ML041110370
| ML041110370 | |
| Person / Time | |
|---|---|
| Site: | Watts Bar |
| Issue date: | 04/15/2004 |
| From: | Pace P Tennessee Valley Authority |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML041110370 (5) | |
Text
Tennessee Valley Authority, Post Office Box 2000. Spring City, Tennessee 37381-2000 APR 15 2004 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D. C. 20555 Gentlemen:
In the Matter of Tennessee Valley Authority
)
Docket No.50-390 WATTS BAR NUCLEAR PLANT (WBN) -
MARCH 2004 MONTHLY OPERATING REPORT Provided in the enclosure is the Monthly Operating Report for March 2004 as required by WBN Technical Specification Section 5.9.4.
There are no regulatory commitments in this submittal and should there be questions regarding this letter, please telephone me at (423) 365-1824.
S 1y, P.. Pace Manager, Site Licensing and Industry Affairs Enclosure Monthly Operating Report -
March 2004 cc:
See page 2 gig Ate
U.S. Nuclear Regulatory Commission Page 2 APR 1 5 2004 cc (Enclosure):
NRC Resident Inspector Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381 Ms. Margaret H. Chernoff, Project Manager U.S. Nuclear Regulatory Commission MS 08G9 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303
ENCLOSURE TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT (WBN)
MONTHLY OPERATING REPORT MARCH 2004 UNIT 1 DOCKET NUMBER 50-390 LICENSE NUMBER NPF-90 E-1
OPERATING DATA REPORT Docket No.
Unit Name:
Date:
Completed By:
Telephone:
Reporting Period:
50-390 WBN Unit 1 April 12, 2004 P. P. Salkeld (423) 365-3635 March 2004
- 1. Design Electrical Rating (MWe-Net):
- 2.
Maximum Dependable Capacity (MWe-Net):
1155 1121
- 3.
Number of Hours Reactor was Critical
- 4.
Hours Generator On-Line
- 5.
Unit Reserve Shutdown Hours
- 6.
Net Electrical Energy Generated (MWVh)
Month 744 744 0.0 861,019 Year-to-Date 2,148 2,142 Cumulative 62,912 62,594 0.0 69,480,386 0.0 2,464,702 E-2
UNIT SHUTDOWNS DOCKET NO:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-390 WBN-1 April 12,2004 P. P. Salkeld (423) 365-3635 REPORT PERI01
.......... N.
. o.........te
~~~.
. h.
.h....
N.
.. ;..'.;.-t'; '..
- B,.
.: ev........
. t. g. e
. g 2:
.,eeg
- ..N...
':B
.--;t :
): March 2004 y:peT.. :Dii s
oration
[ours;)' I X
N....
.{.{,
e.. ; I M:.etho0d;.
of.:{'.'. sN L
icen.see' E;.
vent.
System'.
'..Mode4.h.
- Cornponent"
'-"BBCod e 4 N C.ause and
.orrectve Actionn: t Preve ec....rrence.....
.ii B:.':':::':..
..::':'B':.':;;;:;
n,.
........................;;;.a;;;........ :.
''.':;:::.?:.::B:::::................
N u ~st ; g
.;.;;;...a;-.;;...
B::
.,- f :
.B.1.
N/A N/A N/A N/A N/A N/A N/A N/A N/A The unit operated at or near 100 percent power for the entire month of March 2004.
1 F: Forced S: Scheduled 2 Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 Method 1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation Outage 5-Other (Explain) 4Instructions for Preparation of Data Entry sheets for Licensee Event Report (LER)
(NUREG - 1022)
Summary:
The unit operated at or near 100 percent power for the entire month of March 2004.
E-3