MONTHYEARML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23066A2212023-03-0707 March 2023 Velan, Inc. - Revised Part 21 Notification Re Butterfly Valves Found to Have a Number of Fasteners Loose ML23038A0192023-02-0606 February 2023 Curtiss-Wright Part 21 Notification for Qualtech Np Supplied Eaton TMR5 Timing Relays ML22307A0602022-11-0303 November 2022 EN 56200 - Fairbanks Morse Re Basic Component Which Fails to Comply or Contains a Defect ML22301A1742022-10-28028 October 2022 Global Nuclear Fuel Americas, LLC (GNF) - Part 21 60-Day Interim Report Notification: GNF3 Raised Water Rod (SC-22-04 Rt) ML21322A0512021-10-27027 October 2021 Paragon Energy Solutions, LLC, P21-09282021, Rev. 0, Final Notification of a Deviation with Inverter Assembly (Model NLI-072034-CSI-K-5-A) ML21260A0072021-09-0909 September 2021 Ametek Solidstate Controls, Notification of Potential Defect - 10CFR Part 21 Report Re Omron Timer Relay ML20366A0472020-11-18018 November 2020 Curtiss-Wright 10 CFR Part 21 Notification for SF-1154 Hydraulic Fluid Batch 17BLVS293 ML20049A0752020-02-11011 February 2020 C&D Technologies, Inc. -10 CFR Part 21 Evaluation Regarding Container Failure in KCR-07 Batteries ML19347A4262019-12-10010 December 2019 General Atomics - Reportable Occurrence Under 10CFR21: Reported Failure in Analog High Range Radiation Monitor (RP-2C) 0CAN101902, CFR Part 21 Notification, Ite/Gould Relay2019-10-30030 October 2019 CFR Part 21 Notification, Ite/Gould Relay ML19317D0932019-10-25025 October 2019 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10 CFR21-0127, Rev. 0, Emd Fuel Injectors - Seized Plunger and Bushing ML19253A0532019-08-29029 August 2019 Azz Nuclear - Report of Potential 1O CFR Part 21, Eaton Size 1 and 2 A200 Series Starters/Contactors ML19120A1062019-04-17017 April 2019 Interim Report of Potential 10 CFR Part 21, Eaton Size 1 and 2 A200 Series Starters/Contactors ML19080A0592019-03-0808 March 2019 Interim Report of Potential 10CFR Part 21, Eaton A200 Series Starters/Contactors ML19053A5002019-02-0101 February 2019 Sor, Inc. Part 21 Notification of Deviation Sor R-Series Housing with Terminal Block ML19002A2042018-12-21021 December 2018 to Engine Systems, Inc., Part 21 Report Re Emd Fuel and Soakback Pumps - Potentially Undertorqued Cover Bolts ML18354A7422018-12-0404 December 2018 Engine Systems, Inc., Submittal of 1OCFR21 Reporting of Defects and Non-Compliance - Report No. 1OCFR21-0123, Rev. 0 - Emo Fuel and Soakback Pumps - Potentially Undertorqued Cover Bolts ML18081A1192018-03-15015 March 2018 Rosemount Nuclear Instruments, Inc., Submittal of Notification Under 10 CFR Part 21 for Certain Model 1154 and Model 1154 Serles H Pressure Transmitters and 01154-0153-0002 Amplifier Circuit Card Assemblies ML17286A0242017-10-11011 October 2017 Part 21 on Siemens 5-3AF-GER-350-1200-78 & 5-3AF-GEU-350-1200-78 Circuit Breakers ML17194A8252017-07-11011 July 2017 Part 21 Report Re Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge Connections ML17179A3782017-06-0707 June 2017 TE Connectivity - Part 21 Transfer of Information TE-023 ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML17026A4142017-01-20020 January 2017 C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling ML17019A3512017-01-10010 January 2017 Submittal of 10CFR21 Reporting of Defects and Non-Compliance Rev. 0, Emo Fuel Injector ML17006A0112016-12-13013 December 2016 Part 21 Notification - Defective Safety-Related Relays Supplied by TE Connectivity ML16313A0622016-10-18018 October 2016 C&D Technologies, Inc. - 10 CFR Part 21 Evaluation Regarding Terminal Welding Failure in 3DCU-9 Batteries ML16294A2642016-10-18018 October 2016 Part 21 Report - Defective Current to Pressure Transducers ML16281A2712016-09-30030 September 2016 Part 21 - Safety Related Component Welding by an Unqualified Welder ML16243A4752016-08-26026 August 2016 Part 21 Safety Related Component Welding by an Unqualified Welder ML16209A0502016-07-13013 July 2016 Part 21 - Furmanite Nuclear Grade Leak Seal Material FSC-N-1B ML16188A3742016-06-30030 June 2016 Part 21 - Inadequate Swaging and Adherence of Silicone O-Ring and Silicone PAD Soft Seat Main Disc and Pilot Disc Assemblies ML16126A1112016-04-29029 April 2016 National Technical Systems (Nts) Request for Extension, for Potential Part 21 on Safety Clip, Siemens Part Number 401-158 ML16125A3602016-04-26026 April 2016 Part 21 - Hydraulic Snubber Seal Material Deviation Interim Report ML16112A2102016-03-14014 March 2016 