St. Lucie Nuclear Plant Annual Assessment Meeting Reactor Oversight Program - CY 2003 Nuclear Regulatory Commission - Region II Jensen Beach, Florida March 22, 2004
Purpose of Todays Meeting
! A public forum for discussion of the licensees performance
! NRC will address the licensee performance issues identified in the annual assessment letter
! Licensee will be given the opportunity to respond to the information in the letter and inform the NRC of new or existing programs to maintain or improve their performance
Agenda
! Introduction
! Review of Reactor Oversight Process
! National Summary of Plant Performance
! Discussion of Plant Performance Results
! Licensee Response and Remarks
! NRC Closing Remarks
! Break
! NRC available to address public questions
Region II Organization Director Division of Reactor Safety Harold Christensen Deputy Director Charles Casto Son Ninh Steve Rudisail Project Engineers Thierry Ross Steve Sanchez St. Lucie Resident Inspectors Branch Chief Joel Munday Director Division of Reactor Projects Len Wert Deputy Director Victor McCree Regional Administrator Loren Plisco Deputy Regional Administrator Luis Reyes
NRC Performance Goals
! Maintain safety and protect the environment
! Enhance public confidence
! Improve effectiveness, efficiency, and realism of processes and decision making
! Reduce unnecessary regulatory burden
Reactor Oversight Process Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas
Examples of Baseline Inspections
! Equipment Alignment
~92 hrs/yr
! Triennial Fire Protection
~200 hrs every 3 yrs
! Operator Response
~125 hrs/yr
~80 hrs/yr
! Rad Release Controls
~100 hrs every 2 yrs
! Worker Radiation Protection ~100 hrs/yr
! Corrective Action Program ~200 hrs every 2 yrs
! Corrective Action Case Reviews ~60 hrs/yr
Significance Threshold Performance Indicators Green:
Only Baseline Inspection White:
May increase NRC oversight Yellow:
Requires more NRC oversight Red:
Requires more NRC oversight Inspection Findings Green:
Very Low safety issue White:
Low to moderate safety issue Yellow:
Substantial safety issue Red:
High safety issue
National Summary
! Performance Indicator Results (at end of CY 2003)
Green 1825
White 15
Yellow 0
Red 0
! Total Inspection Findings (CY 2003)
Green 748
White 19
Yellow 2
Red 4
Action Matrix Concept Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions Licensee
Response
Regulatory
Response
Degraded Cornerstone Multiple/Rep.
Degraded Cornerstone Unacceptable Performance
National Summary of Plant Performance Status at End of CY 2003 Licensee Response 75 Regulatory Response 22 Degraded Cornerstone 2
Multiple/Repetitive Degraded Cornerstone 3
Unacceptable 0
- Davis-Besse is in IMC 0350 process Total Units 102*
St. Lucie Nuclear Plant Inspection Activities (Jan 1 - Dec 31, 2003)
! 4844 hours0.0561 days <br />1.346 hours <br />0.00801 weeks <br />0.00184 months <br /> of inspection related activities
! Engineering inspections
! Emergency preparedness inspection
! Licensed operator exam inspection
! Triennial fire protection inspection
! Fire protection followup inspection
! Radiation protection inspections
! Reactor pressure vessel head and head penetration nozzles inspection
! Unit 2 refueling outage
St. Lucie Nuclear Plant Assessment Results (Jan 1 - Dec 31, 2003)
! Plant performance was in the Licensee Response Column of the NRCs Action Matrix for the first three quarters but transitioned into the Regulatory Response Column in the fourth quarter
! All inspection findings were classified as very low safety significance (Green)
! All PIs were Green with one exception - The Unplanned Scrams per 7000 Critical Hours PI crossed the White threshold due to a reactor trip that occurred in the fourth quarter
St. Lucie Nuclear Plant Annual Assessment Summary January 1-December 31, 2003
! Florida Power and Light Company operated St. Lucie Nuclear Plant in a manner that preserved public health and safety
! All cornerstone objectives were met
! NRC plans baseline inspections at St. Lucie Nuclear Plant for the remainder of the assessment period
St. Lucie Nuclear Plant Inspection Activities (Jan 1 - Dec 31, 2004)
! Supplemental Inspection 95001
! Engineering inspections
! Security inspections
! Reactor pressure vessel head and head penetration nozzle inspections
! Reactor containment sump blockage inspection
! Spent fuel material control and accountability inspection
! Emergency preparedness inspection
! Fire protection inspection
! PI&R inspection
! Radiation protection inspection
! Licensed operator exam inspection
! Units 1 and 2 refueling outages
Licensee Response and Remarks William Jefferson Vice President, St. Lucie Nuclear Plant Florida Power and Light Company
Contacting the NRC
! Report an emergency
(301) 816-5100 (call collect)
! Report a safety concern:
(800) 695-7403
Allegation@nrc.gov
! General information or questions
www.nrc.gov
Select What We Do for Public Affairs
Reference Sources
! Reactor Oversight Process
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html
! Public Electronic Reading Room
http://www.nrc.gov/reading-rm.html
! Public Document Room
1-800-397-4209 (Toll Free)