From:
To:
Date:
Subject:
<Bobleyse © aol.com>
<Chairman @ nrc.gov>
Wed, Apr 21, 2004 11:18 AM PRM-50-78 and Kewaunee
.Awsaw Ld.J 8 ffim=
MI.,
FR 4 4 3.1P7)
DOCKETED USNRC April 27, 2004 (9:30AM)
OFFICE OF SECRETARY RULEMAKINGS AND ADJUDICATIONS STAFF NRC action on PRM-50-78 is long overdue. At Kewaunee, fouling of heat exchangers for the safety injection pump oil coolers led to a shutdown on January 16, 2004. I find it laughable that NRC sent a special inspection team to look into this and NRC then had the audacity to report that it Determined that there was a safety problem.
And then, the NRC team was to issue a report of its findings. What has happened to the LER system? And are your resident inspectors so incompetent that they cannot verify the accuracy of an LER?
I note that Marion of NEI documented his organization's intense opposition to possible NRC actions that would anticipate the impact of fouling of heat transfer surfaces on nuclear plant safety.
Robert H. Leyse CC:
<jeb@nei.org>
7 lerrRloJ-e 3EeY-o4 7 S~ey-60"L