ML041200053
| ML041200053 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 04/22/2002 |
| From: | Entergy Operations |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| 2403.001 | |
| Download: ML041200053 (35) | |
Text
8.0 INSTRUCTIONS PROC.IWORK PLAN NO.
2403.001 8.1 PERFORMANCE DISCHARGE TEST SET UP 8.1.1 Removal of 2011 from service:
PROCEDUREIWORK PLAN TITLE:
UNIT 11 2D11 PERFORMANCE TEST ELECTRICAL MAINTENANCE A.
Verify Charger 2D31 or alternate is powered M Y
Z Z
O L up and supplying power for Bus 2001.
B.
Obtain assistance from Operations to aid with the removal of 2Dll from service.
p a
r
-1%-6 Z
C.
Open the battery disconnect switch, 2D51
.2'Z-03.
WARNING The 2D01 side of the fuse connections are energized. Avoid contact when removing the fuses.
8.1.2 Remove the 1800 amp fuses.
PAGE:
6 of 40 CHANGE:
008-03-0 WARNING The Battery side of the fuse connections are energized. Avoid contact when removing the fuses.
8.1.3 Remove the pin indicating fuses from 2D41.
80,
+,-oz 8.1.4 Verify that Handswitch AS1 on 2D41 is in the "NORMAL" position.
~>.
WARNING The 2D01 side of the fuse connections are energized. Avoid contact when bolting cables from test load device.
8.1.5 Bolt the cables from the test load device to the 4-dZ-e'L battery side of the 1800 amp fuse connector.
SECOND PERSON VERIFIER A Second Person Verifier shall verify here step 8.
1 8.1.6 Install nonconductive cover over the terminals at the discharge unit load bank.
&/+-az-=-
PROC.IWORK PLAN NO.
8. 2 MEASURING CELL TEMPERATURE 2403.001 NOTE -
When using the Fluke model 51 DT to take temperature measurements, the DT PROCEDURElWORK PLAN TITLE:
and probe to be used must have a pre cal performed by the Met Lab before use and a post cal after use in the temperature range it is going to be used in.
A DSG (Digital Specific Gravity Meter1 may be used.
PAGE:
7 of 40 I
UNIT 11 2Dll PERFORMANCE TEST ELECTRICAL MAINTENANCE 8. 2. 1 Measure the cell temperature of each individual cell as listed on Attachment 1.
CHANGE:
008-03-0 NOTE IF the front sample tube is bent or broken, THEN the thermometer may be placed in the rear sample tube.
NOTE A second person shall observe, sign and verify after completion, that steps A throuqh C have been com~leted for all cells listed on Attachment 1 and 1 this vaiue recorded.
I NOTE Repeat steps 8.2.1.A through 0.2.1.C until all of the cells listed on I ~ttachment 1 been measured:
A.. Place the thermometer in the sample tube of the individual cell being measured. Thermometer should rest on the upper sample tube housing.
B.
Leaving the thermometer in the cell being measured for 15 seconds will allow the reading to stabilize.
C.
Record the temperature to the nearest 1/10 O F for each cell on Attachment 1.
SECOND PERSON VERIFIER An Second Person Verifier shall verify here and on Attachment 1 that temperature values were properly recorded in step 8 ate D.
IF any of the monitored cells have bent or Goken sample tubes, or broken thermometer parts in the cell, THEN record the cell number in the space provided below, and notify the Electrical Maintenance Supervisor; IF NOT, THEN mark this step N/A Supervisor Remarks:
E. -
IF any cell temperature deviates more than 3OC (5'F) from the other cells during inspection,'
THEN notify the Electrical Maintenance Supervisor; IFNOT.
THEN mark this step N/A PAGE:
8 of 40 CHPNGE:
008-03-0 PROC,IWORK PIAN NO.
2403.001 Supervisor Remarks:
PROCEDUREWORK P!AN TITLE:
UNIT 11 2Dll PERFORMANCE TEST ELECTRICAL MAINTENANCE F.
Calculate and record on Attachment 1 the c& 4 - 2 2 - d ~
average cell temperature of the monitored cells listed on Attachment 1.
I CAUTION OE-10978 has identified that some Albers test eoui~ment have a delav when I I
changing from 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> to 0001 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> on the internal clock. This can cause a shutdown of the test; therefore the internal clock shall be set at 0100 I 8.3.1 Connect any remaining battery load test set 4 - 2 2 0, control wiring needed for load monitoring or control.
8.3.2 Determine and record below the discharge current correction factor (K Factor) based upon the average cell temperature obtained in Step 8.2.1 and the Table on Attachment 1.
(K Factor) Disc rge Current Correction Factor:
- Y60 A Second Person Verifier shall determine and record below the discharge current correction factor (K Factor) based upon the average cell temperature obtained in Step 8.2.1 and the Table on Attachment 1.
I 2403.001 I
UNIT I1 2Dll PERFORMANCE TEST ELECTRICAL MAINTENANCE I
PROC.WORK PLAN NO.
8.3.3 Calculate the actual discharge current by dividing 258 by the K Factor from Step 8.3.2 258 amps
+
- 9 6 0 =
2&%3.9Y Rated discharoe K Factor Actual discharqe I
PROCEDURWORK PIAN TITLE:
2 current current PAGE:
9 of 40 258 Amps = 3 h?
Amps (K)
SECOND PERSON VERIFIER A Second Person Verifier is to calculate the actual discharge current by dividing 258 by the K Factor from Step 8.3.2 and record below.
258 amps Rated discharge
+
J
= '?& 75'5 zh9 K Factor Actual discharge current current 8.3.4 Set up the load tester to calculated in Steps 8.3.3 and 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> of discharge with a shutdowi setting of.75 VDC cell voitage or 105 M C bank voltage.
SECOND PERSON VERIFIER A Second Person Verifier shall verify that the load tester is set up correctly for a 1 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> discharge at the current value
.3.3 and a shutdown of.75 VDC or 105 VDC bank voltage.
&22-0L.
