Telephone Summary Between U.S. Nuclear Regulatory Commission (NRC) Staff and Dominion Nuclear Connecticut, Inc. Representatives to Discuss Millstone Power Station, Units 2 and 3 License Renewal Applications - Telecon Summary - Drawings
ML040900469
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 03/30/2004
From: Arrighi R
NRC/NRR/DRIP/RLEP
To:
Arrighi RJ, NRR/DRIP/RLEP, 301-415-3936
References
Download: ML040900469 (6)


Text

March 30, 2004 LICENSEE:

Dominion Nuclear Connecticut, Inc. (DNC)

FACILITY:

Millstone Power Station (Millstone)

SUBJECT:

TELEPHONE

SUMMARY

BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION (NRC) STAFF AND DOMINION NUCLEAR CONNECTICUT, INC. REPRESENTATIVES TO DISCUSS THE MILLSTONE POWER STATION, UNITS 2 AND 3 LICENSE RENEWAL APPLICATIONS On March 3, 2004, the NRC staff (the staff) and representatives from DNC held a telephone conference (telecon) to discuss the drawings submitted with the Millstone Unit 2 and Unit 3 License Renewal Applications (LRA) dated January 20, 2004. The staff questioned the licensee whether the submitted license renewal drawings depict the boundaries for components in-scope of license renewal. The submitted licensee renewal drawings are marked as "components subject to aging management review."

The applicant informed the staff that the submitted licensee renewal drawings depict components subject to AMR. The applicant further stated that the boundaries on the drawings are the same for the boundaries for components in-scope of license renewal. The staff will formally submit this question as a request for additional information to the applicant.

DNC has had an opportunity to review and comment on this summary.

/RA/

Russell Arrighi, Project Manager License Renewal Section A License Renewal and Environmental Impacts Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket Nos.: 50-336 and 50-423

Enclosure:

As stated cc w/encl: See next page

March 30, 2004 LICENSEE:

Dominion Nuclear Connecticut, Inc. (DNC)

FACILITY:

Millstone Power Station (Millstone)

SUBJECT:

TELEPHONE

SUMMARY

BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION (NRC) STAFF AND DOMINION NUCLEAR CONNECTICUT, INC. REPRESENTATIVES TO DISCUSS THE MILLSTONE POWER STATION, UNITS 2 AND 3 LICENSE RENEWAL APPLICATIONS On March 3, 2004, the NRC staff (the staff) and representatives from DNC held a telephone conference (telecon) to discuss the drawings submitted with the Millstone Unit 2 and Unit 3 License Renewal Applications (LRA) dated January 20, 2004. The staff questioned the licensee whether the submitted license renewal drawings depict the boundaries for components in-scope of license renewal. The submitted licensee renewal drawings are marked as "components subject to aging management review."

The applicant informed the staff that the submitted licensee renewal drawings depict components subject to AMR. The applicant further stated that the boundaries on the drawings are the same for the boundaries for components in-scope of license renewal. The staff will formally submit this question as a request for additional information to the applicant.

DNC has had an opportunity to review and comment on this summary.

/RA/

Russell Arrighi, Project Manager License Renewal Section A License Renewal and Environmental Impacts Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket Nos.: 50-336 and 50-423

Enclosure:

As stated cc w/encl: See next page DISTRIBUTION:

Accession No: ML040900469 C:\\ORPCheckout\\FileNET\\ML040900469.wpd OFFICE PM:RLEP:DRIP LA:RLEP:DRIP SC:RLEP:DRIP NAME RArrighi MJenkins SLee DATE 03/29/2004 03/29/2004 03/30/2004 OFFICIAL RECORD COPY

DISTRIBUTION:Summary of Telecon with DNC Re: Drawing clarification,Dated:March 30, 2004 Accession No: ML040900469 HARD COPY RLEP RF J. Eads R. Arrighi E-MAIL:

PUBLIC J. Craig D. Matthews F. Gillespie C. Grimes RidsNrrDe E. Imbro G. Bagchi K. Manoly W. Bateman J. Calvo R. Jenkins P. Shemanski J. Fair S. Black B. Boger D. Thatcher R. Pettis G. Galletti C. Li M. Itzkowitz R. Weisman M. Mayfield A. Murphy S. Smith (srs3)

S. Duraiswamy Y. L. (Renee) Li RLEP Staff V. Nerses C. Marco C. ODaniell LIST OF PARTICIPANTS FOR TELEPHONE CONFERENCE TO DISCUSS THE MILLSTONE POWER STATION, UNITS 2 AND 3 LICENSE RENEWAL APPLICATION MARCH 3, 2004 Telecon Participants PARTICIPANTS AFFILIATION Russell Arrighi NRC Chang Li NRC David Shum NRC Bill Corbin DNC Bill Watson DNC Paul Aitken DNC Dan Prelewicz ISL

Millstone Power Station, Units 2 and 3 cc:

Lillian M. Cuoco, Esquire Senior Counsel Dominion Resources Services, Inc.

Rope Ferry Road Waterford, CT 06385 Edward L. Wilds, Jr., Ph.D.

Director, Division of Radiation Department of Environmental Protection 79 Elm Street Hartford, CT 06106-5127 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 First Selectman Town of Waterford 15 Rope Ferry Road Waterford, CT 06385 Mr. P. J. Parulis Manager - Nuclear Oversight Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385 Mr. W. R. Matthews Senior Vice President - Nuclear Operations Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385 Mr. John Markowicz Co-Chair Nuclear Energy Advisory Council 9 Susan Terrace Waterford, CT 06385 Mr. Evan W. Woollacott Co-Chair Nuclear Energy Advisory Council 128 Terrys Plain Road Simsbury, CT 06070 Senior Resident Inspector Millstone Power Station c/o U.S. Nuclear Regulatory Commission P. O. Box 513 Niantic, CT 06357 Mr. G. D. Hicks Director - Nuclear Station Safety and Licensing Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385 Ms. Nancy Burton 147 Cross Highway Redding Ridge, CT 00870 Mr. William D. Meinert Nuclear Engineer Massachusetts Municipal Wholesale Electric Company Moody Street P.O. Box 426 Ludlow, MA 01056 Mr. J. Alan Price Site Vice President Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385 Mr. Chris L. Funderburk Director, Nuclear Licensing and Operations Support Dominion Resources Services, Inc.

Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 Mr. David W. Dodson Licensing Supervisor Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385

Millstone Power Station, Units 2 and 3 cc:

David R. Lewis Shaw Pittman, LLC 2300 N. Street N.W.

Washington, DC 20037 Mr. S. E. Scace Assistant to the Site Vice President Dominion Nucler Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385 Mr. M. J. Wilson Manager - Nuclear Training Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385 Mr. A. J. Jordan, Jr.

Director - Nuclear Engineering Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385 Mr. S. P. Sarver Director - Nuclear Station Operations and Maintenance Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385 Mr. Charles Brinkman, Director Washington Operations Nuclear Services Westinghouse Electric Company 12300 Twinbrook Pkwy, Suite 330 Rockville, MD 20852 Mr. William D. Corbin Director - Nuclear Projects Department Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 Mr. William R. Watson, Jr.

Supervisor - License Renewal Project Building 475/5 Millstone Power Station Rope Ferry Road Waterford, CT 06385 Judy Liskov, Assistant Director Waterford Public Library 49 Rope Ferry Road Waterford, Connecticut 06385-2806 Mildred Hodge, Director Three Rivers Community College Thames River Campus 574 New London Turnpike Norwich, Connecticut 06360 Mr. David A. Christian Senior Vice President and Chief Nuclear Officer Dominion Nuclear Connecticut, Inc.

Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711