RIC 2004: Emergent Technical Issues, Session T-11 Bottom Mounted Instrumentation Experience Tom Jordan, VP Engineering & Technical Services RIC 2004: Emergent Technical Issues, Session T-11 Bottom Mounted Instrumentation Experience Tom Jordan, VP Engineering & Technical Services STP Nuclear Operating Company March 11, 2004 STP Nuclear Operating Company March 11, 2004

2 Bottom Mounted Instrumentation (BMI) Leakage Unit 1 Bottom Mounted Instrumentation (BMI) Leakage Unit 1

 On April 12th leakage identified via boric acid walk down inspections

 Total boric acid crystal for both penetrations = 153mg



 On April 12th leakage identified via On April 12th leakage identified via boric acid walk down inspections boric acid walk down inspections



 Total boric acid crystal for both Total boric acid crystal for both penetrations = 153mg penetrations = 153mg

3 BMI Paradigms BMI Paradigms

 Nuclear safety first

 Think 40 years not 40 days

 Pace the team

 Industry key stakeholder involvement

 Demonstrate conservative operational decision making

 Establish Detailed Communication Plan

 Nuclear safety first

 Think 40 years not 40 days

 Pace the team

 Industry key stakeholder involvement

 Demonstrate conservative operational decision making

 Establish Detailed Communication Plan

4 STP BMI Penetration #1 As Found STP BMI Penetration #1 As Found

5 Examination Scope Examination Scope

 Ultrasonic examination (UT) from penetration tube ID

 Enhanced visual exam of J-groove weld surface

 Volumetrically interrogate vessel base metal for wastage

 Eddy current examination (ET) from penetration tube ID

 ET of J-groove weld surface

 Profilometry [tube inside roundness / ovality]

 Borescope [tube inside visual] examinations

 Helium tests

 Metallurgical analyses of removed nozzle remnants

 Boat sample analyses



 Ultrasonic examination (UT) from penetration tube ID Ultrasonic examination (UT) from penetration tube ID



 Enhanced visual exam of J Enhanced visual exam of J--groove weld surface groove weld surface



 Volumetrically interrogate vessel base metal for wastage Volumetrically interrogate vessel base metal for wastage



 Eddy current examination (ET) from penetration tube ID Eddy current examination (ET) from penetration tube ID



 ET of J ET of J--groove weld surface groove weld surface



 Profilometry Profilometry [tube inside roundness /

[tube inside roundness / ovality ovality))



 Borescope Borescope [tube inside visual] examinations

[tube inside visual] examinations



 Helium tests Helium tests



 Metallurgical analyses of removed nozzle remnants Metallurgical analyses of removed nozzle remnants



 Boat sample analyses Boat sample analyses

6 Leak Axial Crack in Nozzle and/or Weld PWSCC Nozzle and/or Weld Low-Cycle Fatigue Nozzle or Weld PWSCC Nozzle and/or Weld Fabrication Flaw Over-Stress Nozzle and/or Weld Crack Initiation Crack Propagation Consequences STP Unit 1 BMI Flaw Investigation July 8, 2003 Results Investigation Results Investigation Results

7 Permanent Half-Nozzle Repair Permanent Half-Nozzle Repair

8 Completed Repair Completed Repair

9 Future Inspections BMI Commitments

 Both Units: Boric Acid Walkdown Inspection (VT)

 Unit 1:

- Volumetric (UT)/Enhanced (VT) all penetrations

- Phased Array - (UT) of 1 or 46 (Inspection for Corrosion)

 Unit 2:

- Boric Acid Walkdown Inspection (VT)

- Volumetric (UT)

10 Future Inspections Reactor Head Penetrations Both Units

 Bare Metal Visual

 Volumetric Examinations Material Reliability Program (MRP) Recommended Bare Metal Visual Inspection of Safe Ends

- RV Hot/Cold Legs

- Przr Surge

- Pzr Safety,Relief(3),Spray Nozzles

11 Alloy 600 Life Cycle Management

 Identify Locations

 Perform Risk Assessment/Life Cycle Management Study for Strategic Direction

 Contingency Plans

 Perform Inspections

12 BMI Summary BMI Summary

 Demonstrated long term operational decision making

 Created new technology

 Employed industry best expertise

 Strong teamwork and safety culture provided the foundation for our success



 Demonstrated long term operational Demonstrated long term operational decision making decision making



 Created new technology Created new technology



 Employed industry best expertise Employed industry best expertise



 Strong teamwork and safety culture Strong teamwork and safety culture provided the foundation for our success provided the foundation for our success