February 2004 Monthly Operating Report for Duane Arnold Energy Center
ML040830609
Person / Time
Site: Duane Arnold 
(DPR-049)
Issue date: 03/12/2004
From: Peifer M
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, NG-04-0152
Download: ML040830609 (3)


Text

CNleE Committed to Nuclear Ecellene Duane Arnold Energy Center Operated by Nuclear Management Company, LLC March 12, 2004 NG-04-01 52 TS 5.6.4 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station 0-P1-17 Washington, DC 20555-0001 DUANE ARNOLD ENERGY CENTER DOCKET 50-331 LICENSE No. DPR-49 MONTHLY OPERATING REPORT Please find enclosed the Duane Arnold Energy Center Monthly Operating Report.

The report has been prepared in accordance with the guidelines of NRC Generic Letter 97-02: "Revised Contents Of The Monthly Operating Report," and distribution has been made in accordance with DAEC Technical Specifications, Section 5.6.4.

This letter makes no new commitments or changes to any existing commitments.

Sincerely, Site Vice President, Duane Arnold Energy Center CC Regional Administrator, USNRC, Region IlIl Project Manager, USNRC, NRR NRC Resident Inspector (DAEC)

Enclosure:

OPERATING DATA REPORT

/>e2I 3277 DAEC Road

  • Palo, Iowa 52324-9785 Telephone: 319.851.7611

March 12, 2004 Enclosure to NG-04-0152 Page 1 of 2 OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD:

50-331 Duane Arnold March 4, 2004 Mike Fairchild (319) 851-7642 February 2004 1.

2.

Design Electrical Rating (MWe)

Maximum Dependable Capacity (MWe-Net) 581.40 565.50

3. Number of Hours the Reactor was Critical
4. Number of Hours Generator On-line
5. Reserve Shutdown Hours
6. Net Electrical Energy Generated (MWHrs)

This Month 696.00 696.00 0.00 406.471.90 Yr-to-Date 1440.00 1440.00 0.00 843.339.20 Cumulative 203.118.27 198.725.52 192.80 92.798.614.88 UNIT SHUTDOWNS Type Method Cause &

F: Forced of Corrective S:

Duration Shuttinp Action o

Date Scheduled (Hours)

Reason 1 Down Comments I,

'Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain) 2Method:

1 Manual 2

Manual TriplScram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)

March 12, 2004 Enclosure to NG-04-0152 Page 2 of 2 NARRATIVE

SUMMARY

During the month, departures from full power operation occurred for the following:

1.) On February 18 at 2145 for a load line adjustment.

2.) At 2257 on February 27 for performing various surveillance tests and sequence exchange. Rated power was achieved at 0100 on February 29.

3.) On February 29 at 0933 and 2159 for load line adjustments.