MONTHYEARML22041B1072022-02-10010 February 2022 LTR-22-0033-1 Oedo Tom Gurdziel, E-mail Event Number 55734 at Davis Besse, a Matter of Interpretation ML20177A4932020-06-25025 June 2020 Enclosure a - Redacted Owners, Officers, Directors, and Executive Personnel Forms for Energy Harbor Corp., Energy Harbor Nuclear Corp., and Energy Harbor Nuclear Generation LLC ML20008D2232020-01-0808 January 2020 NRC Region I Twitter Feeds 10-1 to 12-31-2019 L-16-092, Information Pertaining to Foreign Ownership, Control, or Influence. Part 4 of 62016-04-22022 April 2016 Information Pertaining to Foreign Ownership, Control, or Influence. Part 4 of 6 ML16132A3962016-04-22022 April 2016 Information Pertaining to Foreign Ownership, Control, or Influence. Part 5 of 6 ML16132A3942016-04-22022 April 2016 Davis-Besse, and Perry - Information Pertaining to Foreign Ownership, Control, or Influence. Part 3 of 6 ML16132A3932016-04-22022 April 2016 Davis-Besse, and Perry - Information Pertaining to Foreign Ownership, Control, or Influence. Part 2 of 6 ML15231A3642015-05-27027 May 2015 FOIA/PA-2014-0204 - Resp 1 - Final, Group a ML12167A0622012-07-16016 July 2012 Enclosure - Davis-Besse 17RFO SG Tube Inspection Tables ML12170B1042012-06-18018 June 2012 0772 - G105 - Conducting Inspections - Workshop #4 Scenario ML12170B1052012-06-18018 June 2012 0772 - G105 - Conducting Inspections - Workshop #5 Scenario ML12200A1832012-06-12012 June 2012 Unit Licensing Basis Seismic Ground Motion Concern ML12056A0522012-03-12012 March 2012 Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML11348A0432011-12-12012 December 2011 Email -- Davis-Besse SB Crack Rc Investigation RFI ML12213A3532011-11-15015 November 2011 Shield Building Laminar Cracking ML12213A3512011-11-10010 November 2011 Containment Shield Building Issue ML12200A1952011-11-0707 November 2011 Shield Building Issue NRC Technical Reviewer Focus Questions ML11301A2392011-10-31031 October 2011 Reference: Wind Resource Estimates Developed by Aws Truepower LLC for Windnavigator ML11301A2352011-10-31031 October 2011 References: Concentrating Solar Resources of the United States ML1126601882011-09-23023 September 2011 NRC 2011 Davis-Besse L-11-165, Enclosure C - Binder 1 of 2, Davis-Besse Nuclear Power Station, Unit No. 1 (DBNPS) References. (Tab a 8 Through T 30)2011-05-27027 May 2011 Enclosure C - Binder 1 of 2, Davis-Besse Nuclear Power Station, Unit No. 1 (DBNPS) References. (Tab a 8 Through T 30) ML11193A1332011-05-27027 May 2011 Enclosure C - Binder 2 of 2, Davis-Besse Nuclear Power Station, Unit No. 1 (Dbnps) References. (Tab H 1 Through Tab H 16) ML11193A1042011-05-27027 May 2011 Enclosure C - Binder 2 of 2, Davis-Besse Nuclear Power Station, Unit No. 1 (Dbnps) References. (Tab H 17 to Tab C 2) ML11227A1962011-05-27027 May 2011 Enclosure C - Binder 1 of 2, Davis-Besse Nuclear Power Station, Unit No. 1 (Dbnps) References. (Tab Am 1 Through a 7) ML11109A0842011-04-15015 April 2011 Attachments B-D, to L-11-107, Reply to Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application ML1016006942010-06-10010 June 2010 G20100238/EDATS: OEDO-2010-0305 - Ltr. Tom Gurdziel, 2.206 - Firstenergy - Davis-Besse - T. Gurdziel Questions ML1017301232010-06-0909 June 2010 Green Ticket Tritium Releases ML1019304602010-03-25025 March 2010 List of Historical Leaks and Spills at Us Commercial Nuclear Power Plants ML0933507512010-01-14014 January 2010 Temporary Instruction 2515/180, Managing Fatigue ML0906500232009-03-0606 March 2009 Safety Culture Policy Statement (Safety & Security) Comments ML0904800182009-02-17017 February 2009 Public Comments Regarding the Safety Culture Policy Statement ML0906404392009-01-28028 January 2009 Enclosure 5: Case Study 1: Structure of TS for Ultrasonic Flow Meters - Meeting Summary of the January 27 & 28 Meeting with Nrc/Tstf ML0829101252008-11-20020 November 2008 ITSB R-Relocated Specifications - to Davis Besse Amendment Beyond Scope Issues ML0829007802008-11-20020 November 2008 ITSB L-Less Restrictive Changes - Attachment to Davis-Besse Amendment Beyond Scope Issues ML0829006832008-11-20020 November 2008 Table A-DOC Attachment - Administrative Changes - to Davis-Besse Amend. ITS with Beyond Scope Issues ML0829006302008-11-20020 November 2008 List of Acronyms to Davis-Besse Amend. Re; ITS with Beyond Scope Issues ML0829101122008-11-20020 November 2008 ITSB M - More Restrictive Changes - to Davis Besse Amendment Beyond Scope Issues ML0824902712008-10-0202 October 2008 List of Acronyms to Davis Besse Draft Amend. ITS Conversion L-08-241, Attachment 1, Applicable Portions of the U.S. Nuclear Regulatory Commission (NRC) and Davis-Besse Nuclear Power Station (DBNPS) Improved. Technical Specification (ITS) Conversion Website, Section 3.5 RAIs2008-08-26026 August 2008 Attachment 1, Applicable Portions of the U.S. Nuclear Regulatory Commission (NRC) and Davis-Besse Nuclear Power Station (DBNPS) Improved. Technical Specification (ITS) Conversion Website, Section 3.5 RAIs ML0803600792008-02-0101 February 2008 Attachment 1- DBNPS Steam Generator Inspections Data ML0802800442008-01-25025 January 2008 Special Inspection Evaluation, Basis for Investigatory Response Decision for a Significant Operational Power Reactor Event ML0732400242007-10-25025 October 2007 Examples of Max Thermal Power License Conditions ML0726301142007-09-14014 September 2007 / P. Paquin Ltr Amendment to Certificate of Compliance No. 9208 for the Model No. 10-142B Package (TAC L24117)/S121170 