Meeting with Indiana Michigan Power Company (I&M) Concerning Scoping and Screening of Structures & Components Used in Developing the LRA for DC Cook, Units 1 & 2
ML041310231
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 05/10/2004
From: Rowley J
NRC/NRR/DRIP/RLEP
To: Nazar M
Indiana Michigan Power Co
Rowley J, NRR/DRIP/RLEP, 415-4053
References
Download: ML041310231 (7)


Text

May 10, 2004 LICENSEE: Indiana Michigan Power Company FACILITY: Donald C. Cook Nuclear Plant, Units 1 and 2

SUBJECT:

SUMMARY

OF MARCH 31, 2004, MEETING BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION (NRC) AND INDIANA MICHIGAN POWER COMPANY (I&M) CONCERNING SCOPING AND SCREENING OF STRUCTURES AND COMPONENTS USED IN DEVELOPING THE LICENSE RENEWAL APPLICATION FOR DONALD C. COOK NUCLEAR PLANT, UNITS 1 AND 2 The U.S. Nuclear Regulatory Commission staff (the staff) and a representative of Indiana Michigan Power Company (the applicant) held a meeting at NRC headquarters on March 31, 2004, to discuss the scoping and screening methodology used in developing the Donald C. Cook Nuclear Plant (Cook) license renewal application (LRA). The meeting was used to clarify whether or not the Cook boundary drawings that had been submitted with the LRA to aid the staff in their review of the application identified components that are subject to an aging management review (AMR), which is a subset of components within the scope of license renewal. The staff questioned the applicant as to whether or not the submitted license renewal drawings depict the boundaries for components within the scope of license renewal in accordance with Title 10 of the Code of Federal Regulation Part 54.4 (10 CFR). The applicant demonstrated its electronic database of components within the scope of license renewal to aid in the clarification.

The staff informed the applicant that providing a description of system scoping evaluation boundaries in relation to passive mechanical components that are within the scope of license renewal for 10 CFR 54.4(a)(1) and (a)(3) but not subject to an AMR would facilitate the staffs review. Also, the staff informed the applicant that describing the methodology used to identify mechanical component types that are non-safety related but are within the scope of license renewal, the location and systems containing these mechanical component types would facilitate the staffs review. The applicant agreed to furnish the requested information to the staff.

This was a Category 1 public meeting. Enclosure 1 provides a list of the meetings participants.

The applicant has had an opportunity to review and comment on this summary.

/RA/

Jonathan Rowley, Project Manager License Renewal Section A License Renewal and Environmental Impacts Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket Nos.: 50-315 and 50-316

Enclosures:

As stated cc w/enclosures: See next page

May 10, 2004 LICENSEE: Indiana Michigan Power Company FACILITY: Donald C. Cook Nuclear Plant, Units 1 and 2

SUBJECT:

SUMMARY

OF MARCH 31, 2004, MEETING BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION (NRC) AND INDIANA MICHIGAN POWER COMPANY (I&M) CONCERNING SCOPING AND SCREENING OF STRUCTURES AND COMPONENTS USED IN DEVELOPING THE LICENSE RENEWAL APPLICATION FOR DONALD C. COOK NUCLEAR PLANT, UNITS 1 AND 2 The U.S. Nuclear Regulatory Commission staff (the staff) and a representative of Indiana Michigan Power Company (the applicant) held a meeting at NRC headquarters on March 31, 2004, to discuss the scoping and screening methodology used in developing the Donald C. Cook Nuclear Plant (Cook) license renewal application (LRA). The meeting was used to clarify whether or not the Cook boundary drawings that had been submitted with the LRA to aid the staff in their review of the application identified components that are subject to an aging management review (AMR), which is a subset of components within the scope of license renewal. The staff questioned the applicant as to whether or not the submitted license renewal drawings depict the boundaries for components within the scope of license renewal in accordance with Title 10 of the Code of Federal Regulation Part 54.4 (10 CFR). The applicant demonstrated its electronic database of components within the scope of license renewal to aid in the clarification.

The staff informed the applicant that providing a description of system scoping evaluation boundaries in relation to passive mechanical components that are within the scope of license renewal for 10 CFR 54.4(a)(1) and (a)(3) but not subject to an AMR would facilitate the staffs review. Also, the staff informed the applicant that describing the methodology used to identify mechanical component types that are non-safety related but are within the scope of license renewal, the location and systems containing these mechanical component types would facilitate the staffs review. The applicant agreed to furnish the requested information to the staff.

