ML041050143

From kanterella
Jump to navigation Jump to search
Transmittal of Procedure Action Request for Rev 4 to C OP 608, Communication Radiopaging Enrs Daily Weekly Operability Test
ML041050143
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 03/30/2004
From:
Dominion Nuclear Connecticut
To:
Document Control Desk, NRC/FSME
References
Download: ML041050143 (2)


Text

TI'"Z To Facility Address From Date/Time

DOCUMENT CONTROL DESK
MP Department : 806
NUC REGULATORY COMMISSION (0140)

DOCUMENT CONTROL DESK WASHINGTON, DC 20555 PASSPORT DOCUMENT TRANSMITTAL Page:

1 Ie

NDS
03/30/04 10:36 CONT DOCUMENTS Trans No.
000057316 Total Items: 00001 Transmittal Group Id: 04090JEP-3 Item Facility Type Sub Document Number/ Title Sheet Revision Doc Date Copy #

Media Copies

01 COMMUNICATION RADIOPAGING ENRS DAILY WEEKLY OPERABILITY TEST Please check the appropriate response and return form to NDS Bldg 475/3 Millstone Power Station or Fax to 860-440-2057.

All documents received.

Documents noted above not received (identify those not received).

I no longer require distribution of these documents.

Date:

Signature:

0

2/27103 Approval Date Procedure Action Request 3107/03 Effective Date Document No.:

C OP 608 Writer:

Chris Hollaway Rev. No. l Minor Rev.

Initiator:

Chris Hollaway 004 05

Title:

Communication Radiopaging ENRS Daily Weekly Operability Test For New Documents Document is QA LI DH Title

[ Revision

[ 0 Minor Revision 0 Cleanup Revision El Biennial Review

[l Cancel El Void (Do Not Use)

[l Expire 0

l Superceded By C SP 600.4 4 Comments:

El Administrative Correction FLS:

This document is being replaced by C SP 600.4 Associated A/Rs:

Reviews Print Sign Date Department L

I 1

1-_

_1

°l_

II 1__

1 1

L I

I_

Ucensing Basis / RCDO (50.59 Screen Req. El Yes Eli No)

L Tech Independent LIO_

Validatlon None 1111 Field -Use LI Simulated Performance -

[J Table Top and LIcomparison MP-05-DC-SAP01-004 Use MP-05-DC-SAP01-004 Walk-through (minimum of Print rSign T Date l

Dept Coordinator T

Member E]

I I

I Training:

M None O Nuclear Training O Briefing E Familiarization C SQR Review and Approval n SORC Review and Approval Depariment Head Review and A proval Approval 6

ADisproval I

MIA

/

WA 3

(1 P

epartment Head Sign/Date (1) Department Head Approval Sign (1) SQR lgnlDate

,).

(2) SORC Meeting Number (2) Depa ent Head Approval S_

(3) SORC Approval Sign A

rovaiDate:

6.J' Effective Date:

4/(

A; I iZ(6 0 MP-05-DC-FAPO1.1-005 I,

Rev. 001 l

Page I of