March 23, 2004 EA-03-208 Mr. William R. Kanda Vice President - Nuclear, Perry FirstEnergy Nuclear Operating Company P. O. Box 97, A210 10 Center Road Perry, OH 44081
SUBJECT:
SUMMARY
OF THE MARCH 2, 2004, CLOSED PREDECISIONAL ENFORCEMENT CONFERENCE TO DISCUSS NRC OFFICE OF INVESTIGATIONS REPORT NO. 3-2002-031
Dear Mr. Kanda:
This refers to the closed predecisional enforcement conference held on March 2, 2004, at the Nuclear Regulatory Commission (NRC) Region III Office, Lisle, Illinois. The meeting was between the NRC and FirstEnergy Nuclear Operating Company (FENOC) to discuss an apparent willful violation of the Perry Nuclear Power Plant Technical Specification requiring preapproval of overtime to be worked in excess of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in a seven-day period. The licensee presented a summary of the causes for the apparent violation and their corrective actions. The meeting was closed to the public due to the need to discuss sensitive personnel issues, and as such, the presentation material used by your staff is not being included in this summary. A list of principal NRC and FENOC meeting attendees is attached as an enclosure to this letter.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Should you have questions concerning this meeting, please contact me at (630) 829-9726.
Sincerely,
/RA/
David Hills, Chief Mechanical Engineering Branch Division of Reactor Safety Docket No. 50-440 License No. NPF-58
Enclosure:
As stated See Attached Distribution
March 23, 2004 EA-03-208 Mr. William R. Kanda Vice President - Nuclear, Perry FirstEnergy Nuclear Operating Company P. O. Box 97, A210 10 Center Road Perry, OH 44081
SUBJECT:
SUMMARY
OF THE MARCH 2, 2004, CLOSED PREDECISIONAL ENFORCEMENT CONFERENCE TO DISCUSS NRC OFFICE OF INVESTIGATIONS REPORT NO. 3-2002-031
Dear Mr. Kanda:
This refers to the closed predecisional enforcement conference held on March 2, 2004, at the Nuclear Regulatory Commission (NRC) Region III Office, Lisle, Illinois. The meeting was between the NRC and FirstEnergy Nuclear Operating Company (FENOC) to discuss an apparent willful violation of the Perry Nuclear Power Plant Technical Specification requiring preapproval of overtime to be worked in excess of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in a seven-day period. The licensee presented a summary of the causes for the apparent violation and their corrective actions. The meeting was closed to the public due to the need to discuss sensitive personnel issues, and as such, the presentation material used by your staff is not being included in this summary. A list of principal NRC and FENOC meeting attendees is attached as an enclosure to this letter.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Should you have questions concerning this meeting, please contact me at (630) 829-9726.
Sincerely,
/RA/
David Hills, Chief Mechanical Engineering Branch Division of Reactor Safety Docket No. 50-440 License No. NPF-58
Enclosure:
As stated See Attached Distribution
- See Previous Concurrence DOCUMENT NAME: ML040830547.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII RIII NAME
- DHills for ADunlop:tr
- MRing
- BClayton DHills DATE 03/23/04 03/23/04 03/23/04 03/23/04 OFFICIAL RECORD COPY
W. Kanda cc w/encl:
G. Leidich, President - FENOC J. Hagan, Senior Vice President Engineering and Services, FENOC W. OMalley, Director, Maintenance Department V. Higaki, Manager, Regulatory Affairs J. Messina, Director, Nuclear Services Department T. Lentz, Director, Nuclear Engineering Department T. Rausch, Plant Manager, Nuclear Power Plant Department M. OReilly, Attorney, First Energy Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health
W. Kanda cc w/encl:
G. Leidich, President - FENOC J. Hagan, Senior Vice President Engineering and Services, FENOC W. OMalley, Director, Maintenance Department V. Higaki, Manager, Regulatory Affairs J. Messina, Director, Nuclear Services Department T. Lentz, Director, Nuclear Engineering Department T. Rausch, Plant Manager, Nuclear Power Plant Department M. OReilly, Attorney, First Energy Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health ADAMS Distribution:
F. Congel (FJC), OE J. Dixon-Herrity, OE D. Dambly (DCD), OGC S. Lewis, OGC G. Caputo, OI AJM DFT SPS1 RidsNrrDipmIipb GEG HBC RJP C. Pederson, DRS C. Weil, RIII R. Paul, OI:RIII W. Franz, OI:RIII DRPIII DRSIII PLB1 JRK1
Enclosure Meeting Participants NRC G. Grant, Deputy Regional Administrator R. Caniano, Deputy Director, Division of Reactor Safety D. Hills, Chief, Mechanical Engineering Branch M. Ring, Chief, Reactor Projects Branch 1 B. Clayton, Team Leader, Enforcement and Investigation Coordination Staff C. Weil, Enforcement and Investigation Coordination Staff R. Paul, Office of Investigations W. Franz, Office of Investigations J. Dixon-Herrity, Office of Enforcement S. Lewis, Office of General Counsel P. Lougheed, Reactor Engineer FirstEnergy Nuclear Operating Company G. Leidich, President and Chief Nuclear Officer, FENOC W. Kanda, Vice President, Perry Nuclear Power Plant J. Messina, Director, Perry Nuclear Services V. Higaki, Manager, Perry Regulatory Affairs G. Chasko, Perry Operations Staff T. Henderson, Perry Regulatory Affairs Staff G. Pawlik, Pawlik Investigative Associates B. Baer, Morgan Lewis