Date 8.3.5 Cognizant Supervisor shall verify calculations are correct and has granted permission to start A
the test
% 2 L,&&
CogYizant Supervisor Date I
8.3.6 Close 2D51 disconnect switch.
I 8.3.7 Start the discharge test.
f,M 9-22
-0%
8.3.8 Record the Start time on Data Sheet 1 and.
8.3.9 Adjust and maintain current throughout the test to the calculated value + 1% of setpoint, + 1 Amp. (i.e., Displayed Value 9 vary from setpoint by + 1%, then an additional + 1 Amp.)
I PROC.MIORK PLAN NO. I PROCEDURWORK PLAN TITLE:
UNIT 11 2011 PERFORMANCE TEST ELECTRICAL MAINTENANCE PAGE:
10 of 40 CHANGE:
008-03-0 NOTE Extra data may be taken and attached for the following test. The discharge rate and the battery voltage should be monitored from start to stop.
NOTE The print out from the Albers unit may be attached to this procedure to accompany the following step.
8.3.10 Monitor and record the discharge rate and the battery voltage at intervals established in Data Sheet 1.
8.3.11 the discharge is stopped for any reason other m/1[ 0s than a low voltage cell, THEN record the stop and restart times below; IF NOT, THEN mark this step N/A.
4-21-a&
Stop time /
Restart time 04: 5-8 zt-0'-
Reason for %scharge stop (jh.;b ch~Oqile~
/n&?.
8.3.12 IF an individual cell or cells are approaching 1.0 volts, THEN record the cell(s) number below and notify the Cognizant Supervisor immediately, continue the test closely monitoring the cell voltage to verify that no cell goes to 0.75 VDC; IF NOT, THEN mark this step N/A:
Cell number:
Volts:
Cell number:
Volts:
Cell number:
Volts:
8.3.13 -
IF at any time during the test a cell(s) voltage drops to 0.75 VDC, THEN stop the discharge immediately, contact the CognizantSupervisor and record the stop time below and on Attachment 3, and go to Attachment 2;
If NOT, THEN mark this step N/A:
Discharge Stop Time:
I 2403,001 I
UNIT 11 2Dll PERFORMANCE TEST ELECTRICAL MAINTENANCE PAGE:
11 of 40 CHANGE:
008-03-0 NOTE -
The final readings need to be rapidly taken as the decaying overall battery voltage approaches and goes below the 105 VOC voltage level.
8.3.14 Read the individual cell voltages and battery terminal voltage (rapidly) when the battery approaches 105 VOC, and record below and in the last column of Data Sheet 1.
Final Battery readings recorded: /@ 5.
8 e&/4-%3 o2 8.3.15 Decrease the test load to ';on when the overall
<&/4-33-02, battery voltage is 105 VDC.
8.3.16 Turn off test load.
8.3.17 Record the Stop Time above the last column on co/
Y - 2 3. 0 Z Data Sheet 1, and on Attachment 3.
8.3.18 Open 2D51 disconnect switch.
" * " ~ - o 8.3.19 De-energize load tester.
&&/
4 ! - Z 3 -4Z WARNING 2D01 side of fuse connections are energized. Contact should be avoided when drsconnecting cables.
8.3.20 Unbolt and remove the load test cables from the &&/L/-23-0 L
fuse cabinet.
8.3.21 Disconnect any remaining battery load test set d a 4 - 2 3 - 0 Z control or monitoring cables connected to the battery.
8.4 EQUALIZE CHARGE AND BATTERY RESTORATION 8.4.1 Place the battery on equalize charge by one of the following methods as directed by Cognizant Supervision. Supervision to record below the method to be used.
Mechod 1 L, Method 2 __
"Method 1" A.
Install the pin indicating fuses in 2D41. &/I+-
23-oz B.
Install the 1800 Amp fuses.
&/Y 6 2.
C.
Check tightness of all connections inside &&d/
A, 3 -& 2.
2D-51, tighten snug tight as necessary.
D.
Close the 2051 Disconnect Switch.
/5&/+>3
-4.;
E.
Verify that the electrical lineup is
&&+-23-0~.
restored and the charger is working properly.
PROC.IWOW PPLA NO.
2 4 0 3. 0 0 1 '
F.
Record below the charger being used Charger used: 2 0 '3 / A PROCEDUREWORK PLAN TITLE:
UNIT 11 2Dll PERFORMANCE TEST ELECTRICAL MAINTENANCE G.
Place the battery on an equalize charge.
(Charger set point is 135.2 to 137.5 volts)
Record below the eaualizinq start time and PAGE:
12 of 40 CHANGE:
008-03-0 voltage.
. DS : oo /4.23-&2 1 3 7-3 Start time Date Voltage NOTE Step 8.5 may be performed at any trme after Step 8.4 1 G has been accomplished.
H.
Record below the equalize voltage at the battery after 15 hours1.736111e-4 days <br />0.00417 hours <br />2.480159e-5 weeks <br />5.7075e-6 months <br /> from the start of equalization.
u I.
WHEN the equalize charge current reaches less than 2 amps (end of charge current),
THEN place the battery on float charge.
Record below the equalizing stop time, date. and voltaae.
2 1 4 : ~ o 4
0 J261.S Stop time Date Voltage "Method 2" NOTE 1
I A Temp. Mod. may be required to power the spare battery charger.
I
'\\
A.
Install the pin indication fuses in 2D41':
B.
Bolt 2-2/C 2/0 AWG cables or greater from the spare 200 Amp battery charger.(SCI Model RCS200 or equal) to the battery side of the 1800 Amp fuse connector.
C.
Close the 2D51 Disconnect Switch.
PAGE:
13 of 40 C W G E :
008-03-0 PROCJWORK PLAN NO.
2403.001 NOTE Charging at the higher equalize voltage of 144 min. - 145 max. will create more gas and heat than at the normal equalize charge of 135.2 to 137.5 volts PROCEDURWORK PLAN TITLE:
UNIT 11 2D11 PERFORMANCE TEST ELECTRICAL MAINTENANCE D.
