ML041110922
| ML041110922 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 04/13/2004 |
| From: | Peterson N Detroit Edison |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| GL-97-002, NRC-04-0019 | |
| Download: ML041110922 (2) | |
Text
Fermi 2 6400 North Dixie Hwy., Newport, MI 48166 Detroit Edison Generic Letter 97-02 April 13, 2004 NRC-04-0019 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555
Reference:
Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43
Subject:
Monthly Operating Status Report for March 2004 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for March 2004. This report includes the Operating Data Report and Summary of Unit Shutdowns identified in NRC Generic Letter 97-02 and Fermi 2 Technical Specification 5.6.4.
Should you have any questions or require additional information, please contact me at (734) 586-4258.
Sincerely Norman K. Peterson Manager - Nuclear Licensing Enclosure cc: R. J. Aben, Jr.
D. P. Beaulieu E. R. Duncan M. A. Ring M. V. Yudasz, Jr.
NRC Resident Office Regional Administrator, Region m Region ml A DTE Energy Company
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 50-341 Fermi 2 April 13, 2004 Kevin Burke (734) 586-5148
\\._.,
REPORTING PERIOD: March 2004
- 1.
Design Electrical Rating (MWe-Net) 1,150.00
- 2.
Maximum Dependable Capacity (Mwe-Net) 1Q089.00 This Month Year-to-Date Cumulative
- 3.
Number of Hours the Reactor Was Critical
- 4.
Number of Hours Generator On-line
- 5.
Reserve Shutdown Hours
- 6.
Net Electrical Energy Generated (MWH) 744 744 0.00 820,296 2,184 2,184 0.00 2,407,919 110,080 106,193 0.00 107,031,486 UNIT SHUTDOWNS No.
Date Type Duration Reason (1)
Method of Cause and F: Forced (Hours)
Shutting Corrective Action S: Scheduled Down (2)
Comments N/A
SUMMARY
- The plant operated at full power during the month (excluding small power reductions for required surveillance testing) with the following exception:
Commenced planned power reduction to 65 percent on March 26, 2004, for scram time testing, bypass valve testing, and scheduled maintenance. Power was restored to 100 percent on March 28, 2004.
(1) Reason:
A Equipment Failure (Explain)
B Maintenance or Test C Refueling D Regulatory Restriction E Operator Training and License Examination F Administration G Operational Error (Explain)
H Other (Explain)
(2) Method:
1 Manual 2 Manual Trip/Scram 3 Automatic Trip/Scram 4 Continuation 5 Other (Explain)