NRC Initial Operator Licensing Examination 05000458-04-301
ML040860033
Person / Time
Site: River Bend Entergy icon.png
Issue date: 03/25/2004
From: Gody A
Operations Branch IV
To: Hinnenkamp P
Entergy Operations
References
50-458/04-301
Download: ML040860033 (5)


See also: IR 05000458/2004301

Text

March 25, 2004

Paul D. Hinnenkamp

Vice President - Operations

Entergy Operations, Inc.

River Bend Station

5485 US Highway 61N

St. Francisville, LA 70775

SUBJECT:

RIVER BEND STATION - NRC INITIAL OPERATOR LICENSING

EXAMINATION 05000458/2004-301

Dear Mr. Hinnenkamp:

In a telephone conversation on March 23, 2004, between Messrs. T. Stetka, Chief Examiner,

and R. Persons, Senior Operations Instructor, arrangements were made for the administration

of licensing examinations at your River Bend Station during the week of September 20, 2004.

As agreed during the telephone conversation, your staff will prepare the examinations based on

the guidelines in draft Revision 9, of NUREG-1021, "Operator Licensing Examination Standards

for Power Reactors." The NRC regional office will discuss with your staff any changes that

might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination

outlines by May 27, 2004. The written examinations, operating tests, and the supporting

reference materials identified in Attachment 2 of ES-201and as specified by the Chief Examiner

will be due by July 26, 2004. Pursuant to 10 CFR 55.40(b)(3), an authorized representative of

the facility licensee shall approve the outlines, examinations, and tests before they are

submitted to the NRC for review and approval. All materials shall be complete and

ready-to-use. Any delay in receiving the required examination and reference materials, or the

submittal of inadequate or incomplete materials, may cause the examinations to be

rescheduled. Additionally, an onsite validation of the examination material will be performed

during the week of September 6, 2004. Sufficient staff resources and the simulator should be

made available for the examination validation.

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402 and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Entergy Operations, Inc.

-2-

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior operator license applications (Office of Management and Budget (OMB)

approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and

waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first

examination date, or no later than August 25, 2004. If the applications are not received at least

30 days before the examination date, a postponement may be necessary. Signed applications

certifying that all training has been completed should be submitted at least 14 days before the

first examination date or no later than September 17, 2004.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget, approval number 3150-0018, which expires on June 30, 2006.

The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br />

per response, including the time for reviewing instructions, gathering and maintaining the data

needed, writing the examinations, and completing and reviewing the collection of information.

Send comments on any aspect of this collection of information, including suggestions for

reducing the burden, to the Information and Records Management Branch (T-6 F33),

U.S. Nuclear Regulatory Commission, Washington, DC 20555-001, or by Internet electronic

mail at BJS1@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory

Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC

20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection

of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter, its

enclosures, and your response will be available electronically for public inspection in the NRC

Public Document Room or from the Publicly Available Record (PARS) component of the NRCs

document system (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/NRC/ADAMS/index.html (the Public Electronic Reading Room).

I appreciate your participation in the pilot effort for the draft Revision 9 of NUREG 1021 and

look forward to your comments on its implementation. Thank you for your cooperation in this

matter. Mr. Persons has been advised of the policies and guidelines referenced in this letter. If

you have any questions regarding the NRC's examination procedures and guidelines, please

contact Mr. Tom Stetka at 817-860-8247, or myself at 817-860-8159.

Sincerely,

/RA/

Anthony T. Gody, Chief

Operations Branch

Division of Reactor Safety

Entergy Operations, Inc.

-3-

Docket: 50-458

License: NPF-47

cc:

Senior Vice President and

Chief Operating Officer

Entergy Operations, Inc.

P.O. Box 31995

Jackson, MS 39286-1995

Vice President

Operations Support

Entergy Operations, Inc.

P.O. Box 31995

Jackson, MS 39286-1995

General Manager

Plant Operations

Entergy Operations, Inc.

River Bend Station

5485 US Highway 61N

St. Francisville, LA 70775

Director - Nuclear Safety

Entergy Operations, Inc.

River Bend Station

5485 US Highway 61N

St. Francisville, LA 70775

Wise, Carter, Child & Caraway

P.O. Box 651

Jackson, MS 39205

Mark J. Wetterhahn, Esq.

Winston & Strawn

1401 L Street, N.W.

Washington, DC 20005-3502

Manager - Licensing

Entergy Operations, Inc.

River Bend Station

5485 US Highway 61N

St. Francisville, LA 70775

The Honorable Charles C. Foti, Jr.

Attorney General

Department of Justice

State of Louisiana

P.O. Box 94005

Baton Rouge, LA 70804-9005

Entergy Operations, Inc.

-4-

H. Anne Plettinger

3456 Villa Rose Drive

Baton Rouge, LA 70806

Burt Babers, President

West Feliciana Parish Police Jury

P.O. Box 1921

St. Francisville, LA 70775

Michael E. Henry, State Liaison Officer

Department of Environmental Quality

Permits Division

P.O. Box 4313

Baton Rouge, LA 70821-4313

Brian Almon

Public Utility Commission

William B. Travis Building

P.O. Box 13326

1701 North Congress Avenue

Austin, TX 78711-3326

Entergy Operations, Inc.

-5-

Electronic distribution by RIV:

Regional Administrator (BSM1)

DRP Director (ATH)

DRS Director (DDC)

Senior Resident Inspector (PJA)

Branch Chief, DRP/B (DNG)

Senior Project Engineer, DRP/B (RAK1)

Staff Chief, DRP/TSS (PHH)

RITS Coordinator (KEG)

ADAMS:  Yes

 No Initials: ______

 Publicly Available  Non-Publicly Available

 Sensitive

 Non-Sensitive

SOE:OB

C:OB

TFStetka/lmb

ATGody

/RA/

/RA/

03/25/04

03/25/04

OFFICIAL RECORD COPY

T=Telephone E=E-mail F=Fax