National Technical Systems - Potential Part 21 on Siemens 401-158 Safety Clip, Per Wolf Creek, Salem, and Arkansas Nuclear One ML15288A1992015-10-0909 October 2015 Part 21 Interim Report - Potential Defect on P/N 535-601 Moore Industries Milliamp Modules ML15223B2642015-08-0606 August 2015 Part 21 Report - Notification of Deviation Regarding Hk Circuit Breaker Pivot Pin ML15211A4962015-07-24024 July 2015 Part 21 - Actuator Shaft Did Not Meet Dimensional Requirements ML15103A2442015-04-0606 April 2015 Part 21 Report - Deviation of Hk Circuit Breaker Close Latch Spring ML15049A4582015-02-0606 February 2015 Thermo Gamma-Metrics, LLC - Part 21 Report Regarding Shutdown Margin Monitor Environmental Qualification Noncompliance ML15022A6502015-01-20020 January 2015 Letter from Steven R. Eisenberg USNRC 10CFR Part 21 Notification ML14351A3082014-12-16016 December 2014 10 CFR Part 21 Notification for a Defect in LOCA Analyses for B&W Plants ML14337A0952014-11-25025 November 2014 Part 21 - Defect in LOCA Analysis for B&W Plants ML14274A0522014-09-22022 September 2014 Final Report 10CFR Part 21 Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries, Revision 1 - Original Letter Did Not Include the List of Affected Utilities ML14265A0492014-09-12012 September 2014 Amendment to Part 21 Report from Abb, Inc Re Deviation of K-Line Circuit Secondary Close Latch (Event #50371) ML14259A3892014-09-0808 September 2014 Part 21 - Failure to Meet Specified Irradiation During Testing of Coated Test Panels ML14237A1212014-08-15015 August 2014 Notification of Potential Part 21 Re Notice of Deviation Regarding K-Line Circuit Breaker Secondary Close Latch ML14210A0102014-07-23023 July 2014 Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot Valve ML14204A7072014-07-23023 July 2014 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Unseating of Valve Spring on SSPV 2023-09-06
[Table view] |
Text
FAIRBANKS MORSE 701 White Avenue Beloit, Wisconsin 53511 Tel: 608.364.8424 Fax: 608.364.8417 Ted.stevensonafairbanksmorse.com March 25, 2004 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555
Subject:
Roots Blower on OP Engines On March 23, 2004, Fairbanks Morse Engine evaluation determined a potential safety hazard exists foirbliweris(P/N16609294)6If-OP-engines.It is-possible that-the aluminum rotors can slip on the steel shaft and cause rotor-to-rotor or rotor-to-housing contact which could cause blower failure and inability of engine to perform its safety function.
The defect was caused by improper cleaning of the shaft prior to casting the rotor onto the shaft. This causes an inadequate bond and allows the aluminum rotor to move axially on the steel shaft. Sample testing of rotors has found this condition to exist to varying degrees on approximately 75% of rotors produced between 1998 and 2003.
(4) blowers were shipped to nuclear utilities that may be affected:
Utility Site Blower SIN Exelon Limerick (RB813A, RB3871, RB816)
Entergy ANO-2 (RB814)
To date, no engine failures have been experienced as a result of this problem.
However, the potential exists.-All slipped rotors -have been found during routine maintenance inspections. This condition has been found to manifest itself within a low number of hours of operation. Therefore, the longer the rotors run and maintain proper clearance, the less likely they are to be affected by this condition.
The affected utilities will be notified to evaluate inspection results and replace as necessary.
Sincerely, Todd Collins Manager, QA an ErPro Industries company
-- FAIRBANKS MORSE A 701 White Avenue Beloit. Wisconsin 53511 Tel: 608.364.8424 Fax: 608.364.8417 Ted.stevenson@fairbanksmorse.com March 25, 2004 Entergy Operations, Inc PO Box 31995 Jackson, MS 39286-1995 Attention:..Manager,.Operating Experience M-ECH-595
Subject:
IOCFR21 Attached please find notification made to the NRC for items shipped to ANO on PO POR98090.
Sincerely, Todd Collins Manager, Quality Assurance an EnPro Industries company
FAIRBANKS MORSE I 0IrdluiI e Q
701 White Avenue Beloit Wisconsin 53511 Tel: 608.364.8424 Fax: 608.364.8417 Ted.stevenson@fairbanksmorse.con March 25, 2004 Exelon Nuclear Manager- Licensing Section Correspondence Control Desk PO Box 160
_--.-Kennett Square,.PAJ19348-
Subject:
IOCFR21 Attached please find notification made to the NRC for items shipped to Limerick.
The (3) orders affected are:
90 167610 REL 348495 90 167610 REL 348425 90 167610 REL 348293 Sincerely, Todd Collins
-Manager, Quality-Assuranca -