Place the battery bank on a high level equalize charge of 144 min. - 145 max.
volts and perform the following.
NOTE Banana jacks and wiring will be installed across the shunt and mounted on the charger to facilitate the voltage measurements.
- 1.
Record below the equalizing start time and voltage.
I Start time Date Voltage NOTE Step 8.5 may be performed at any time after the battery has been placed on equalize charge (or at the same time the battery is being placed on equalize charqe).
- 2.
Monitor the current supplied by the spare battery charger.
- 3.
Maintain charger voltage at 144 min -
145 max.
- 4.
Monitor electrolyte temperature to ensure it does not exceed 120° F.
during the high level equalize charge.
NOTE When using the Fluke model 51 DT to take temperature measurements, the DT and probe-to be used must have a pre cal ~eriormed by the Met Lab before use and a post cal after use in the temperature range it is going to be used in.
A DSG (Digital Specific Gravity Meter) may be used.
- 5.
When the equalize charge current reaches the range of 20 amps or below, "open" Disconnect switch 2D51 and measure the current by using a Fluke Digital Multimeter 8842A or equivalent across J1 and 52 of 2041. (100mv = 20 amps)
PROC.!WORK PLAN NO.
- 6.
Stop the equalize charge (by deenergizing the spare battery charger) when the current reaches less than 2 amps as measured in 2D41.
Record below the equalizing stop time, date and final measurement reading.
2403.001
/
Stop time Date Mv Amps PROCEDUREWORK PLAN TITLE:
E.
Verify 2D51 Disconnect switch is open.
F.
Verify that the spare battery charger is disconnected and determinate the cables from the charger and 2D41.
PAGE:
140f 40 UNIT 11 2Dll PERFORMANCE TEST ELECTRICAL MAINTENANCE I
G.
Install the 1800 amp fuses.
CHANGE:
008-03-0 H.
Check tightness of all connections inside 2D-51, tighten snug tight as necessary.
I.
Close the 2D51 Disconnect switch.
J..
Place the battery on float charge.
/
NOTE -
124.7 VDC is the Tech Spec value (lower limit) for a 58 cell bank's float voltage,. However, the as left float voltage should be 127.6 to 130.5 when measured at the battery terminal.
8.4.2 Record the float voltage measured at the battery below:
& d s - a - a L 6-
< - a 4 Voltage ACCEPTANCE IF the float voltage "is not" within 127.6 to CRITERION 130.5 volts, THEN notify the Electrical Supervisor and/or m f o r an evaluation of the problem.'
IF the float voltage is below 124.7 VDC, notify the Electrical that a possible Tech Spec violation exists.
8.5 BATTERY CAPACITY CALCULATION 8.5.1 IF Attachment 2 was used, THEN use the new calculated T, from step 15 of ;
IF NOT, THEN obtain T, from Data Sheet 2, m
r t
Time - Stop Time)
+
5 2
IF the discharge was stopped in step 8.2.11, THEN the time that the discharge was stopped (from data in 8.2.11) must be subtracted from tce T, to obtain the actual length of the test (Tk) for step 8.5.3; IF NOT, THEN mark this step N/A.
NOTE The Eo$lowing calculations is requiredcocomp with Tech Spec step 4.8.2.3 E.
PROC.NVORK PLAN NO.
2403.001
@.5.3 Determine the capacity of the battery by completing the following equation:
Clb
% capacity at 77OF = (TA / TS) x 100 og"L,Os*udD T = Actual time of the.test in minutes.
A T = Rated time to specified terminal voltage S
in minutes (8hrs. or 480 minutes)
TA (minutes) x 100 = Yg.3 % capacity 480 minutes SECOND PERSON VERIFIER A Second Person Verifier shall repeat the calculations for determining the capacity of the battery.
TA (minutes) x 1 0 0 =
% capacity 480 minutes
&+
ate PROCEOURE~~ORK PLAN TITLE:
UNIT 11 2011 PERFORMANCE TEST ELECTRICAL MAINTENANCE
/
/
NOTE Per Tech Spec 4.8.2.3.e and f, battery capacity must be 280%. However, if capacity is c90%, then the 60 month Performance Discharge Test must be performed every 18 months.
PAGE:
IS of 40 CHANGE:
008-03-0 8.5.4 Notify System Engineering to evaluate the calculated capacity to determine compliance with Tech Spec. 4.8.2.3.E and 4.8.2.3.F.
8.6,
BATTERY MAINTENANCE NOTE -
When tightening the terminal connectors, two insulated wrenches should be used, applying one as counter-torque to prevent damage to the terminal post.
If just, checking the torque of a 5/16 inch stainless bolt connection that was not disassembled then 125 in/lb is the proper value., If the connection was loosened or disassembled then torque to 165 in/lbs. Step 8.6.1 through 8.6.7 may be accomplished at any time after Step 8.4.6 has been accomplished. S t e m 8.6.8 throuqh 8.6.10 mav be accom~lished after eaualize charge current diminishes to a low enough 1e;el such that charge current does not affect resistance readings.
8.6.1 Verify that all battery connections are tight b y h torquing each intercell/intertier connection to 125 in/lbs
PAGE:
160f 4 0 CHANGE:
00803-0 PROC.IWORK PLAN NO.
2403.001 8
8.6.2 Record below the torque wrench used, calibration due date and the torque values:
Torque wrench number: n~
) ~ g %
Calibration due date: 5-2<.09 Torque value: /25;u)&
4%
, 9 - 2 4 P NOTE The micro-ohm limit is for the intercell straps and cable connections. The cable connections need to be measured from the battery post to terminal lug.
PROCEDUREIWORK PLAN TITLE:
UNIT I1 2Dll PERFORMANCE TEST ELECTRICAL MAINTENANCE I
I 8.6.3 Perform an "As Left" micro-ohm check and record
~
~
the reading in the "As Left" section of Data Sheet 2.
