February 2004 Monthly Operating Report for Fort Calhoun Unit 1
ML040780322
Person / Time
Site: Fort Calhoun 
Issue date: 03/09/2004
From: Bannister D
Omaha Public Power District
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LIC-04-0020
Download: ML040780322 (2)


Text

Omwha Public Power Disict 444 South 16th Street AMall Omaha NE 68102-2247 March 9, 2004 LIC-04-0020 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Reference:

Docket No. 50-285

SUBJECT:

February 2004 Monthly Operating Report (MIOR)

Pursuant to Fort Calhoun Station (FCS) Unit No. I Technical Specification 5.9.1.c, Omaha Public Power District (OPPD) submits the attached MOR for February 2004. No commitments are made to the NRC in this letter.

If you have any questions, please contact Mr. Erick Matzke at (402) 533-6855.

Sincerely, D. J. Bannister Manager - Fort Calhoun Station 11 i

i i

i DJB/EPM/epm Attachment c:

B. S. Mallett, NRC Regional Administrator, Region IV A. B. Wang, NRC Project Manager J. G. Kramer, NRC Senior Resident Inspector INPO Records Center Employment wvith Equal Opportunity

') cf I-e--

01

1

LIC-04-0020 Attachment OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE CONIPLETED BY TELEPHONE REPORT PERIOD:

50-285 Fort Calhoun Station March 2, 2004 E. P. Matzke (402) 533-6855 Febmuarv 2004 Design Electrical Rating (MM'e-Net):

Maximum Dependable Capacity (NINN'e-Net):

478 478 MONTH 696 YR-TO-DATE 1440 CUMUJILATIVE 216308 Number of Hours Reactor Nvas Critical:

Number of Hlours Generator was On-line:

Unit Reserve Shutdown Hours:

Net Electrical Energy Generated (M\\h):

696 1440 214965 0

0 0

341394 707053 93233156 UNIT SIIUTDOW'%NS Type Method of Date Duration I

Stting Cause & Corrective (vv/mmldd)

S: Scheduled (Hlours) n Down Action Comments Sc___duled

_Reactor 2

(I) Reason:

A-Equipment Failure (Explain)

B-Alaintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training/License Examination F-Administrative G-Operational Error (Explain) 11-Other (Explain)

(2) Method:

1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation 5-Other (Explain)

OPERATIONS

SUMMARY

Fort Calhoun Station operated at a nominal 100 percent power for the month of February 2004.