ML040890968

From kanterella
Jump to navigation Jump to search
Re Rescheduling of Safeguards Inspections
ML040890968
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 03/25/2004
From: Creed J
Division of Reactor Safety III
To: O'Connor W
Detroit Edison
References
Download: ML040890968 (6)


Text

March 25, 2004 Mr. William OConnor, Jr.

Vice President Nuclear Generation Detroit Edison Company 6400 North Dixie Highway Newport, MI 48166

SUBJECT:

RESCHEDULING OF FERMI 2 SAFEGUARDS INSPECTIONS

Dear Mr. OConnor:

This letter confirms rescheduling of our safeguards baseline inspection activity. The enclosure to our March 4, 2004, letter titled, Fermi Inspection/Activity Plan, identified a safeguards baseline inspection to be conducted April 12 - 16, 2004. This inspection (with two inspectors) has been rescheduled for July 19 - 23, 2004. The inspection will address IP 71130.01, Access Authorization, IP 71130.02, Access Control, Sections 02.01; 02.08; and 04 of IP 71130.08, Fitness For Duty Program, and IP 71151, Performance Indicator Verification. The change in schedule was coordinated with Mr. J. Korte of your staff.

If you have any question regarding the above changes to the safeguards inspection schedule, please contact me at (630) 829-9857.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

James R. Creed Safeguards Program Manager Division of Reactor Safety Docket No. 50-341 License No. NPF-43 See Attached Distribution

W. OConnor cc: N. Peterson, Manager, Nuclear Licensing D. Pettinari, Corporate Legal Department Compliance Supervisor R. Whale, Michigan Public Service Commission L. Brandon, Michigan Department of Environmental Quality Monroe County, Emergency Management Division Planning Manager, Emergency Management Division MI Department of State Police

March 25, 2004 Mr. William OConnor, Jr.

Vice President Nuclear Generation Detroit Edison Company 6400 North Dixie Highway Newport, MI 48166

SUBJECT:

RESCHEDULING OF FERMI 2 SAFEGUARDS INSPECTIONS

Dear Mr. OConnor:

This letter confirms rescheduling of our safeguards baseline inspection activity. The enclosure to our March 4, 2004, letter titled, Fermi Inspection/Activity Plan, identified a safeguards baseline inspection to be conducted April 12 - 16, 2004. This inspection (with two inspectors) has been rescheduled for July 19 - 23, 2004. The inspection will address IP 71130.01, Access Authorization, IP 71130.02, Access Control, Sections 02.01; 02.08; and 04 of IP 71130.08, Fitness For Duty Program, and IP 71151, Performance Indicator Verification. The change in schedule was coordinated with Mr. J. Korte of your staff.

If you have any question regarding the above changes to the safeguards inspection schedule, please contact me at (630) 829-9857.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

James R. Creed Safeguards Program Manager Division of Reactor Safety Docket No. 50-341 License No. NPF-43 See Attached Distribution DOCUMENT NAME: C:\ORPCheckout\FileNET\ML040890968.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII RIII RIII NAME GPirtle:tr MRing GPirtle for JCreed DATE 03/25/04 03/25/04 03/25/04 OFFICIAL RECORD COPY

W. OConnor cc: N. Peterson, Manager, Nuclear Licensing D. Pettinari, Corporate Legal Department Compliance Supervisor R. Whale, Michigan Public Service Commission L. Brandon, Michigan Department of Environmental Quality Monroe County, Emergency Management Division Planning Manager, Emergency Management Division MI Department of State Police ADAMS Distribution:

LXR1 DFT HKC RidsNrrDipmIipb GEG HBC SJC4 DRPIII DRSIII PLB1 JRK1