8.6.4 Verify if any intercell micro-ohm reading is greater than 150 micro-ohms and check the appropriate space below:
IF the answer is 'yes",
THEN proceed to step 8.6.5.
IF the answer is "no",
THEN mark steps 8.6.5 through 8.6.7 "N/A" and proceed to step 8.6.8.
8.6.5 IF the answer to 8.6.4 was "Yes".
THEN perform the following; IF NOT, THEN mark the following steps N/A.
Open disconnect switch 2D51.
Disassemble the affected connection(s)
Clean and neutralize the affected connections using baking soda and water, then coat the connections per C&D Manual (TM C 173.0010) and reassemble.
Torque the affected connections to 165 in/lbs.
Micro-ohm the affected connections
PROCJWORK PIAN NO.
F.
Record the micro-ohm readings of the affected connections on Data Sheet flagging them as the second As Left" reading.
2403.001 IF the second "As Left" reading S acceptable, THEN proceed to step 8.6.7.
IF the second "As Left" reading is acceptable, PROCEDUREWORK PLAN TITLE:
e p r o c e e d to step 8.6.6.
PAGE:
17 of 40 UNIT 11 2Dll PERFORMANCE TEST ELECTRICAL MAINTENANCE 8.6.6 IF the reading is still unacceptable, THEN perform the following.
IF the reading is acceptable, E
N mark steps A through F "N/A" and proceed to step 8.6.7.
CHANGE:
008-03-0 A.
Verify Disconnect Switch 2D51 is open.
6.
Replace the affected parts.
C.
Clean and neutralize replacement parts and coat connections per C&D Manual (TM C 173.0010) and reassemble.
D.
Torque connections to 165 in/lbs.
- E.
Obtain an "As Left" resistance reading. AfLL F.
Record action taken and readings on the "As Left" comments section of Data Sheet 2.
8.6.7 Close Disconnect Switch 2D51.
Place the battery bank on Float charge and 5ee record the time, date and float voltage below:
Time and Date /L/
/L/.&5-Ql, Float Voltage 17 Y. <
M C 8.6.9 Perform 3 random specific gravity readings on the 2Dll battery bank, using procedure 2403.024 as a guide, to determine if stratification of these cells exist.
A. -P stratification of the tested cells electrolyte exists,.
THEN mix the electrolyte in each cell of the battery bank for 30 minutes on each cell, using a variable speed micro pump, with suction taken from the top of the cells through the flame arrestor hole, and discharge through the sample tube to the bottom of the cells; IF NOT,
-- THEN mark this step N/A.
B.
Verify cell parameters meet ER-ANO-2002-0503-001 Table 2 acceptance criteria for declaring 2Dll operable for a maximum 7 days (ref. T.S. 4.8.2.3).
9.0 RESTORATION AND CHECKOUT&^,./^
,dbue 4 - I Y - ~ I prom kwe' ch0n5c bt.os dmL-4-%4-6%
9.1 IF any Condition Reports were issued during the performance of this Drocedure, s
THEN attHch a copy of the Condition Report to this procedure; IF NOT, THEN mark this step N/A PROC.IWORK PLAN NO.
2403.001 9.2 Verify that the requirements of Housekeeping Level I1 have
/<-/--
been met.
9.3 '
Verify that the measuring and test equipment have no known deficiency.
PROCEDURUWORK PLAN TITLE:
UNIT I1 ZDll PERFORMANCE TEST ELECTRICAL MAINTENANCE 9.4 '
Verify with operations that 2Dll has been returned to its 1s'-1-0" normal operation/lineup.
PAGE:
18 of 40 CHANGE:
00803-1 NOTE 124.7 VDC is the Tech Spec value (lower limit1 for a 58 cell bank's float voltage. However, the as left float voltage should be 127.6 to 130.5 when measured at the battery terminal.
Verify that the battery bank float voltage is between 127.6 and 130.5 VDC when on normal float charge.
Verify that all cell-to-cell and terminal connections are less than or equal to 150 mocro-ohms.
Verify that the battery log book has been updated to include the following:
9.7.1 Date this procedure was performed.
9.7.2 Time this procedure was started.
44% /5/-/-0%
9.7.3 Time this procedure was completed.
C f < L - - /5-J-02 9.7.4 Any problems encountered and corrective action A<\\
15 0"-
taken.
9.7.5 Performer of this procedure.
Notify the Unit 2 Operations Shift Manager that the 2Dll A(4r /$-/-ow Performance Discharge Test is complete and the battery charger is not on equalize or battery disconnected from the bus.
PAGE:
19 of 40 C W G E :
008-03-0 PR0c.IWOP.K PLAN NO.
2403.001 9.9 Perform post test check of torque wrenches on Torque Tester and record the following:
PROCEDUREWORK PLAN TITLE:
UNIT II ZDII PERFORMANCE TEST ELECTRICAL MAINTENANCE Equip. No.y&,.- 7 il?-
- Cal. Due D a t e s fi5 Equip. No. TLV-65'5 Cal. Due Date 6 / / /a 9.10 All setpoints and tolerances in this procedure have been checked and are verified to be within the limits herein specified and any exceptions are noted.
Comments/Actions taken:
NOTE Per Tech Spec 4.8.2.3.f, this dischargest must be accomplished every 18 months instead of 60 months the battery shows signs of degradation, or has reached 85% of the service life (year 2003 for 2011). Degradation is indicated when the battery capacity drops more than 10% of rated capacity from its average on previous performance tests, or is below 90% of the manufacturer's rating. 2D-11 has had one test performed prior to 10/12/99.
The capacity at that time was recorded to be 116.25% (50.873102, microfilm
- 641013811 and 106.5566% recalculated under CR-2-97-0444(JO-956320 on IDEAS). The measured capacity of the test being performed must be compared to the average of the tests previously accomplished. Should the measured capacity fall MORE THAN 10% below the 111.4033%. then the 2403.001 surveillance must be rescheduled to be accomplished every refueling outage 9.11 Battery capacity as measured during this test have been compared.with the measured capacity observed during previous tests The capacity average or-does warrant the performance of this test every refueling outage in the future.
