIMOTHY G)

BMEANS (MEANS, BRACY E)

RLEWIS1 (LEWIS, RAYMOND S)

JKOWALE (KOWALEWSKI, JOSEPH A)

WJAMES 1 (JAMES, WILLIAM)

DJAMES (JAMES, DALE E)

JHOUGHT (HOUGHTALING, JOHN B)

RGORDON (GORDON, ROBERT A)

JGOBELL (GOBELL, JAMIE N)

FFORRES (FORREST, FREDDIE)

JFORBE1 (FORBES, JEFFREY)

CEUBANK (EUBANKS, CLIFFORD)

TEHREN (EHREN, TERRY G)

DEDGELL (EDGELL, DOUGLAS W)

WEATON (EATON, WILLIAM A) rdees9O (DEESE, RICHARD W)

GDAVANT (DAVANT, GUY H)

BDAIBER (DAIBER, BRYAN J)

LCOMPTO (COMPTON, LESLIE)

WCAMPB3 (CAMPBELL, BILL - NUCLEAR)

FBURFOR (BURFORD, FRANCIS G)

DBICE (BICE, DAVID B)

I C:\W1ND0WS\TEMP\GW)00001.TMP Page 21 IC:\WINDOWS\TEMP\GWIOOOOi .TMP Page 2 RSWAINI (SWAIN, RONALD VANCE)

Post Office Route owf4_po.OWFN_DO nrc.gov ARLPO.ARL_.,DO nrc.gov entergy.com Files Size Date & Time MESSAGE 95 04/27/04 08:1l1AM Part.001 3220 1R18 RVH Inspection Results 4-27.doc 46080 Mime.822 69746 Options Expiration Date: None Priority: Standard Reply Requested: No Return Notification: None Concealed

Subject:

No Security: Standard

April 27, 2004 - 7:00 AM 1RI8 Alloy 600 Status Inspection Inspection Method Extent of Inspection IR18 Status/ Findings BMV of RV BMV exam inside Service 100% of the RPV head surface (including 3600 54 of 69 CRDM nozzles visually inspected 3600 Head Structure around each head penetration). (OP 2311.009)

  • CR-ANO-1-2004-885 documents that portions of 15 nozzles did not have video confirmation of 360° inspection
  • No leaking nozzles identified CRDM/ UT of 60 CRDM nozzles UT of the RPV nozzle from 2" above the highest UT scans of CRDM nozzles underway RADCAL (no known defects) point of the root of the J-weld to the blind zone.

Nozzles

  • 7 of 60 nozzles inspected
  • 6 of 7 analyzed No flaws identified UT of six FTI repaired UT the weld and at least 1-inch above the weld in CRDM nozzles (Nozzles the nozzle base material.

3,6,15,17, 33,&56)

UT/WS of two W repaired UT of the RPV nozzle from 2" above the highest CRDM nozzles (Nozzles point of the root of the J-weld to the blind zone 54 & 68) - and wetted surface exam of weld overlay.

UT of RADCAL Nozzle UT of the RPV nozzle from 2"above the highest (Nozzle 1) point of the root of the J-weld to the blind zone.

UT of nozzle Annulus Interrogate interference fit in all 69 nozzle annuli

[Leak Path Assessment] above J-weld for leakage path ICI Nozzles Visual Inspection of 52 Inspect 100% of the circumference of each BMIs initially inspected on night shift 4/22/04 BMI nozzles penetration as it enters the RPV lower head.

  • CR-ANO-1-2004-827 written due to placekeeping (OP 2311.009) concerns on nozzle inspections
  • No leaking nozzles identified to date

April 27, 2004 - 7:00 AM RCS Visually Inspect RCS for Visually inspect above the RPV head for potential No leaking A600 nozzles identified (ongoing)

Walkdowns RCS leaks boric acid leaks from pressure-retaining

  • 18 of 18 pressurizer/CFT nozzles inspected components as well as other A600 RCS small
  • 14 o14 hot leg nozzles inspected bore locations. (OP 2311.009)
  • 9 of 13 Cold Leg nozzles inspected