March 2004 Monthly Operating Report for Cooper
ML041120415
Person / Time
Site: Cooper Entergy icon.png
Issue date: 04/15/2004
From: Jason Christensen
Nebraska Public Power District (NPPD)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, NLS2004053
Download: ML041120415 (5)


Text

Nebraska Public Power District Always there when you need us NLS2004053 April 15,2004 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001

Subject:

Monthly Operating Report for March 2004, Docket No. 50-298 The purpose of this letter is to provide the Cooper Nuclear Station Monthly Operating Report for March 2004. In accordance with the guidance provided by Generic Letter 97-02, this report includes an Operating Data Report and Unit Shutdown Report for the month of March. In accordance with Technical Specification 5.6.4, this report also includes documentation of challenges to the safety/relief valves.

Should you have any comments or require additional information regarding this report, please contact Paul Fleming at (402) 825-2774.

Sincere]),

John Christensen Plant Manager

/cb Enclosure cc: NRC Regional Administrator W. J. Fehrman NRC Senior Resident Inspector W. D. Shanks ANI Library R. K. Edington C. C. Warren J. M. Cline B. Lewis A. L. Dostal G. WV. Griffith J. W. Dutton S. Moffitt R. L. Gumm INPO Records Center Records COOPER NUCLEAR STATION P.O. Box 98 / arownville, NE 68321-0098 Telephone: (402) 825-3811/ Fax: (402) 825-5211

');6q wvw.nppd.com

APPENDIX A OPERATING DATA REPORT DOCKET NO. 050-0298 UNIT NAME Cooper Nuclear Station DATE 411Sf2004 COMPLETED BY Rodrick Wilson TELEPHlONE (402) 825-5135 Reporting Period: March 2004 This Month Yr.-to-Date Cumulative

1. Design Electrical Rating (Net MWe). 778.0 N'A NWA The nominal net electrical output of the unit specified by the utility and used for the purpose of plant design.
2. Maximum Dependable Capacity (Net MWe): 764.0 N'A N!A The gross electrical output as measured at the output terminals of the turbine-generator during the most restrictive seasonal conditions minus the normal station service loads.
3. Number of Hours the Reactor Was Critical. 744.0 2.184.0 201200.3 The total number of hours during the gross hours of the reporting period that the reactor was critical.
4. Number of I fours the Generator Was On Line. 744.0 2184.0 198290.3 (Also called Service )fours). The total number of hours during the gross hours of the reporting period that the unit operated with the breakers closed to the station bus.

The sum of the hours the generator was on line plus the total outage hours should equal the gross hours in the reporting period.

5. Unit Reserve Shutdown Ilours. 0.0 0.0 0.0 The total number of hours during the gross hours of the reporting period that the unit was removed from service for economic or similar reasons but was available for operation.
6. Net Electrical Energy (WIII). 568879.0 1657768.0 134811773.0 The gross electrical output of the unit measured at the output tenninals of the turbine-generator minus the normal station service loads during the gross hours of the reporting period. expressed in mega-watt hours. Negative quantities should not be used.

4/12/2004 e:26 MI

qt APPENDIX B UNIT SHUTDOWNS DOCKET NO. 050-0298 UNIT NAME Cooper Nuclear Station DATE 4/15/2004 COMPLETED BY Rodrick Wilson TELEPHONE (402) 825-5135 REPORT MONTH March 2004 NO. Date F:FORCED Duration(Hou) Reason (D) Itodn (2) CAUSE/CORRECTIVE ACTIONS COMMENTS S: SCHEDULED t .5. 1* 5 1-L .1. .1. 1 J.

SUMMARY

None (1) Reason:

A - Equipment Failure (Explain) n - Maintenance or Test C - Rerueling D

  • Regulatory Restriction E - Operator Training/license Examination F. Administrative G . Operational Error (Explain) 11 - Other (Explain)

(2) Method:

I - Manual 2 - %lanualTrip/Scram 3

  • Automatic Trip/Scram 4 . Continuation S - Other (Explain) 4/12/2004 8:27 M4

APPENDIX C SAFETY/RELIEF V7ALVE CHALLENGES MARCH 2004 There were no challenges to the safety/relief valves during the month of March.

7 -' ' ATTACHMENT 3 LIST OF REGULATORY COMMITMENTS© I Correspondence Number
NLS2004053 The following table identifies those actions committed to by Nebraska Public Power District (NPPD) in this document. Any other actions discussed in the submittal represent intended or planned actions by NPPD. They are described for information only and are not regulatory commitments. Please notify the Licensing & Regulatory Affairs Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.