The capacity average or battery condition does not warrant the performance of this test every refueling outage in the future.
~es~ons$kde Engineer 9.12 A PIF has been submitted to include this latest test data in this procedure for use next performance.
9.13 A copy of these test results has been forwarded to the
&//5 6 2 -
responsible engineer.
PAGE:
20 of 40 C W G E :
008.030 -
P R O C M R K PLAN NO.
2403.001 10.0 ATTACHMENTS AND FORMS 10.1 ATTACHMENTS 10.1.1 - Discharge Current Correction K Factor For Temperature 10.1.2 - Jumpering Low Voltage Cells 10.1.3 - Calculation for Total Down Time 10.1.4 Data Sheet 1 - Performance Discharge Teat Battery Bank Voltage 10.1.5 Data Sheet 2 - "As Left" Resistance 10.2 FORMS 10.2.1 None PROCEDUREWORK P U N TITLE:
UNIT II 2011 PERFORMANCE TEST ELECTRICAL MAINTENANCE
PAGE:
21 of 40 CHANGE:
008-03-0 PROC.MIORK PLAN NO.
2403.001 (1.
ATTACHMENT I PROCEDURWORK PLAN TITLE.
UNIT II 2Dll PERFORMANCE TEST ELECTRICAL MAINTENANCE I
DISCHARGE CURRENT CORRECTION FACTOR K FOR TEMPERATURE NOTE When using the Fluke model 5 1 DT t o take temperature measurements, the DT and probe t o be used must have a pre c a l performed by t h e Met Lab befor? use and a post c a l a f t e r use i n t h e temperature range it is going t o be used i n.
A DSG ( D i g i t a l Specific Gravity Meter) may be used.
Cell No.
Temp.
( F )
(nearest 1/10 OF1 Total f o r 10 c e l l s
=
fS47.3 Temp. Total f o r 10 c e l l s = Avg. Temp
.In I"
85-Average Temp.
S
+
. 7 O F Req. Factor K =
9 6 0 Average Temp. (F)
Factor K (nearest 1/10 OF)
Test Equip.,, # b 5& -06 Cal.
4 / 2 r /o=
Date f /zz,6'z Date
PAGE:
22 of 40 CHPNGE:
008-03-0 PROCJWORK P M
NO.
2403.001 ATTACHMENT 2 Page 1 of 5 Performance Test Cell Jumpering Procedure PROCEDUREWORK PLAN TITLE:
UNIT II ZDll PERFORMANCE TEST ELECTRICAL MAINTENANCE NOTE I
This Attachment provides a method to BY-PASS a low voltage cell.
I NOTE Responsible Engineer shall review Attachment 2 if attachment is required for.
procedure. completion.
NOTE -
- 1.
I A Second Person Verifier shall verify the content of steps 10, 11, and 15.
1 NULE TWO - 250 mcm cables with 3/8 - 1/2 1 G a b l e s approximate length is 10 feet will be needed for the cell jumpering. These are available in the Maintenance Facility Battery Storage Room.
Record the number of the,cell(s) at or below 0.75 VDC, the Stop Time, the Cell voltage and the Bank Voltage below and on Attachment 3.
Cell umber:^ Cell Voltage:-
Stop Time:
Bank Voltage:
Cell Number:-
Cell Voltage:-
Stop Time:
Bank Voltage:
cell NU&&:^ Cell Voltage:-
Stop Time:
Bank Voltage:
Cell Number:-
Cell Voltage:-
Stop Time:
Bank Voltage:
NOTE At this time the Cognizant Supervisor shall make the judgement to determine if the cell(s) should be jumpered or to continue the test with the cell(s) installed. This judgement should be based on Total Test Time,,overall Bank Voltage, and the number of cells at or below 0.75 volts.
IF th; Cognizant Supervisor's judgment is to continue the test with the cell(s) installed, THEN restart the discharge at the calculated current and record the restart time below and on Attachment 3. Continue recording data on Data Sheet 1 and discharge the bank until the bank voltage approaches 105 VDC, N/A Steps 3 through 11 of this Attachment and continue with Step 12.
IF the Cognizant Supervisor's judgement is to jumper the cell(s),
THEN mark "Restart Time" below N/A and continue with Step 3.
Restart Time:-
/
Cognizant Supervisor Date
I PROC.IWORK P L
~
NO. I PROCEDUREWORK PLAN TITLE:
PAGE:
23 of 40 ATTACHMENT 2 Page 2 of 5 2403.001
- 3.
Open 2D51 Disconnect Switch.
2 Figure 1 UNIT II 2Dll PERFORMANCE TEST ELECTRICAL MAINTENANCE WARNING Jumperjng, shorting or connecting the positive and negative lugs of a single cell may cause equipment damage or personnel injury.
NOTE Jumpering of end cell may be accomplished by using the inter-tier or inter-bank cables.
C M G E :
008-03-0
- 4.
Using Figure 1 as a guide only and presuming "B" is the affected cell then remove bolts and intercell connection straps from the low voltage cell and its adjacent cell terminals.
NOTE Based on which is the low cell you may be jumpering the negative of A to the positive of C. As shown below in figure 2.
Figure 2
PROCJWORK PIAN NO.
ATTACHMENT 2 Page 3 of 5 2403.001 5.
Bolt a (250 mcm) jumper from the left negative Battery A terminal
/
to the left positive Battery C terminal, using the same stainless bolts as used in the intercell connection straps.
PROCEDURWORK PLAN TITLE:
- 6.
Bolt another (250 mcm) jumper from the right negative Battery A terminal to the right positive Battery C terminal, using the same 2 stainless bolts as used in the intercell connection straps.
PAGE:
24 of 40 UNIT 11 2Dll PERFORMANCE TEST ELECTRICAL MAINTENANCE
- 7.
Torque terminal bolts to 165 in/lbs and record below the torque value, and the recal date:
d CHANGE:
008-03-0 Torque wrench number:
Torque value:
Recal, Date:
- 8.