This was a Category 1 public meeting. Enclosure 1 provides a list of the meetings participants.

The applicant has had an opportunity to review and comment on this summary.

/RA/

Jonathan Rowley, Project Manager License Renewal Section A License Renewal and Environmental Impacts Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket Nos.: 50-315 and 50-316

Enclosures:

As stated cc w/enclosures: See next page Accession No: ML041310231 DISTRIBUTION:

Document Name:C:\ORPCheckout\FileNET\ML041310231.wpd OFFICE PM:RLEP LA:RLEP SC:RLEP NAME JRowley MJenkins SLee DATE 5/10/04 5/10/04 5/10/04 OFFICIAL RECORD COPY

DISTRIBUTION: Dated: May 10,2004 Accession No: ML041310231 HARD COPY RLEP RF Jonathan Rowley (PM)

E-MAIL:

PUBLIC D. Matthews F. Gillespie C. Grimes RidsNrrDe E. Imbro G. Bagchi K. Manoly W. Bateman J. Calvo R. Jenkins P. Shemanski J. Fair S. Black B. Boger D. Thatcher R. Pettis G. Galletti C. Li M. Itzkowitz R. Weisman M. Mayfield A. Murphy S. Smith (srs3)

S. Duraiswamy Y. L. (Renee) Li RLEP Staff K. Coyne L. Lund S. Coffin T. Chan R. Gramm A. Howell M. Shuaibi J. Strasma, RIV M. Kotzalas OPA NRR/ADPT secretary (RidsNrrAdpt)

LIST OF PARTICIPANTS FOR MEETING WITH I&M ON SCOPING AND SCREENING METHODOLOGY USED FOR COOK LICENSE RENEWAL APPLICATION March 31, 2004 Participants Affiliation Jonathan Rowley U.S. Nuclear Regulatory Commission (NRC)

Johnny Eads (via phone) NRC Hanry Wagage NRC Russell Arrighi NRC Cliff Marks NRC Bob Kalinowski Indiana Michigan Power Company Enclosure 1

Donald C. Cook Nuclear Plant, Units 1 and 2 cc:

Regional Administrator, Region III Michigan Department of Environmental U.S. Nuclear Regulatory Commission Quality 801 Warrenville Road Waste and Hazardous Materials Div.

Lisle, IL 60532-4351 Hazardous Waste & Radiological Protection Section Attorney General Nuclear Facilities Unit Department of Attorney General Constitution Hall, Lower-Level North 525 West Ottawa Street 525 West Allegan Street Lansing, MI 48913 P.O. Box 30241 Lansing, MI 48909-7741 Township Supervisor Lake Township Hall David A. Lochbaum P.O. Box 818 Nuclear Safety Engineer Bridgman, MI 49106 Union of Concern Scientists 1707 H Street NW, Suite 600 U.S. Nuclear Regulatory Commission Washington, DC 20036 Resident Inspectors Office 7700 Red Arrow Highway Michael J. Finissi, Plant Manager Stevensville, MI 49127 Indiana Michigan Power Company Nuclear Generation Group David W. Jenkins, Esquire One Cook Place Indiana Michigan Power Company Bridgman, MI 49106 One Cook Place Bridgman, MI 49106 Mr. Joseph N. Jensen, Site Vice President Indiana Michigan Power Company Mayor, City of Bridgman Nuclear Generation Group P.O. Box 366 One Cook Place Bridgman, MI 49106 Bridgman, MI 49106 Special Assistant to the Governor Room 1 - State Capitol Richard J.Grumbir Lansing, MI 48909 Project Manager, License Renewal Indiana Michigan Power Company Mr. John A. Zwolinski Nuclear Generation Group Director, Design Engineering and 500 Circle Drive Regulatory Affairs Buchanan, MI 49107 Indiana Michigan Power Company Nuclear Generation Group Mr. Mano K. Nazar 500 Circle Drive American Electric Power Buchanan, MI 49107 Senior Vice President and Chief Nuclear Officer Mr. Fred Emerson Indiana Michigan Power Company Nuclear Energy Institute Nuclear Generation Group 1776 I Street, N.W., Suite 400 500 Circle Drive Washington, DC 20006-3708 Buchanan, MI 49107