Slides from 04/08/04 Meeting Between Us NRC Oversight Panel & Firstenergy Nuclear Operating Co
ML041040069
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 04/08/2004
From:
NRC/RGN-III
To:
References
Download: ML041040069 (1)


Text

Public Meeting Between USNRC Oversight Panel and FirstEnergy Nuclear Operating Company April 8, 2004

2 Davis-Besse Oversight Panel - Public Meeting April 2004 PURPOSES OF THIS MEETING

  • Inform the Public of the NRCs Oversight Panel Activities
  • Discuss Licensees Assessment of Startup Activities
  • Discuss Licensees Planned Activities Going Forward

3 Davis-Besse Oversight Panel - Public Meeting April 2004 AGENDA

  • Introduction and Opening Remarks
  • Discussion of NRC Activities
  • Licensee Presentation on Startup Activities and Planned Activities Going Forward
  • Adjourn NRC meeting with FENOC

<break>

  • Public Comments and Questions of NRC
  • Adjourn Meeting

4 Davis-Besse Oversight Panel - Public Meeting April 2004 SIGNIFICANT NRC ACTIVITIES

  • Held 2 Public Meetings:

- February 12th, at Camp Perry

  • Discuss Inspection Results from the Follow-up Restart Readiness Assessment Team Inspection
  • Discuss Inspection Results from the Management and Human Performance Follow-up Inspection

- February 12th, at Camp Perry

  • Allow the Licensee to State the Basis for Their Request to Restart Reactor Operations at the Davis-Besse Nuclear Power Station

5 Davis-Besse Oversight Panel - Public Meeting April 2004 SIGNIFICANT NRC ACTIVITIES (cont.)

  • Restart Decision Made March 8th by Region III Regional Administrator

- Concurrence of Director NRR & Deputy EDO

  • Basis for Restart Decision

- Licensee Performance is Adequate for Safe Restart and Operation

- Methodical MC 0350 Process Used

  • Restart Checklist - All 31 Items Closed
  • Confirmatory Action Letter - All 6 Issues Completed

- Commitments in Licensees Integrated Report to Support Restart Confirmed in Restart Approval Letter

6 Davis-Besse Oversight Panel - Public Meeting April 2004 SIGNIFICANT NRC ACTIVITIES (cont.)

  • NRC Issued Confirmatory Order with Restart Approval

- Ensures Effective Assessment and Sustained Safe Performance

- Requires Independent Outside Assessment of Operations, Corrective Actions, Engineering, and Safety Culture

- Requires Mid-cycle Upper and Lower Head Reactor Pressure Vessel Inspections

7 Davis-Besse Oversight Panel - Public Meeting April 2004

  • Restart Notification

- Notified Senators and Congressmen

- Governor of Ohio Notified Personally

- Federal Agencies (FEMA, DOJ, DHS) Notified

- Other State and Local Officials Informed

- Teleconferenced Press Conference SIGNIFICANT NRC ACTIVITIES (cont.)

8 Davis-Besse Oversight Panel - Public Meeting April 2004

  • Coverage of Startup Activities

- Initiated Around-the-Clock Inspection Oversight March 9, 2004

  • Minimum of 2 Inspectors per Shift, Including Senior Resident/Senior License Examiner -24 hours per day

- Relaxed to 2 Shifts During Feedwater System Extended Maintenance Outage (March 17-24, 2004)

- Resumed on March 25, 2004, Prior to Second Mode 2, Continuing Through Full Power SIGNIFICANT NRC ACTIVITIES (cont.)

9 Davis-Besse Oversight Panel - Public Meeting April 2004 INSPECTION AND OVERSIGHT CY 2004

- Davis-Besse Oversight Panel will Continue to Assess Licensees Performance and Guide NRC actions

- Additional Resident Inspector at Site for Two Years

- Special Inspections to Confirm Licensee Actions Required by the Order and Licensee Commitment Implementation and Effectiveness

- Enhanced Inspections in Areas Monitored By NRC Performance Indicators

- Appropriate Enforcement Action Will be Taken Following Completion of All Investigation Activities

10 Davis-Besse Oversight Panel - Public Meeting April 2004 ONGOING NRC ACTIVITIES

  • Review of Operational Performance
  • Resident Inspections
  • Next NRC Public Meeting - May 11th (Location TBD)

11 Davis-Besse Oversight Panel - Public Meeting April 2004 PUBLIC MEETING U.S. NUCLEAR REGULATORY COMMISSION OAK HARBOR, OHIO April 8th, 2004, 6:00 pm EDT Purpose of Meeting:

Inform the Public of the NRCs Oversight Panel Activities

12 Davis-Besse Oversight Panel - Public Meeting April 2004 GOALS

  • Brief Public with Results of Afternoon Meeting with FENOC
  • Receive Comments and Questions From Public To ensure we hear all comments, please limit comments or questions to 5 minutes each. We will follow the format from previous meetings where we start with local members of the public.