FENOC ForstEnergy Nuclear Operating Company Perry Nuclear Power Plant 10 Center Road PO. Box 97 Perry, Ohio 44081 March 15, 2004 PY-CEINRR-278 1 L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C.
20555 Perry Nuclear Power Plant Docket No. 50-440 License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:
Attached is the February 2004 Monthly Operating Report for Perry Unit 1. Page I is the Operating Data Report and page 2 is the Unit Shutdowns Report. This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, "Revised Contents of the Monthly Operating Report."
If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.
Very truly yours, Vernon K. Higaki Manager - Regulatory Affairs Attachment cc: NRC Region III Administrator NRC Project Manager NRC Resident Inspector
// A
OPERATING DATA REPORT UNIT:
Perry DATE:
3/9/04
- 1.
Docket: 50-440
- 2.
Unit Name:
Perry Nuclear Power Plant
- 3.
Reporting Period: February 2004
- 4.
Utility
Contact:
T. Phelps
- 5.
Telephone: 440-280-7660
- 6.
Design Electrical Rating (Net MWe):
- 7.
Maximum Dependable Capacity (Net MWe):
1260 1235
- 8.
Hours Reactor was Critical
- 9.
Hours Generator On-Line
- 10.
Unit Reserve Shutdown Hours
- 11.
Net Electrical Energy (MWeH)
This Month 696.0 696.0 0.0 876,390.0 Yr-to-Date 1.440.0 1.440.0 0.0 1.780,259.0 Cumulative 113.684.7 110.951.3 0.0 126,908.671.0 Page 1
UNIT SHUTDOWNS REPORT MONTH - FEBRUARY 2004 DOCKET NO: 50-440 NAME: Perry Nuclear Power Plant DATE: 3/9/04 CONTACT: T. PhelDs TELEPHONE: (440) 280-7660 No.
Date Type Duration Reason Method Cause and Corrective Action to Prevent Recurrence Hours 2
3
SUMMARY
The Perry Plant was on line the entire month of February.
- 1. TYPE:
F: Forced S: Scheduled
- 2. REASON:
A - Equipment Failure (explain)
B - Maintenance or Test C - Refueling D - Regulatory E - Operating Training &
License Examination F - Administrative G - Operational Error (explain)
H - Other (explain)
- 3. METHOD:
1 - Manual 2 - Manual Scram 3 -Automatic Scram 4 - Continuation 5 - Other Page 2