COMMITTED DATE COMMITMENT OR OUTAGE None

.4

.4 4

.4 4

I PROCEDURE 0.42 l REVISION 14 l PAGE 15 OF 17

Text

Nebraska Public Power District Always there when you need us NLS2004053 April 15,2004 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001

Subject:

Monthly Operating Report for March 2004, Docket No. 50-298 The purpose of this letter is to provide the Cooper Nuclear Station Monthly Operating Report for March 2004. In accordance with the guidance provided by Generic Letter 97-02, this report includes an Operating Data Report and Unit Shutdown Report for the month of March. In accordance with Technical Specification 5.6.4, this report also includes documentation of challenges to the safety/relief valves.

Should you have any comments or require additional information regarding this report, please contact Paul Fleming at (402) 825-2774.

Sincere]),

John Christensen Plant Manager

/cb Enclosure cc: NRC Regional Administrator W. J. Fehrman NRC Senior Resident Inspector W. D. Shanks ANI Library R. K. Edington C. C. Warren J. M. Cline B. Lewis A. L. Dostal G. WV. Griffith J. W. Dutton S. Moffitt R. L. Gumm INPO Records Center Records COOPER NUCLEAR STATION P.O. Box 98 / arownville, NE 68321-0098 Telephone: (402) 825-3811/ Fax: (402) 825-5211

');6q wvw.nppd.com

APPENDIX A OPERATING DATA REPORT DOCKET NO. 050-0298 UNIT NAME Cooper Nuclear Station DATE 411Sf2004 COMPLETED BY Rodrick Wilson TELEPHlONE (402) 825-5135 Reporting Period: March 2004 This Month Yr.-to-Date Cumulative

1. Design Electrical Rating (Net MWe). 778.0 N'A NWA The nominal net electrical output of the unit specified by the utility and used for the purpose of plant design.
2. Maximum Dependable Capacity (Net MWe): 764.0 N'A N!A The gross electrical output as measured at the output terminals of the turbine-generator during the most restrictive seasonal conditions minus the normal station service loads.
3. Number of Hours the Reactor Was Critical. 744.0 2.184.0 201200.3 The total number of hours during the gross hours of the reporting period that the reactor was critical.
4. Number of I fours the Generator Was On Line. 744.0 2184.0 198290.3 (Also called Service )fours). The total number of hours during the gross hours of the reporting period that the unit operated with the breakers closed to the station bus.

The sum of the hours the generator was on line plus the total outage hours should equal the gross hours in the reporting period.

5. Unit Reserve Shutdown Ilours. 0.0 0.0 0.0 The total number of hours during the gross hours of the reporting period that the unit was removed from service for economic or similar reasons but was available for operation.
6. Net Electrical Energy (WIII). 568879.0 1657768.0 134811773.0 The gross electrical output of the unit measured at the output tenninals of the turbine-generator minus the normal station service loads during the gross hours of the reporting period. expressed in mega-watt hours. Negative quantities should not be used.

4/12/2004 e:26 MI

qt APPENDIX B UNIT SHUTDOWNS DOCKET NO. 050-0298 UNIT NAME Cooper Nuclear Station DATE 4/15/2004 COMPLETED BY Rodrick Wilson TELEPHONE (402) 825-5135 REPORT MONTH March 2004 NO. Date F:FORCED Duration(Hou) Reason (D) Itodn (2) CAUSE/CORRECTIVE ACTIONS COMMENTS S: SCHEDULED t .5. 1* 5 1-L .1. .1. 1 J.

SUMMARY

None (1) Reason:

A - Equipment Failure (Explain) n - Maintenance or Test C - Rerueling D

  • Regulatory Restriction E - Operator Training/license Examination F. Administrative G . Operational Error (Explain) 11 - Other (Explain)

(2) Method:

I - Manual 2 - %lanualTrip/Scram 3

  • Automatic Trip/Scram 4 . Continuation S - Other (Explain) 4/12/2004 8:27 M4

APPENDIX C SAFETY/RELIEF V7ALVE CHALLENGES MARCH 2004 There were no challenges to the safety/relief valves during the month of March.

7 -' ' ATTACHMENT 3 LIST OF REGULATORY COMMITMENTS© I Correspondence Number
NLS2004053 The following table identifies those actions committed to by Nebraska Public Power District (NPPD) in this document. Any other actions discussed in the submittal represent intended or planned actions by NPPD. They are described for information only and are not regulatory commitments. Please notify the Licensing & Regulatory Affairs Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.

COMMITTED DATE COMMITMENT OR OUTAGE None

.4

.4 4

.4 4

I PROCEDURE 0.42 l REVISION 14 l PAGE 15 OF 17