Initial Walkthrough JPM 4200.0104
ML041070485
Person / Time
Site: Clinton Constellation icon.png
Issue date: 01/06/2004
From: Griffin M, Pickley T, Ryan P
Exelon Generation Co, Exelon Nuclear
To:
Office of Nuclear Reactor Regulation
References
-RFPFR, 50-461/04-301, JPM 4200.0104, Rev 03 50-461/04-301
Download: ML041070485 (14)


Text

CLINTON POWER STATION Job Performance Measure DC Load Shedding During a Station Blackout per CPS No. 4200.01C002 JPM Number: 04200.0104 Revision Number: 03 Date: 10/17/03 Developed By: T. Pickley 7/7/03 Instructor Date Validated By: M. Griffin 10/17/03 SME or Instructor Date Review By: P. K. Ryan

_7/28/03 Operations Representative Date

Page 2 of 10 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 through 11 below.

1. Task description and number, JPM description and number are identified.
2. Knowledge and Abilities (K/A) references are included.
3. Performance location specified. (in-plant, control room, or simulator)
4. Initial setup conditions are identified.
5. Initiating and terminating cues are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:

Procedure Rev. _____ Date _____________

9. Pilot test the JPM:
a. verify cues both verbal and visual are free of conflict, and
b. ensure performance time is accurate.
10. If the JPM cannot be performed as written with proper responses, then revise the JPM.
11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.

SME/Instructor Date SME/Instructor Date SME/Instructor Date

CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 04200.0104 REVISION: 03 Page 3 of 10 Revision Record (Summary)

1. Revision 00, This is a new JPM
2. Revision 01, Unknown
3. Revision 02, Unknown
4. Revision 03, New format

CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 04200.0104 REVISION: 03 Page 4 of 10 Operators Name: SSN:

Job

Title:

NLO RO SRO STA SRO Cert JPM Title/Number: 04200.0104, DC Load Shedding During a Station Blackout Revision Number: 03 Task Number and

Title:

04200.0104, DC Load Shedding During a Station Blackout Suggested Testing Environment: Plant Actual Testing Environment: I Simulator Plant Control Room Testing Method: Simulate Faulted: No I Perform Alternate Path: No Time Critical: No Estimated Time to Complete: 20 _minutes Actual Time Used: minutes

References:

CPS No. 4200.01C002 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes

No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:

Satisfactory Unsatisfactory Comments:

Evaluators Name: __________________________

Evaluators Signature:

Date:

CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 04200.0104 REVISION: 03 Page 5 of 10 READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues.

When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

SIMULATOR SET-UP CONDITIONS:

N/A TASK STANDARDS:

Complete DC load shedding in accordance with CPS 4200.01C002.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

None PROCEDURAL/

REFERENCES:

CPS No. 4200.01C002, DC LOAD SHEDDING DURING A SBO.

EVALUATOR INSTRUCTIONS:

Amplifying cues are provided within the JPM steps.

INITIAL CONDITIONS AND INITIATING CUE:

The plant has experienced a Station Blackout. The Station Blackout is expected to last more than one hour. You are directed to perform DC load shedding on Division 1in accordance with CPS No. 4200.01C002, DC LOAD SHEDDING DURING A SBO.

START TIME:

CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 04200.0104 REVISION: 03 Page 6 of 10

==============================================================

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

==============================================================

Note to Examiner If asked: Circuit 13, Prevents Starting DG and Circuit 32, Prevents Starting Div. 1 ECCS should be opened.

PERFORMANCE STEPS 1.

AT DC MCC 1A (1DC13E), OPEN CIRCUIT BREAKER: CKT 7 Emerg Ltg Cab 164, 1LL64E Standard Circuit breaker 7 is simulated being placed in the OFF position.

CUE Comments SAT UNSAT Comment Number 2.

AT DC MCC 1A (1DC13E), OPEN CIRCUIT BREAKER: CKT 13 DG 1A Control Pnl, 1PL12JA Standard Circuit breaker 13 is simulated being placed in the OFF position.

CUE Comments SAT UNSAT Comment Number

CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 04200.0104 REVISION: 03 Page 7 of 10 3.

AT DC MCC 1A (1DC13E), OPEN CIRCUIT BREAKER: CKT 18 Opt Isol Cab, 1PL56JA & 1PL56JB Standard Circuit breaker 18 is simulated being placed in the OFF position.

CUE Comments SAT UNSAT Comment Number 4.

AT DC MCC 1A (1DC13E), OPEN CIRCUIT BREAKER: CKT 26 Control Panel 1H13-P661B, LPCS Control Power Standard Circuit breaker 26 is simulated being placed in the OFF position.

CUE Comments SAT UNSAT Comment Number 5.

AT DC MCC 1A (1DC13E), OPEN CIRCUIT BREAKER: CKT 30 Control Panel 1H13-P601, Position for 1E12-R611A/R612A, R609A/B Standard Circuit breaker 30 is simulated being placed in the OFF position.

CUE Comments SAT UNSAT Comment Number

CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 04200.0104 REVISION: 03 Page 8 of 10 6.

AT DC MCC 1A (1DC13E), OPEN CIRCUIT BREAKER: CKT 32 Control Panel 1H13-P661, RHR A Control Power Standard Circuit breaker 32 is simulated being placed in the OFF position.

CUE Comments SAT UNSAT Comment Number 7.

AT DC MCC 1A (1DC13E), OPEN CIRCUIT BREAKER: CKT 33 Control Panel 1H13-P661, RPS A Control Power Standard Circuit breaker 33 is simulated being placed in the OFF position.

CUE Comments SAT UNSAT Comment Number 8.

AT DC MCC 1A (1DC13E), OPEN CIRCUIT BREAKER: CKT 36 Control Pnl, 1G36-P002 Standard Circuit breaker 36 is simulated being placed in the OFF position.

CUE Comments SAT UNSAT Comment Number

CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 04200.0104 REVISION: 03 Page 9 of 10 STOP TIME:

TERMINATING CUES:

Division 1 DC load shedding has been completed in accordance with CPS No. 4200.01C002.

K/A REFERENCE NUMBERS Importance Rating K/A SYSTEM NUMBER K/A NUMBER RO SRO Generic 2.1.20 4.3 4.2 Generic 2.1.30 3.9 3.4 295004 AA1.01 3.3 3.4

CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 04200.0104 REVISION: 03 Page 10 of 10 INITIATING CUE The plant has experienced a Station Blackout. The Station Blackout is expected to last more than one hour. You are directed to perform DC load shedding on Division 1 in accordance with CPS No. 4200.01C002, DC LOAD SHEDDING DURING A SBO.