Discharge the battery to a new voltage of 105 - (1.81 x # of Cells Jumpered) - new voltage Example :
lo5 - (1.81 x 1 cell ) = 103.19 VDC 105 - (1.81 x 2 cells) = 101.38 VDC 105 - (1.81 x
) -
New Discharge Voltage SECOND PERSON VERIFIER A Second Person Verifier shall verify the "New Discharge Voltage" in step 8 is correct.
/
Second Person Verifier Date
- 9.
Close82D51 Disconnect Switch.
2 CAUTION While discharging, continue to watch for cells falling below.75 VDC.
- 10.
Restart discharge at the calculated current.
2
I PROC.MIORK PLAN NO. I PROCEDURENVORK PLAN TITLE:
1 2403.001 I
UNIT II 2Dll PERFORMANCE TEST ELECTRICAL MAINTENANCE PAGE:
25 of 40 C W G E :
008-03-0 ATTACHMENT 2 Page 4 of 5
- 11.
Record the restart time (below and on Attachment 3), and battery terminal voltage after the load is applied:
Discharge started at Amps Time restarted:
overall battery terminal vqltage VDC I
SECOND PERSON VERIFIER A Second Person Verifier shall verify step 11 was correctly comppeted.
/
Second Person Verifier Date
- 12.
Read and record in the last column of Data Sheet 1, the discharge battery overall bank voltage and cell voltages in the final moments before the minimum calculated voltage is reached.
- 13.
Stop the test and de-energize the test equipment. Record the Stop Time on Attachment 3, on Data Sheet 1 and below:
Stop Time:
2
- 14.
Open 2051 disconnect switch.
2
- 15.
Find the Down Time and old T, from Attachment 3 and use below to figure the New T,:
Old Tk Down Time New T, 2
SECOND PERSON VERIFIER A Second Person Verifier shall verify the "New TA" in step 1 5 is correct.
Second Person Verifier Date
I 2403.001 I
UNIT 11 2DIl PERFORMANCE TEST ELECTRICAL MAINTENANCE I C W G E :
008-03-0 1
PROCJWORK PLAN NO.
ATTACHMENT 2 Page 5 of 5 IF cells were jumpered due to low voltage, THEN Engineering and the Cognizant Supervisor must be notified and 2 an evaluation made of cell condition prior to re-assembly of PROCEDUREMORK PLAN TITLE:
batte,ry connections.
PAGE:
26 of 40 IF cells were jumpere'd, THEN restore battery connections as follows:
A.
Clean and neutralize the affected connections using baking soda and water.
B.
Coat the connections per C&D Manual (TM C 173.0010) and
/
reassemble.
IF cells were jumpered, THEN torque the connections to 165 in/lbs and record below the 2 torque value used and the recal date of the torque wrench used.
Torque wrench number:
~orqu'e value:........
Calibration due date:
.2 IF cells were jumpered, THEN micro-ohm the affected connections and record the affected 2 connections on Data Sheet, flagging them as the second "As Left" reading.
Mark Steps 8.3.14 through 8.3.19 N/A and proceed with Step 8.3.20
/
NOTE Responsible Engineer's signature is not needed to continue the work.
- 21.
Respopsible Engineer has reviewed data of Attachment 2
/
Responsible Engineer Date
ATTACHMENT 3 CALCULATION FOR TOTAL DOWN TIME
- 1.
Start Time, Stop Time (A) 'Start Time:.A
( B )
Stop Time:
(C) Start Time:-
252 (D) Stop 'Time:-..
(E) 'start Time:
(Fl Stop Time:
(G) Start Time:
(H) Stop Time:
SECOND PERSON VERIFIER PROC.IWORK PLAN NO.
2403.001 n
A Second Person Verifier shall verify the "Start, Stop" time in step1 is correct.
/
Second Person Verifier Date NOTE,
The Total Down Time Calculation is for the Total Time the test is stopped for jumpering cell(s), broken test equipment etc. The Final Stop Time (last stop time from above) shall not be used in the calculation.
PROCEDUREWORK PLAN TITLE:
UNIT 11 2Dll PERFORMANCE TEST ELECTRICAL MAINTENANCE Total Down Time PAGE' 27 of 40 CHANGE.
008-03-1
~ o t a i Down Time (in minutes) = (C - El + (E - D) + (G - F)
Total Down Tlme (ln mlnutes) = (
)
+ (----
1
+ (---
) = --
SECOND PERSON VERIFIER A Second Person Verifier shall verify the "Start, Stop' time in,
step, l is correct.
3=-
1-Second Person Verifier Date
- 3.
Old T, Calculation Old T,
(A) - (Final Stop Time1 Old +*
SECOND PERSON VERIFIER A second Person Verifier shall verify calculations are correct in step ~ 3.
SF
-- /
Second Person Verifier Date
ATTACHMENT 4 MINIMUM SAFETY APPAREL FOR BATTERY MAINTENANCE***
PAGE:
28 of 40 CHANGE:
008-03-0 PROC.NVORK PLAN NO.
2403.001 PROCEDURENVORK PLAN TITLE:
UNIT II 2D11 PERFORMANCE TEST ELECTRICAL MAINTENANCE Eye Wash Statim-X X
X X
X X
~p X
X X
- Hard Hacs are not required inside Station Battery Room while performing routine battery maintenance.
.**Applies to person subjected to hazard only.
~
-~~
- - - - ~
~-
Activity Cell or Battery Change Out Daily Surveillance Weekly Surveillance Quarterly Surveillance and Discharge Tests Electrolyte Add or Removal Electrolyte Mixing Connection Cleaning and or Disconnecting Adding Water Cell Cleaning Emergency 12 Volt Light Battery Maintenance Minimum Requirements Diesel Fire Pump or Diesel Generator Battery Surveillance Change Out
- Face shields may be worn without hard hacs, and a
Apron X
X
~
Safety Glasses w/side shield X
X X
X X
X X
X X
X X
X must be non-metallic Glwes X
X X
X X
X X
X X
X X
X
~p
~
Pace Shield or m l e s
- X X
X X
Plastic Suit X
~~p
PROC.IWORK PLAN NO.
