Requalification Program Inspection - J. A. Fitzpatrick Nuclear Power Plant Dtd 3/18/04
ML040790174
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 03/18/2004
From: Conte R
NRC/RGN-I/DRS/OSB
To: Ted Sullivan
Entergy Nuclear Northeast
Shared Package
ML040510089 List:
References
Download: ML040790174 (3)


Text

March 18, 2004 Mr. Theodore Sullivan Site Vice President Entergy Nuclear Northeast James A. FitzPatrick Nuclear Power Plant P.O. Box 110 Lycoming, NY 13093

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION - J. A. FITZPATRICK NUCLEAR POWER PLANT

Dear Mr. Sullivan:

In a telephone conversation on March 18, 2004, Mr. Julian Williams, Examiner/Inspector, and Mr. Reininghaus, made arrangements for the NRC to inspect the licensed operator requalification program at the J. A. FitzPatrick Nuclear Power Plant facility. The inspection is planned for the week of April 26, 2004, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.

In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their comprehensive requalification written examinations or annual operating tests as necessary to support the NRCs inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish: 1) an index or summary of condition reports written in the past two years in which licensed operator errors were determined to be the root or contributing cause; 2) an index or summary of condition reports written in the past two years on simulator performance problems; 3) an index or summary of simulator performance test results in the past two years; and 4) the examination schedule, sample plan, and operating test scheduled for the week of the inspection to the NRC by April 19, 2004. Mr. Reininghaus has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on June 30, 2006.

The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at SLF@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.

Mr. Theodore Sullivan The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Julian Williams, at (610) 337-6967.

Sincerely,

/RA/

Richard J. Conte, Chief Operational Safety Branch Division of Reactor Safety Docket No.

50-333 License No.

DPR-59 cc:

G. Taylor, CEO, Entergy Operations K. Mulligan, General Manager, Plant Operations B. OGrady, VP Operations Support M. Colomb, Director of Oversight A. Halliday, Manager, Regulatory Compliance M. Kansler, President, Entergy R. Locy, Manager - Training D. Pace, VP Engineering J. Fulton, Assistant General Counsel Supervisor, Town of Scriba S. Lyman, Oswego County Administrator C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law P. Eddy, Electric Division, Department of Public Service, State of New York P. Smith, President, New York State Energy Research and Development Authority J. Spath, SLO Designee, New York State Energy Research and Development Authority S. Lousteau, Treasury Department T. Judson, Central New York Citizens Awareness Network

Mr. Theodore Sullivan Distribution w/encl via E-Mail:

Region I Docket Room (with concurrences)

L. Cline, DRP - NRC Senior Resident Inspector D. Dempsey, Resident Inspector H. Miller, RA J. Wiggins, DRA G. Meyer, DRP S. Barber, DRP H. Williams, DRS Examiner, DRS C. Buracker, DRS (OL Facility File)

L. Vick, HOHB, NRR R. Conte, DRS DOCUMENT NAME: G:\\OSB\\Williams/FitzRequal/60dayrpi.wpd ADAMS PKG: ML040510089 After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS/OSB RI/DRS/OSB RI/DRS/OSB NAME CBuracker HWilliams RConte DATE 03/19/04 03/18/04 03/18/04 OFFICIAL RECORD COPY