Technical Specification, Revise TS 3.5.1 to Incorporate TS Task Force (TSTF) Traveler 318
ML040920506
Person / Time
Site: Cooper Entergy icon.png
Issue date: 03/31/2004
From: Michelle Honcharik
NRC/NRR/DLPM/LPD4
To:
References
TAC MC0693
Download: ML040920506 (3)


Text

ECCS - Operating 3.5.1 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM 3.5.1 ECCS - Operating LCO 3.5.1 Each ECCS injection/spray subsystem and the Automatic Depressurization System (ADS) function of six safety/relief valves shall be OPERABLE.

APPLICABILITY: MODE1, MODES 2 and 3, except high pressure coolant injection (HPCI) and ADS valves are not required to be OPERABLE with reactor steam dome pressure < 150 psig.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One low pressure A.2 Restore low pressure 7 days ECCS injection/spray ECCS injection/spray subsystem inoperable. subsystem(s) to I OPERABLE status.

OR One LPCI pump in both LPCI subsystems inoperable.

B. Required Action and B.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A not AND met.

B.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> C. HPCI System C.1 Verify by administrative 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable. means RCIC System is OPERABLE.

AND C.2 Restore HPCI System 14 days to OPERABLE status.

(continued)

Cooper 3.5-1 Amendment No. +78, 203

ECCS - Operating 3.5.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME D. HPCI System D.1 Restore HPCI System 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> inoperable. to OPERABLE status.

OR AND D.2 Restore low pressure 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Condition A entered. ECCS injection/spray subsystem to OPERABLE status.

E. One ADS valve E.1 Restore ADS valve to 14 days inoperable. OPERABLE status.

F. One ADS valve F.1 Restore ADS valve to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> inoperable. OPERABLE status.

AND OR Condition A entered. F.2 Restore low pressure 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> I ECCS injection/spray subsystem to OPERABLE status.

G. Required Action and G.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition C, D, AND E, or F not met.

G.2 Reduce reactor steam 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> OR dome pressure to

< 150 psig.

Two or more ADS valves inoperable.

(continued)

Cooper 3.5-2 Amendment No. +i8, 203

ECCS - Operating 3.5.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME H. Two or more low H.1 Enter LCO 3.0.3. Immediately pressure ECCS injection/spray subsystems inoperable for reasons other than Condition A. I OR HPCI System and one or more ADS valves inoperable.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5.1.1 Verify, for each ECCS injection/spray 31 days subsystem, the piping is filled with water from the pump discharge valve to the injection valve.

(continued)

Cooper 3.5-3 Amendment No. +78, 203