Text
N Committed to Nuclear Excellenc Duane Arnold Energy Center Operated by Nuclear Management Company, LLC April 14, 2004 NG-04-0226 TS 5.6.4 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station 0-Pl-17 Washington, DC 20555-0001 DUANE ARNOLD ENERGY CENTER DOCKET 50-331 LICENSE No. DPR-49 MONTHLY OPERATING REPORT Please find enclosed the Duane Arnold Energy Center Monthly Operating Report.
The report has been prepared in accordance with the guidelines of NRC Generic Letter 97-02: uRevised Contents Of The Monthly Operating Report," and distribution has been made in accordance with DAEC Technical Specifications, Section 5.6.4.
This letter makes no new commitments or changes to any existing commitments.
Sincerely, 11 k.
'p.
Site Vice President, Duane Arnold Energy Center CC Regional Administrator, USNRC, Region IlIl Project Manager, USNRC, NRR NRC Resident Inspector (DAEC) itJ'.
- t,;
vo 1.l.i
Enclosure:
OPERATING DATA REPORT S
9 I
t
! ~
.4
,;l
,'?1;
^
- '.s 4
! I.'.
_: Jo t
I I
- - -.1 3277 DAEC Road
- Palo, Iowa 52324-9785 Telephone: 319.851.7611
April 14, 2004 Enclosure to NG-04-0226 Page 1 of 2 OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING
-PERIOD:
50-331 Duane Arnold April 5, 2004 Mike Fairchild (319) 851-7642 March 2004 1.
2.
Design Electrical Rating (MWe)
Maximum Dependable Capacity (MWe-Net) 581.40 565.50
- 3. Number of Hours the Reactor was Critical
- 4. Number of Hours Generator On-line
- 5. Reserve Shutdown Hours
- 6. Net Electrical Energy Generated (MWHrs)
This Month 744.00 744.00 0.00 435,371.50
! Yr-to-Date 2184.00 2184.00 0.00 1,278.710.70 Cumulative 203,862.27 199,469.52 192.80 93,233,986.38 UNIT SHUTDOWNS Method Type F: Forced S:
Scheduled-Method of Shuttin
-Down Cause &
Corrective Action
-Comments--
Duration i(HourslY No.-I Date,
-Reaon1_
A L
'Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain) 2 Method:
I Manual 2
Manual Trip/Scram 3
Automatic Trip/Scram 4
Continuation 5
Other (Explain)
April 14, 2004 Enclosure to NG-04-0226 Page 2 of 2 NARRATIVE
SUMMARY
During the month, departures from full power operation occurred for the following:
1.) On March 13 for High Pressure Coolant Injection system testing.
2.) On March 25 for a load line adjustment.