May 4, 2004 Mr. M. Nazar Senior Vice President Nuclear Generation Group American Electric Power Company 500 Circle Drive Buchanan, MI 49107
Dear Mr. Nazar:
We have received the enclosed Federal Emergency Management Agency (FEMA) letter (ADAMS Accession No. ML040970490), transmitting the FEMA final report dated October 21, 2003, for the July 22, 2004, radiological emergency preparedness plume pathway exercise at the D. C. Cook Nuclear Power Plant.
No deficiencies were identified during the exercise. However, four Areas Requiring Corrective Action (ARCAs) were identified.
We fully recognize that any corrective actions to be implemented may involve parties and political institutions which are not under your direct control. Nonetheless, we expect that assistance, if appropriate, will be extended.
In accordance with 10 CFR Part 2.390 of the NRC's Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Kenneth R. Riemer, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74
Enclosure:
As stated See Attached Distribution
M. Nazar cc w/o encl:
J. Jensen, Site Vice President M. Finissi, Plant Manager R. Whale, Michigan Public Service Commission Michigan Department of Environmental Quality Emergency Management Division MI Department of State Police D. Lochbaum, Union of Concerned Scientists W, King, FEMA Region V
ML040970490), transmitting the FEMA final report dated October 21, 2003, for the July 22, 2004, radiological emergency preparedness plume pathway exercise at the D. C. Cook Nuclear Power Plant.
No deficiencies were identified during the exercise. However, four Areas Requiring Corrective Action (ARCAs) were identified.
We fully recognize that any corrective actions to be implemented may involve parties and political institutions which are not under your direct control. Nonetheless, we expect that assistance, if appropriate, will be extended.
In accordance with 10 CFR Part 2.390 of the NRC's Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Kenneth R. Riemer, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74
Enclosure:
As stated See Attached Distribution DOCUMENT NAME: G:DRS\\ML041340659.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII NAME RJickling:sd KRiemer DATE 4/8/04 5/4/04
M. Nazar cc w/o encl:
J. Jensen, Site Vice President M. Finissi, Plant Manager R. Whale, Michigan Public Service Commission Michigan Department of Environmental Quality Emergency Management Division MI Department of State Police D. Lochbaum, Union of Concerned Scientists W. King, FEMA Region V ADAMS Distribution: