ML040910425
| ML040910425 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 03/23/2004 |
| From: | Salas P Tennessee Valley Authority |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML040910425 (1) | |
Text
I Tennessee Valley Authority, Post Office Box 2000, Soddy-Daisy, Tennessee 37384-2000 Confidential information submitted under 10 CFR 2.390(a)(4)
March 23, 2004 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C. 20555 10 CFR 50.54(p)
Gentlemen:
In the Matter of Tennessee Valley Authority
)
Docket Nos. 50-327 50-328 SEQUOYAH NUCLEAR PLANT (SQN)
UNITS 1 AND 2 -
SECURITY PERSONNEL TRAINING AND QUALIFICATION PLAN (TQP), REVISION 24 This revision to the SQN TQP is being submitted pursuant to 10 CFR 50.54(p).
This revision changes the physical fitness qualification test for armed response personnel.
Because of the confidential nature of the enclosure, pertaining to the physical protection of the plant, it is requested that the information contained herein be withheld from public disclosure in accordance with 10 CFR 2.390(a)(4),
as clarified by 10 CFR 2.390(d) (1).
If you have any questions concerning this matter, please telephone me at (423) 843-7170 or J. D. Smith at (423 43-6672.
edASalasas Liensi and Industry Affairs Manager Enclosure cc: See page 2 55 PWrted on NcOW paer