S Richard L. Anderson Vice President - Nuclear Operations PPL Susquehanna, LLC 769 Salem /Boulevard Berwick, PA 18603 Tel. 570.542.3883 Fax 570.542.1504 RLAnderson@pplweb.com I
I
% & I Ig/,
\\ pla
- e vm--
I, PIPb,
TM April 11, 2004 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station OP1-17 WVashington, D.C. 20555 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 and 50-388/NPF-22 PLA- 005745 The March 2004 Monthly Operating Reports for Susquehanna SES Units I and 2 are attached.
Very truly yours, Richard L. Anderson JJHtcmm cc: NRC Region I NRC Sr. Resident Inspector, Mr. S. Hansell NRC Project Manager, Mr. R V. Guzman r'j:;n 3
I'Ll
V OPERATING DATA REPORT DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-387 One 04111/2004 J. J. Hennings (570) 542-3747 1.
2.
3.
4.
OPERATING STATUS Unit Name:
Susquehanna Steam Electric Station (UI)
Reporting Period:
March 2004 Design Electrical Rating (Net MWe):
1115 Maximum Dependable Capacity (Net MWe):
1105 5.
6.
7.
8.
9.
Hours in Reporting Period Number of Hours Reactor Was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)
This Month 744 0
0 0
0 Yr.-to-Date 2,184 1393.4 1392.0 0
1,375.582 Cumulative 182,473 151,878.2 149,631.6 0
153,989,020 NOTES:
To be more consistent with the definitions in NRC Generic Letter 97-02 "Revised Contents of the Monthly Operating Report", SSES is making the following methodology change to Operating Status report. The Net Electrical Generation values that result in a less than Zero total will, from January 2004 forward, be reported as Zero.
However, the cumulative total for prior years will not be adjusted to conform to the current definition of Net Electrical Energy Generated. The new values listed below are valid for the February 2004 report to keep the Yr.-to-Date column correct, and continue with the "Cumulative" column. The following values have been input to the Consolidated Data Entry database for the I' quarter 2004 by SSES station personnel.
Reporting Period:.
Februarv 2004 I
I February '04 l l
Yr.-to-Date l
l Cumulative l 9. l Net Electrical Energy Generated (MWH) l 595,684 1
l 1,375,582 l
153,989,020 l
Page I of I
I UNIT SHUTDOWNS DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-387 One 04/11/2004 J. J. Hennings (570) 542-3747 REPORT MONTH March 2004 No.
Date Type Duration Reason Method of Cause & Corrective Action (Hours) 2 Shutting To Prevent Recurrence Down Reactor 3 1
2128/04 S
48 C
4 Continuation of Planned Refuel Outage.
Summary:
End-Of-Cycle coastdown began January 1,2004, and continued until February 28,2004 when the Unit 1-13 Refueling Outage commenced. The breaker was opened at 00:01 on February 28. The Refueling Outage end date is currently planned for late April.
1.
F. Forced S. Scheduled 2.
Reason:
A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain) 3.
Method:
I -Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other Page I of I
C SUSOUEHANNA STEAM ELECTRIC STATION Docket Number:
50-387
-Completed by:
J. J. Ilennings Date: ' 04111104 iTelephone:
(570) 542-3747
-'Challenges to Main Steam Safety Relief Valves None.
OPERATING DATA REPORT DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 04111/04 J. J. Hennings (570) 542-3747 OPERATING STATUS
- 1. Unit Name:
Susguehanna Steam Electric Station (U2)
- 2.
Reporting Period:
March 2004
- 3.
Design Electrical Rating (Net MWe):
1182
- 4.
Maximum Dependable Capacity (Net MWe):
1140 5.
6.
7.
8.
9.
Hours in Reporting Period Number of Hours Reactor Was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)
This Month 744 744 744 0
871,313 Yr.-to-Date 2,184 2,184 2,184 0
2,517,419 Cumulative 167,713 146,079.8 144,092.6 0
151,283,070 NOTES:
To be more consistent with the definitions in NRC Generic Letter 97-02 "Revised Contents of the Monthly Operating Report", SSES is making the following methodology change to Operating Status report. The Net Electrical Generation values that result in a less than Zero total will, from January 2004 forward, be reported as Zero.
However, the cumulative total for prior years will not be adjusted to conform to the current definition of Net Electrical Energy Generated. No revisions are necessary for Unit 2 data for 2004 1 " Quarter.
Page 1 of I
UNIT SHUTDOWNS 1.
DOCKET NO.
.UNIT DATE COMPLETED BY TELEPHONE 5G-388 Two 04/1 1/04 J. J. Hennings (570) 542-3747 REPORT MONTH March 2004 No.
Date Type Duration Reason Method of Cause & Corrective Action I
(Hours) 2 Shutting to Prevent Recurrence Down Reactor 3
No shutdowns this month.
Summary: There were no power reductions greater than 20% this month.
1.
2.
3.
F. Forced S. Scheduled Reason:
A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)
Method:
I - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other Page I of 1
SUSOUEHANNA STEAM ELECTRIC STATION Docket Number:
50-388 Date:
04/11/2004
~Completed by: J. J. Hennings Telephone:
(570) 542-3747 Challenges to Main Steam Safetv Relief Valves
'None.