Supplemental Information on Maturity of Rosemount Model 1153 Series B Transmitters Addressed by NRC Bulletin 90-01 Supplement 1
ML041340460
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 05/05/2004
From: Kanda W
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BL-90-001, PY-CEI/NRR-2788L
Download: ML041340460 (1)


Text

FENOC Perry Nuclear Power Plant 10 Center Road FirstEnergy Nuclear Operating Company Perry Ohio 44081 William R. Kanda 440-280-5579 Vice President - Nuclear Fax: 440-280-8029 May 5, 2004 PY-CEI/NRR-2788L United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Perry Nuclear Power Plant Docket No. 50-440 Supplemental Information on Maturity of Rosemount Model 1153 Series B Transmitters Addressed by NRC Bulletin 90-01 Supplement I In Supplement 1 of Bulletin 90-01, "Loss of Fill-Oil In Transmitters Manufactured by Rosemount",

the Nuclear Regulatory Commission (NRC) staff requested licensees to respond within 60 days to provide a list of the specific actions to be taken on reliability issues with certain Rosemount transmitters. A letter dated March 11, 1993 (PY-CEI/NRR-1601 L), provided that list of actions and a schedule for their completion at the Perry Nuclear Power Plant (PNPP). These actions included implementation of monitoring programs on specified transmitters installed at PNPP which had not been in service long enough to be considered "mature", i.e., which did not yet meet the "psi-month" thresholds recommended by Rosemount.

Since these committed actions were to "implement" the monitoring programs, these actions were able to be closed out in that March 11, 1993 letter, since the programs were already in place.

However, the letter also stated that the NRC staff would be notified when all the Supplement 1 scope transmitters reach their psi-month threshold criteria. Accordingly, the following information is provided: Of the transmitters identified in Tables 1, 2, and 3 of Enclosure 1 to the March 11, 1993 letter, the last transmitter (1 E31 N088D) reached its specified threshold of 130,000 psi-months in January 2004.

There are no regulatory commitments contained in this letter. If you have questions or require additional information, please contact Mr. Vernon K. Higaki, Manager - Regulatory Affairs, at (440) 280-5294.

Very truly yours, cc: NRC Project Manager NRC Resident Inspector NRC Region IlIl