February 2004 Monthly Operating Report for Millstone, Units 2 & 3
ML041110023
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 03/12/2004
From: Sarver S
Dominion Nuclear Connecticut
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
04-151
Download: ML041110023 (8)


Text

-~Dominion-Dominion Nuclear Connecticut, Inc.

Millstone Power Station Rope Ferry Road Waterford, CT 06385 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 MAR I 2 2004 Serial No.

MPS Lic/web Docket Nos.04-151 RO 50-336 50-423 DPR-65 NPF-49 License Nos.

DOMINION NUCLEAR CONNECTICUT, INC.

MILLSTONE POWER STATION UNITS 2 AND 3 FEBRUARY 2004 MONTHLY OPERATING REPORT In accordance with the reporting requirements of Technical Specification 6.9.1.7 for Millstone Unit No. 2, and Technical Specification 6.9.1.5 for Millstone Unit No. 3, enclosed are the Monthly Operating Reports for the month of February 2004. contains the Millstone Unit No. 2 Monthly Operating Report and contains the Millstone Unit No. 3 Monthly Operating Report.

If you should have any questions regarding this submittal, please contact Mr. David W. Dodson at (860) 447-1791, extension 2346.

Very truly yours, Step en P. Sarver, Director Nuclear Station Operations and Maintenance

Serial No.04-151 DNC Millstone Power Station Units 2 and 3 February 2004 Monthly Operating Report Page 2 of 2 Attachments:

2 Commitments made in this letter: None.

cc:

U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 Mr. V. Nerses Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8C2 Rockville, MD 20852-2738 Mr. S. M. Schneider NRC Senior Resident Inspector Millstone Power Station

w February 2004 Monthly Operating Report for Millstone Unit 2 Millstone Power Station Units 2 and 3 Dominion Nuclear Connecticut, Inc. (DNC)

OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE EXTENSION 50-336 Millstone 2 03/01/2004 S. Stark (860) 447-1791 4419 OPERATING STATUS

1. Unit Name:

Millstone Unit No. 2

2.

Reporting Period:

February 2004

3.

Licensed Thermal Power (MWt):

2700.0

4. Design Electrical Rating (Net MWe):

883.5

5.

Maximum Dependable Capacity (Net MWe) 877.7

6. If Changes Occur in Capacity Ratings (Items Number 3 through 5)

N/A Since Last Report, Give Reasons:

This Month Year-to-Date Cumulative

7.

Number of Hours Reactor Was Critical 696.0 1440.0 159466.3

8.

Hours Generator On-Line 696.0 696.0 153675.8

9.

Unit Reserve Shutdown Hours 0.0 0.0 468.2

10.

Net Electrical Energy Generated (MWH) 616605.9 1275953.7 126153529.5

I UNIT SHUTDOWNS DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE EXTENSION 50-336 Millstone 2 03/01/2004 S. Stark (860) 447-1791 4419 REPORTING MONTH: February 2004 NO.

DATE TYPE' DURATION REASON2 METHOD OF STHUTrING CAUSE I CORRECTIVE ACTIONS (HOURS)DOWN REACTOR 3 COWIuTENTS There were no unit shutdowns during the month of February 2004.

2

~2 F:

Forced Reason:

Method:

S:

Scheduled A - Equipment Failure (Explain)

I - Manual B - Maintenance or Test 2 - Manual Trip C - Refueling 3 - Automatic Trip D - Regulatory Restriction 4 -Continued from previous month E - Operator Training / License Examination 5 -Other (Explain)

F - Administrative G Operational Error (Explain) 11-Other (Explain)

February 2004 Monthly Operating Report for Millstone Unit 3 Millstone Power Station Units 2 and 3 Dominion Nuclear Connecticut, Inc. (DNC)

OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE EXTENSION 50-423 Millstone 3 03/01/2004 K. Cook (860) 447-1791 6572 OPERATING STATUS

1. Unit Name:

Millstone Unit No. 3

2.

Reporting Period:

FEBRUARY 2004

3.

Licensed Thermal Power (MWt):

3411.0

4. Design Electrical Rating (Net MWe):

1153.6

5.

Maximum Dependable Capacity (Net MWe) 1130.5

6.

If Changes Occur in Capacity Ratings (Items Number 3 through 5)

N/A Since Last Report, Give Reasons:

This Month Year-to-Date Cumulative

7.

Number of Hours Reactor Was Critical 696 1440.0 112544.7

8. Hours Generator On-Line 696 1440.0 110815.1
9.

Unit Reserve Shutdown Hours 0.0 0.0 0.0

10. Net Electrical Energy Generated (MWH) 803812.3 1662897.4 121510101.7 OPERATING

SUMMARY

The unit operated at 100% power throughout the month of February 2004.

UNIT SHUTDOWNS DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE EXTENSION 50-423 Millstone 3 03/01/04 K. Cook (860) 447-1791 6572 REPORTING MONTH:

FEBRUARY 2004 NO.

DATE TYPE DURATION REASON2 METHOD OF SHUTTING CAUSE/ CORRECTIVE ACTIONS (HOURS)DOWN REACTOR 3 COMMENTS There were no unit shutdowns in February 2004.

2 3

F:

Forced Reason:

Method:

S:

Scheduled A - Equipment Failure (Explain)

I - Manual B - Maintenance or Test 2 - Manual Trip C - Refueling 3 - Automatic Trip D - Regulatory Restriction 4 - Continued from previous month E - Operator Training I License Examination 5 - Other (Explain)

F-Administrative G - Operational Error (Explain)

Il - Other (Explain)