March 26, 2004 Mr. Mark Peifer Site Vice-President Duane Arnold Energy Center Nuclear Management Company, LLC 3277 DAEC Road Palo, IA 52324
SUBJECT:
RESCHEDULING OF DUANE ARNOLD ENERGY CENTER SAFEGUARDS INSPECTIONS
Dear Mr. Peifer:
This letter confirms rescheduling of our safeguards baseline inspection activity. The enclosure to our March 4, 2004, letter titled, Duane Arnold Energy Center Inspection/Activity Plan, identified a safeguards baseline inspection to be conducted June 7 - 11, 2004. This inspection (with two inspectors) has been rescheduled for October 18 - 22, 2004. The inspection will address IP 71130.01, Access Authorization, IP 71130.02, Access Control, Sections 02.01, 02.08, and 04 of IP 71130.08, Fitness-for-Duty Program, and IP 71151, Performance Indicator Verification. The change in schedule was coordinated with Mr. B. Kindred of your staff.
If you have any question regarding the above changes to the safeguards inspection schedule, please contact me at (630) 829-9857.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
James R. Creed Safeguards Program Manager Division of Reactor Safety Docket No. 50-331 License No. DPR-49 See Attached Distribution
M. Peifer cc:
E. Protsch, Executive Vice President -
Energy Delivery, Alliant; President, IES Utilities, Inc.
C. Anderson, Senior Vice President, Group Operations J. Cowan, Executive Vice President and Chief Nuclear Officer J. Bjorseth, Plant Manager S. Catron, Manager, Regulatory Affairs J. Rogoff, Vice President, Counsel, & Secretary B. Lacy, Nuclear Asset Manager Chairman, Linn County Board of Supervisors Chairperson, Iowa Utilities Board The Honorable Charles W. Larson, Jr.
Iowa State Senator D. McGhee - Department of Public Health
March 26, 2004 Mr. Mark Peifer Site Vice-President Duane Arnold Energy Center Nuclear Management Company, LLC 3277 DAEC Road Palo, IA 52324
SUBJECT:
RESCHEDULING OF DUANE ARNOLD ENERGY CENTER SAFEGUARDS INSPECTIONS
Dear Mr. Peifer:
This letter confirms rescheduling of our safeguards baseline inspection activity. The enclosure to our March 4, 2004, letter titled, Duane Arnold Energy Center Inspection/Activity Plan, identified a safeguards baseline inspection to be conducted June 7 - 11, 2004. This inspection (with two inspectors) has been rescheduled for October 18 - 22, 2004. The inspection will address IP 71130.01, Access Authorization, IP 71130.02, Access Control, Sections 02.01, 02.08, and 04 of IP 71130.08, Fitness-for-Duty Program, and IP 71151, Performance Indicator Verification. The change in schedule was coordinated with Mr. B. Kindred of your staff.
If you have any question regarding the above changes to the safeguards inspection schedule, please contact me at (630) 829-9857.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
James R. Creed Safeguards Program Manager Division of Reactor Safety Docket No. 50-331 License No. DPR-49 See Attached Distribution DOCUMENT NAME: ML040860136.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII RIII RIII NAME GPirtle:tr GWright for BBurgess JCreed DATE 03/25/04 03/25/04 03/26/04 OFFICIAL RECORD COPY
M. Peifer cc:
E. Protsch, Executive Vice President -
Energy Delivery, Alliant; President, IES Utilities, Inc.
C. Anderson, Senior Vice President, Group Operations J. Cowan, Executive Vice President and Chief Nuclear Officer J. Bjorseth, Plant Manager S. Catron, Manager, Regulatory Affairs J. Rogoff, Vice President, Counsel, & Secretary B. Lacy, Nuclear Asset Manager Chairman, Linn County Board of Supervisors Chairperson, Iowa Utilities Board The Honorable Charles W. Larson, Jr.
Iowa State Senator D. McGhee - Department of Public Health ADAMS Distribution:
WDR DFT DSH RidsNrrDipmIipb GEG HBC GAW1 DRPIII DRSIII PLB1 JRK1