VII mm*---

TM Richard L Anderson Vice President - Nuclear Operations PPL Susquehanna, LLC 769 Salem /Boulevard Berwick, PA 18603 Tel. 570.542.3883 Fax 570.542.1504 RLAnderson~ pplweb.com March 12, 2004 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station OPI-17 Washington, D.C. 20555 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 and 50-388/NPF-22 PLA- 005732 The February 2004 Monthly Operating Reports for Susquehanna SES Units I and 2 are attached.

Very truly yours, Richard L. Anderson JJH/icmm cc: NRC Region I NRC Sr. Resident Inspector, Mr. S. Hansell NRC Project Manager, Mr. R V. Guzman Vill

C6 OPERATING DATA REPORT DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-387 One 03/12/2004 J. J. Hennings (570) 542-3747 OPERATING STATUS 1.

2.

3.

4.

Unit Name:

Susauehanna Steam Electric Station (Ul)

Reporting Period:

February 2004 Design Electrical Rating (Net MWe):

1115 Maximum Dependable Capacity (Net MWe):

1105 5.

6.

7.

8.

9.

Hours in Reporting Period Number of Hours Reactor Was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)

This Month 696 649.35 648.02 0

594,939 Yr.-to-Date 1440 1393.4 1392.0 0

1,374,837 Cumulative

  • 181,729 151,878.2 149,631.6 0

153,988,275 NOTES:

Page 1 of 1

A.

UNIT SHUTDOWNS DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-387 One 03/1212004 J. J. Hennings (570) 542-3747 REPORT MONTH February 2004 No.

Date Type Duration Reason Method of Cause & Corrective Action I

(Hours) 2 Shutting To Prevent Recurrence Down Reactor 3 1

2/28/04 S

48 C

2 Planned Refuel Outage.

Summary:

End-Of-Cycle coastdown began January 1,2004, and continued until February 28,2004 when the Unit 1-13 Refueling Outage commenced. The breaker was opened at 00:01 on February 28.

1.

F. Forced S. Scheduled 2.

Reason:

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction 3.

Method:

1-Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other E - Operator Training & Licensee Exam F-Administrative G - Operational Error (Explain)

Page 1 of I

SUSOUEHANNA STEAM ELECTRIC STATION Docket Number:

50-387 Date-03/12/04 Completed by: J. J. Hennings Telephone:

(570) 542-3747 Challenges to Main Steam Safety Relief Valves None.

Ic OPERATING DATA REPORT DOCKET NO.

UNIT DATE COMPLETED BY.

TELEPHONE 50-388 Two 03/12104 J. J. Hennings (570) 542-3747 OPERATING STATUS

1. Unit Name:

Susguehanna Steam Electric Station (U2)

2.

Reporting Period:

February 2004

3.

Design Electrical Rating (Net MWe):

1182

4.

Maximum Dependable Capacity (Net MWe):

1140 5.

6.

7.

8.

9.

Hours in Reporting Period Number of Hours Reactor Was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)

This Month 696 696 696 0

812,518 Yr.-to-Date 1,440 1,440 1,440 0

1,646,106 Cumulative 166,969 145.335.8

.143,348.6 0

150,411,757 NOTES:

Page 1 of 1

UNIT SHUTDOWNS DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 03/12/04 J. J. Hennings (570) 542-3747 REPORT MONTH Februarv 2004 No.

Date Type Duration Reason Method of Cause & Corrective Action (Hours) 2 Shutting to Prevent Recurrence Down Reactor 3

No shutdowns this month.

Summary: The only power reduction greater than 20% this month was on February 21 for a planned control rod sequence exchange at 65% power, 100% was achieved on February 22.

1.

2.

3.

F. Forced S. Scheduled Reason:

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction Method:

1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)

Page 1 of 1

A o

SUSOUEHANNA STEAM ELECTRIC STATION Docket Number:

50-388 Completed by:

J. J. Hennings Date:

03/12/2004 Telephone: