February 2004 Monthly Operating Report for Perry Nuclear Power Plant
ML040830617
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 03/15/2004
From: Higaki V
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, PY-CEI/NRR-2781L
Download: ML040830617 (3)


Text

FENOC ForstEnergy Nuclear Operating Company Perry Nuclear Power Plant 10 Center Road PO. Box 97 Perry, Ohio 44081 March 15, 2004 PY-CEINRR-278 1 L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C.

20555 Perry Nuclear Power Plant Docket No. 50-440 License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:

Attached is the February 2004 Monthly Operating Report for Perry Unit 1. Page I is the Operating Data Report and page 2 is the Unit Shutdowns Report. This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, "Revised Contents of the Monthly Operating Report."

If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.

Very truly yours, Vernon K. Higaki Manager - Regulatory Affairs Attachment cc: NRC Region III Administrator NRC Project Manager NRC Resident Inspector

// A

OPERATING DATA REPORT UNIT:

Perry DATE:

3/9/04

1.

Docket: 50-440

2.

Unit Name:

Perry Nuclear Power Plant

3.

Reporting Period: February 2004

4.

Utility

Contact:

T. Phelps

5.

Telephone: 440-280-7660

6.

Design Electrical Rating (Net MWe):

7.

Maximum Dependable Capacity (Net MWe):

1260 1235

8.

Hours Reactor was Critical

9.

Hours Generator On-Line

10.

Unit Reserve Shutdown Hours

11.

Net Electrical Energy (MWeH)

This Month 696.0 696.0 0.0 876,390.0 Yr-to-Date 1.440.0 1.440.0 0.0 1.780,259.0 Cumulative 113.684.7 110.951.3 0.0 126,908.671.0 Page 1

UNIT SHUTDOWNS REPORT MONTH - FEBRUARY 2004 DOCKET NO: 50-440 NAME: Perry Nuclear Power Plant DATE: 3/9/04 CONTACT: T. PhelDs TELEPHONE: (440) 280-7660 No.

Date Type Duration Reason Method Cause and Corrective Action to Prevent Recurrence Hours 2

3

SUMMARY

The Perry Plant was on line the entire month of February.

1. TYPE:

F: Forced S: Scheduled

2. REASON:

A - Equipment Failure (explain)

B - Maintenance or Test C - Refueling D - Regulatory E - Operating Training &

License Examination F - Administrative G - Operational Error (explain)

H - Other (explain)

3. METHOD:

1 - Manual 2 - Manual Scram 3 -Automatic Scram 4 - Continuation 5 - Other Page 2