Public Meeting Slides, Byron 2003 End-of-Cycle Assessment
ML041190344
Person / Time
Site: Byron  Constellation icon.png
Issue date: 04/21/2004
From:
NRC/RGN-III
To:
References
Download: ML041190344 (19)


Text

Byron Station Byron Station Annual Assessment Meeting Annual Assessment Meeting Reactor Oversight Program - CY 2003 Reactor Oversight Program - CY 2003 Nuclear Regulatory Commission - Region III Nuclear Regulatory Commission - Region III Byron, Illinois Byron, Illinois April 21, 2004 April 21, 2004

Agenda

 Introduction

 Review of Reactor Oversight Process

 National Summary of Plant Performance

 Discussion of Plant Performance Results

 Licensee Response and Remarks

 NRC Closing Remarks

 Break

 NRC available to address public questions

NRC Representatives NRC Representatives

 Ann Marie Stone, Branch Chief

- (630) 829-9729

 Rick Skokowski, Senior Resident Inspector

- (815) 234-5451

 Peter J. Snyder, Resident Inspector

- (815) 234-5451

Region III Organization James Caldwell Regional Administrator Geoffrey Grant Deputy Regional Administrator Steven A. Reynolds Acting Director Division of Reactor Projects Patrick Hiland Acting Deputy Director Cynthia D. Pederson Director Division of Reactor Safety Roy Caniano Deputy Director Ann Marie Stone Branch Chief Regional Specialists Byron Resident Inspectors Rick Skokowski Peter J. Snyder Project Engineer Thomas Tongue

NRC Performance Goals

 Maintain safety and protect the environment

 Enhance public confidence

 Improve effectiveness, efficiency, and realism of processes and decision making

 Reduce unnecessary regulatory burden

Reactor Oversight Process Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas

Examples of Baseline Inspections

 Equipment Alignment

~92 hrs/yr

 Triennial Fire Protection

~200 hrs every 3 yrs

 Operator Response

~125 hrs/yr

 Emergency Preparedness

~80 hrs/yr

 Rad Release Controls

~100 hrs every 2 yrs

 Worker Radiation Protection ~100 hrs/yr

 Corrective Action Program

~200 hrs every 2 yrs

 Corrective Action Case Reviews ~60 hrs/yr

Significance Threshold Performance Indicators Green:

Only Baseline Inspection White:

May increase NRC oversight Yellow:

Requires more NRC oversight Red:

Requires more NRC oversight Inspection Findings Green:

Very Low safety issue White:

Low to moderate safety issue Yellow:

Substantial safety issue Red:

High safety issue

Action Matrix Concept Licensee

Response

Regulatory

Response

Degraded Cornerstone Multiple/Rep.

Degraded Cornerstone Unacceptable Performance Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions

Purpose of Todays Meeting

 A public forum for discussion of the licensees A public forum for discussion of the licensees performance performance

 NRC will address the licensee performance issues NRC will address the licensee performance issues identified in the annual assessment letter identified in the annual assessment letter

 Licensee will respond to the information in the letter Licensee will respond to the information in the letter and inform the NRC of new or existing programs to and inform the NRC of new or existing programs to maintain or improve their performance maintain or improve their performance

National Summary of Plant Performance Status at End of CY 2003 Licensee Response 75 Regulatory Response 22 Degraded Cornerstone 2

Multiple/Repetitive Degraded Cornerstone 3

Unacceptable 0

Total 102*

National Summary

 Performance Indicator Results (at end of CY 2003)

Green 1825 White 15 Yellow 0

Red 0

 Total Inspection Findings (CY 2003)

Green 748 White 9

Yellow 2

Red 1

Byron Inspection Activities (January 1 - December 31, 2003)

 Completed Baseline Inspections - 2000 hours0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br />

  • Routine Integrated Inspections
  • Identification and Resolution of Problems
  • Safety System Design and Performance Capability
  • Security

 Special Team Inspection - Fuel Handling Event

 Unit 1 Refueling Outage

Byron Assessment Results (January 1 - December 31, 2003)

 Unit 1: Licensee Response Column

 All Findings were categorized as very low safety significance (Green)

 All Performance Indicators were within the Green band

 Unit 2: Licensee Response Column

 All Findings were categorized as very low safety significance (Green)

 All Performance Indicators were within the Green band

Byron Inspection Activities (January 1 - December 31, 2004)

 Refueling Outage - Unit 2

 Major team inspections

  • Modification and Safety Evaluation
  • Triennial Fire Protection
  • Maintenance Rule - Biennial
  • Security

Byron Annual Assessment Summary January 1 - December 31, 2003

 Exelon operated Byron Units 1 & 2 in a manner that preserved public health and safety

 All cornerstone objectives were met

 NRC plans baseline inspections at Byron for the remainder of the assessment period

Licensee Response and Remarks

Contacting the NRC

 Report an emergency (301) 816-5100 (call collect)

 Report a safety concern:

(800) 695-7403 Allegation@nrc.gov

 General information or questions www.nrc.gov Select What We Do for Public Affairs

Reference Sources

 Reactor Oversight Process http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html

 Public Electronic Reading Room http://www.nrc.gov/reading-rm.html

 Public Document Room 1-800-397-4209 (Toll Free)