DATA SHEET I PROCEDURWORK PLAN TITLE:
I PAGE:
29 of 40 1
2403.001,
Page 1 of 6 Performance Discharqe Test UNIT 11 2D11 PERFORMANCE TEST ELECTRICAL MAINTENANCE Battery Bank and cell-voltages Battery Bank S t a r t Time
) < 2
- CHANGE:
008-03-0 Performed by AT-
/ L/- 21
~ i g l h $ t u r e Date
I 2403'001 1
ELECTRICAL MAINTENANCE UNIT 11 2011 PERFORMANCE TEST CWGE:
008-03-0 I PROC.IWORK P w
NO.
DATA SHEET 1 Page 2 of 6 Performance Discharge Test Battery Bank and Cell Voltages Battery Bank a PROCEDUREWORK PLAN TITLE:
Test ~ ~ u i p :
O L 7 - 6703 5/4- !7 PAGE:
30 of 40 Performed by 4-22-cz Sigature U Date Cal. Due: ' ' - ' * - Q ~
/ / -, 9 - 8 2
a+ 0
~
~
DATA SHEET 1 Page 3 of 6 R&I*
Performance Discharge Test Battery Bank and Cell Voltages
- i.
Battery Bank PROCJWORK PLAN NO.
2403.001 8 A. /-:#,..
Performed by
/ 4-23-72 Signature Date PROCEDURWORK PLAN TITLE:
UNIT II 2 D I l PERFORMANCE TEST ELECTRICAL MAINTENANCE Terminal voltage of 105 volts may be reached before a hour or X hour reading can be taken. Indicate the number of minutes past the hour or half hour above the column where the last reading was taken at test completion.
PAGE:
31 of 4 0 CHANGE:
008-03-0
PROC.MIORK PLAN NO. I PROCEDURWORK PLAN TITLE:
I PAGE:
32 of 40 1
DATA SHEET 1 Page 4 of 6 2403.001 Battery Bank Performance Di'scharge Test Battery Bank and Cell Voltages UNIT 11 2D11 PERFORMANCE TEST ELECTRICAL MAINTENANCE Bank Voltage: 1 1 6.4' S t a r t Time: )g'.2% 4-a¶-O-L Stop Time:
0 7. ' / 5 - + - a ~. o z CHANGE:
008-03-0 15 Hours I 16 Hours 1 17 Hours 1
- 18. Hours 1 I
Performed by
/ 4 dZ Signature Time NOTE Terminal voltage of 1 0 5 v o l t s may be reached before a hour o r % hour reading can be taken.
I n d i c a t e t h e number of minutes p a s t t h e hour o r half hour above the column where t h e l a s t reading was taken a t t e s t completion.
PAGE:
33 of 40 C W G E :
008-03-0 PROC.IWORK PLAN NO.
2403.001 DATA SHEET 1 Page 5of ' 6 PROCEDUREWORK PLAN TITLE:
UNIT 11 2Dll PERFORMANCE TEST ELECTRICAL MAINTENANCE Performance Discharge Test Battery Bank and Cell Voltages Battery Bank NOTE
~ermina'l voltage of 105 v o l t s may be E h e d before a hour o r % hour reading can be taken.
Indicate t h e number of minutes p a s t t h e hour o r half hour above t h e column where the l a s t reading was taken a t test completion.
PROCJVJORK PLAN NO. I PROCEDURWORK PLAN TITLE:
I PAGE:
340f 40 I
I 2403.001 I
UNIT 11 2D11 PERFORMANCE TEST ELECTRICAL MAINTENANCE CHANGE:
008-03-0 DATA SHEET 1 Page Go£ 6 Performance Discharge Test Battery Bank and Cell Voltages Battery Bank a 10 Hours 11 Hours Performed by
/
Signature Time NOTE Terminal voltage of 105 volts may be reached before a hour or M hour reading can be taken. Indicate the number of minutes past the hour or half hour above the column where the last reading was taken at test completion.
DATA SHEET 2 Page 1 of 6 PROCNORK PLAN NO 2403.001 "AS LEFT".
BATTERY BANK 2Dll PROCEDURENORK PLAN TITLE:
UNIT 11 2Dll PERFORMANCE TEST ELECTRICAL MAINTENANCE 3ATTERY RACK/ RECORD RESISTANCE
'ELL TO CELL^
IN MICRO-OHMS FOR PAGE:
3 5 of 40 CHPNGE.
008-03-0 3ATTERY RACK RECORD RESISTANCE I
- ELL To CELL l IN MICRO-oms FOR I CONNECTIONSI LISTED CONNECTIONS I I 15~1-16P11 15N2-16P21 1
1 16N1-17Pll 16~2-17~21 17 - 18 1
I
/
18N1-19P11 18N2-19P21 18 - 19 1
I 20~1-21~11 20~2-21~21 I 21N1-22Pll 21N2-22~21 21 - 22 1
I 22 - 23 1
/ 23~1-24~11 23~2-24~21 23 - 24 1
1 24 - 25 1
26N1-27P1/ 26~2-27~21 I--
26 - 27
/ 27~1-28~11 27N2-28P21
DATA SHEET 2 PROC.IWORK PLAN NO.
2403.001 Page 2 of 6 BATTERY BANK 2Dll PROCEDUREWORK PLAN TITLE:
UNIT II ZDll PERFORMANCE TEST ELECTRICAL MAINTENANCE "AS LEFT" PAGE:
36 of 40 CHANGE:
008-03-0 BATTERY RACI 3ATTERY RAC1
- ELL TO CELI CONNECTION$
29 - 30 RECORD RESISTANCE IN MICRO-OHMS FOR LISTED CONNECTIONS 29~1-30~11 29N2-30P2 2 - I a 5 30N1-31P1/ 30N2-31P2 I
+!zzhL 3 N1-33Pll 32N2-33P2 20 1 2 %
33N1-34Pll 33N2-34P2 XIJL 34N1-35Pll 34N2-35P2 23 1 2 4 35N1-36P11 35N2 3 6 E 3
~
1
~
36~1-37~11 36N2-37P2
~
I L
37N1-38~11 37N2-38P2 23 124 38N1-39~11 38N2-39P2 2 2 I2c 40N1-41~11 40N2-41P2 RECORD RESISTANCE CELL TO CELI CONNECTION!
