March 26, 2004 Mr. T. Palmisano Site Vice President Monticello Nuclear Generating Plant Nuclear Management Company, LLC 2807 West County Road 75 Monticello, MN 55362-9637
SUBJECT:
RESCHEDULING OF MONTICELLO SAFEGUARDS INSPECTIONS
Dear Mr. Palmisano:
This letter confirms rescheduling of our safeguards baseline inspection activity. The enclosure to our March 4, 2004, letter titled, Monticello Inspection/Activity Plan, identified a safeguards baseline inspection IP 71130.01, Access Authorization, to be conducted October 18 - 22, 2004. This inspection (with two inspectors) has been rescheduled for April 5 - 9, 2004, and will be conducted at the Nuclear Management Company (NMC) corporate headquarters in Hudson, Wisconsin. This change in schedule was coordinated with Mr. Randy Cleveland of the NMC corporate staff.
Additionally, an onsite safeguards baseline inspection (with two inspectors) was scheduled to be completed October 18 - 22, 2004. This inspection is now scheduled to be conducted June 7 - 11, 2004. The inspection will address IP 71130.02, Access Control, Sections 02.01, 02.08, and 04 of IP 71130.08, Fitness-for-Duty Program, and IP 71151, Performance Indicator Verification. The change in schedule was coordinated with Mr. T. Gallagher of your staff.
If you have any question regarding the above changes to the safeguards inspection schedule, please contact me at (630) 829-9857.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
James R. Creed Safeguards Program Manager Division of Reactor Safety Docket No. 50-263 License No. DPR-22 See Attached Distribution
T. Palmisano cc:
J. Cowan, Executive Vice President and Chief Nuclear Officer Manager, Regulatory Affairs J. Rogoff, Vice President, Counsel, and Secretary Nuclear Asset Manager, Xcel Energy, Inc.
Commissioner, Minnesota Department of Health R. Nelson, President Minnesota Environmental Control Citizens Association (MECCA)
Commissioner, Minnesota Pollution Control Agency D. Gruber, Auditor/Treasurer, Wright County Government Center Commissioner, Minnesota Department of Commerce Manager - Environmental Protection Division Minnesota Attorney Generals Office
March 26, 2004 Mr. T. Palmisano Site Vice President Monticello Nuclear Generating Plant Nuclear Management Company, LLC 2807 West County Road 75 Monticello, MN 55362-9637
SUBJECT:
RESCHEDULING OF MONTICELLO SAFEGUARDS INSPECTIONS
Dear Mr. Palmisano:
This letter confirms rescheduling of our safeguards baseline inspection activity. The enclosure to our March 4, 2004, letter titled, Monticello Inspection/Activity Plan, identified a safeguards baseline inspection IP 71130.01, Access Authorization, to be conducted October 18 - 22, 2004. This inspection (with two inspectors) has been rescheduled for April 5 - 9, 2004, and will be conducted at the Nuclear Management Company (NMC) corporate headquarters in Hudson, Wisconsin. This change in schedule was coordinated with Mr. Randy Cleveland of the NMC corporate staff.
Additionally, an onsite safeguards baseline inspection (with two inspectors) was scheduled to be completed October 18 - 22, 2004. This inspection is now scheduled to be conducted June 7 - 11, 2004. The inspection will address IP 71130.02, Access Control, Sections 02.01, 02.08, and 04 of IP 71130.08, Fitness-for-Duty Program, and IP 71151, Performance Indicator Verification. The change in schedule was coordinated with Mr. T. Gallagher of your staff.
If you have any question regarding the above changes to the safeguards inspection schedule, please contact me at (630) 829-9857.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
James R. Creed Safeguards Program Manager Division of Reactor Safety Docket No. 50-263 License No. DPR-22 See Attached Distribution DOCUMENT NAME: ML040860153.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII RIII NAME GPirtle:tr GWright for BBurgess JCreed DATE 03/25/04 03/26/04 03/26/04 OFFICIAL RECORD COPY
T. Palmisano cc:
J. Cowan, Executive Vice President and Chief Nuclear Officer Manager, Regulatory Affairs J. Rogoff, Vice President, Counsel, and Secretary Nuclear Asset Manager, Xcel Energy, Inc.
Commissioner, Minnesota Department of Health R. Nelson, President Minnesota Environmental Control Citizens Association (MECCA)
Commissioner, Minnesota Pollution Control Agency D. Gruber, Auditor/Treasurer, Wright County Government Center Commissioner, Minnesota Department of Commerce Manager - Environmental Protection Division Minnesota Attorney Generals Office ADAMS Distribution:
WDR DFT LMP RidsNrrDipmIipb GEG HBC SXB3 DRPIII DRSIII PLB1 JRK1