ML0726303192007-09-14014 September 2007 P. Paquin Ltr Amendment to Certificate of Compliance No. 6574 for the Model No. 3-82B Package (TAC L24116)/ Register User List ML0733801902007-06-27027 June 2007 Meeting Attendees, 6/27/07, Meeting with Firstenergy Nuclear Operating Company Regarding May 14, 2007, Demand for Information ML0634705992006-12-14014 December 2006 Plant Service List ML0535402852005-12-16016 December 2005 Issuance of Conforming Amendments for Bv, Units 1 and 2; Perry, Unit 1 and Davis-Besse, Unit 1 Transfer of Ownership Interests to Fengenco - Amendment 7 to Indemnity Agreement B-79 ML0530704422005-11-0808 November 2005 Proposal to Clean Incore Tunnel and Below Vessel - a Locked High Radiation Area ML0531302012005-04-21021 April 2005 Timeline for Enforcement Actions ML0423002112004-08-0505 August 2004 Submittal of Independent Assessment Plan for the Davis-Besse Nuclear Power Station Operations Performance, Revision 2 2022-02-10
[Table view] |
Text
Evaluation of Corrosion Identified on Several Containment Air Cooler Nuts and Welds On February 11, during a tour of the containment building, the inspectors identified four material condition issues. The licensee initiated condition report (CR) 04-01177, 'Items Identified During Senior NRC Tour of Containment," and documented the issues/resolutions as follows:
- Pressurizer Heater Cables Were Supported By Blue Tie-Wraps: The tie-wraps were removed and cables arranged appropriately by electricians.
- Containment Air Cooler Drain Was Cloacid and Spilling Water: The licensee issued a work order and performed work to clear14f6 clogged line.
- Rust Found on Containment Air Cooler Stainless Steel Header Piping: This issue had been previously identified and documented in CR 03-04638, "Unexpected Observation of Material Used for Containment Air Coolers." The licensee's evaluations of the issue stated the rust was due to surface contamination either during or after fabrication, with the probable source being embedded particles of carbon steel left by commonly used carbon steel cleaning tools such as wire brushes or needle grinders. The licensee concluded that the oxidized layer remained thin and presented no danger of serious degradation, therefore required no additional corrective actions.
- Containment Air Cooler Service Water Tree Support Header Pedestal Bolts Found With Surface Rust: This issue had been previously identified in CR 03-09479, "CAC Service Water Tree Fasteners Corroding." The licensee closed this issue with the following justification: "Design Engineering and the drawings for these bases, specify ASTM A193, Grade B-7 bolting, which is carbon steel. The reason engineering chose the B-7 material in lieu of stainless steel, was for shear strength. Engineering also said that no painting of the bolts was required. No Deficiency exists." %J
/
Subsequent to the questions raised by the inspectors and the initiation of CR 04-01177,.
the licensee initiated further evaluated the containment air cooler bolting issue in CR 04-01212, "Bolts on the Supports for the CAC Piping are Unpainted and Shows Signs of Rust." The evaluation stated that the engineering work request that installed the supports required that all exposed carbon steel and concrete surfaces shall be primed and painted. The resolution of the issue was to initiate a work order [Order 200083336]
to coat the subject bolts in accordance with appropriate specification. This will be accomplished prior to Mode 2.
Although the condition report stated that the work would be accomplished prior to Mode 2, the issue was dispositioned by the RSRB as a post-restart item and the Mode 2 restraint was closed with a due date [for the corrective action of coating the bolts] of March 28, 2004. After discussions with the inspectors regarding the timeliness of this corrective action, the Maintenance Supervisor is currently reassessing the disposition of this corrective action as post-restart.
The inspectors will further evaluate what may be a work performance issue regarding whether or not the engineering work request specifically required the carbon steel bolts to be coated.
The inspectors evaluated the licensee's actions to correct the deficiencies described above and found them to be adequate.
1/
Emergency Preparedness and Security Work Item Backlog Assessment In preparation for this inspection, the inspectors reviewed the Special Inspection Report, dated 12/22/03, from the Indian Point 2 Station, which discussed three green findings associated with backup power supplies to their emergency response facilities.
The inspectors requested a listing of backlog items associated with Emergency Preparedness and Security issues. The licensee provided the inspectors with a list of condition reports and corrective actions for each area. The breakdown of the Emergency Preparedness issues consisted of:
- 15 condition reports still under evaluation;
- 71 condition reports with open corrective actions; and
- 107 open corrective actions.
The breakdown of the Security issues consisted of:
- 22 condition reports still under evaluation;
- 46 condition reports with open corrective actions; and
- 80 open corrective actions.
Through discussions with licensee staff and review of the open condition reports and corrective actions, the inspectors did not identify any outstanding equipment issues that would significantly challenge the licensee's performance in the areas of Emergency Preparedness or Security.