DATA SHEET 2 Page 3 of 6 "AS LEFT" BATTERY BANK 2Dll PROCJWORK PLAN NO.
2403.001
[BATTERY RACK CELL TO TERMINAL
[PLATE AND TERMINAL PLATE TO
/CABLE CONNECTIONS I
I 1 TERMINAL PLATE,TO CELL # 1 I
I j TERMINAL PLATE TO INCOMING 250 MCM PROCEDURElWORK PLAN TITLE:
UNIT 11 2 D l l PERFORMANCE TEST ELECTRICAL MAINTENANCE I
I TERMINAL PLATE TO
/ CELL # 19' I
PAGE:
37 of 40 C W G E :
008-03-0 i
I TERMINAL PLATE ON CELL # 19
/TO INTERTIER 4/0 CABLE LUGS I
RECORD RESISTANCE IN 1
YICRO OHMS FOR LISTED I CONNECTIONS 1P1-TERM. PLT.
i C
-I J
1P2-TERM. PLT.
I I
'7 I
TERM. PLT.-LUG#l I I 255 I
TERM. PLT.-LUG#2 I
I I TERM. PLT. -LUG#3 I
10 I
19N1-TERM. PLT.
9 I
19N2-TERM. PLT.
/
4 I
1 TERM. PLT. -LUG#l I
/ 3 I
TERM. PLT.-LUG#2
/o I
TERM. PLT:LUG#3 I
- I
) 4 I
TERM. PLT.-LUG#4 I
I I f I
TERM. PLT.-LUG#5 I
I
/q I
TERM. PLT.-LUG#6 I
I
DATA SHEET' 2 "AS LEFT" I
BATTERY BANK 2Dll BATTERY RACK CELL TO TERMINAL IRECORD RESISTANCE IN PLATE AND TERMINAL PLATE TO
/MICRO OHMS FOR LISTED CABLE CONNECTIONS CONNECTIONS I 20P1-TERM. PLT.
TERMINAL 'PLATE TO CELL # 20 I
I j L I 20~2-TERM.
PLT.
I PAGE:
3 8 of 4 0 CHANGE:
008-03-0 PROCNYORK P M
NO.
2403.001
/ TERM. PLT. -LUG#l PROCEDUREWORK P M
TITLE:
UNIT 11 2 0 1 1 PERFORMANCE TEST ELECTRICAL MAINTENANCE I
I 1 TERM. PLT.-LUG#2 I
I
/
TERM. PLT.-LUG#3 I
TERMINAL PLATE ON CELL # 20 I
/ 0 TO INTERTIER 4/0 CABLE LUGS I TERM. PLT.-LUG#4 I
I 1 TERM. PLT. -LUG#5
'3 I
U I TERM. PLT.-LUG#6 I
I
/ 39N1-TERM. PLT.
TERMINAL :PLATE TO CELL # 39.
I I
/
39N2-TERM. PLT.
I I
I
. 10 CERMINAL PLATE ON CELL # 39 1 TERM. 'PLT. -LUG#Z r0 INTERTIER 4/0 CABLE LUGS I
'3 Page 4 of 6
DATA SHEET 2 "AS LEFT" PROCMORK PLAN NO.
2403.001 I BATTERY B&K 2Dll.
I BATTERY RACK CELL TO TERMINAL [RECORD RESISTANCE IN PLATE AND TERMINAL PLATE TO IMICRO OHMS FOR LISTED j CABLE CONNECTIONS CONNECTIONS I
I TERM. PLT.-LUG#4 i
I I
I I
I 3'
l TERMINAL PLATE ON CELL # 39 1 TERM. PLT.-LUG#S I
IT0 INTERTIER 4/0 CABLE LUGS I
I I
-1 I
JO I
I I TERM. PLT.-LUG#6 I
PROCEDUREWORK PLAN TITLE:
UNIT 11 2Dll PERFORMANCE TEST ELECTRICAL MAINTENANCE I
I i
1 40~1-TORM.
PLT.
I I
I 1 TERMINAL PLATE TO j z I
I CELL # 40, I
( 40P2-TERM. PLT.
I k
I i
I 1 TERM. pLTg-LuG#l 1
I I
I I TERM. PLT:LUG#2 I
I I
I 1
1 9
1 I TERM. PLT.-LUG#3 PAGE:
39 of 40 C W G E :
008-03-0 I lTERMINAL PLATE ON CELL # 40
/a I
I TO INTERTIER 4 /0 CABLE LUGS TERM. PLT.-LUG#4 I
I Page 5 of 6
DATA SHEET 2 "AS LEFT" PROC,MIORK PLAN NO.
2403.001 Page 6 of 6 BATTERY BANK 2Dll PROCEDUREWORK PLAN TITLE:
UNIT 11 2 D l l PERFORMANCE TEST ELECTRICAL MAINTENANCE BATTEXY RACKCELL TO TEKMINAL 1 RECORD RESISTANCE IN PLATE AND TERMZNAL PLATE TO MICRO OHMS FOR LIST3 PAGE:
40 of 40 CHANGE:
008-03-0 I
I 1 TERMINAL PLATE TO
/ TERM. PLT.-LUG#2 IOVTGOING 250 MCM I
[CABLE LUGS CELL # 58 I
9.0 I
1 I I TERM. PLT:LUG#3 I
I COMMENTS :
Test Equip. and Cal. Due. Date: fiLRO mY /&&
/
Performed by:..........
&-2q-0%
Date Second Person Ver~fier: <%.L k,
-?.a>
Date