ML040770919
| ML040770919 | |
| Person / Time | |
|---|---|
| Site: | Kewaunee |
| Issue date: | 02/02/2004 |
| From: | Lanksbury R NRC/RGN-III/DRS/OLB |
| To: | Coutu T Nuclear Management Co |
| References | |
| 50-305/04-301 | |
| Download: ML040770919 (61) | |
Text
Appendix C Job Performance Measure Form ES-C-1 (R8, S1)
Worksheet Facility: Kewaunee Task No: Procedure N-CRD-49D Task
Title:
ECP Manual Calculation Job Performance Measure No: A. 1 (RO)
WA
Reference:
Generic 2.1.25 (2.8 / 3.1)
Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of testina:
Simulated Performance Actual Performance X
Plant Classroom Simulator X
READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
You are the RO assigned to day shift.
The reactor automatically tripped at 8 am yesterday and is expected to be critical at 2 pm today.
Prior to the trip, the reactor was at steady-state 100% power for 3 weeks.
Core burnup is 6500 MWD/MTU and boron concentration is currently 1400 ppm.
Desired CBD position is 90 steps and Tavg is expected to be 548°F for Startup No. 11 1.
The computer is not available and an updated reactivity plan is being developed.
Task Standard: The ECP is completed with the critical boron concentration determined to be 1288 ppm 5 14. Maximum and minimum CBD rod position are determined to be 160 steps (+1,
-0) and 37 steps (+1, -0). Graph values are to be read to within one half of one division.
Rewired Materials: N-CRD-49D, Calculating Estimated Critical Position for Reactor Startup, Reactor Data (RD) curves referenced below, and a calculator.
General
References:
N-CRD-49D, Rev. D and appropriate RD curves, including 5.1.I
.1, 5.1.1.2, 6.2, 8.3, 9.2, 9.1.2, 10.1, 10.2, and 13.2.
lnitiatina Cue: The CRS has directed you to perform an independent manual ECP for a Critical Boron - Fixed Rod Height per step 4.2 of N-CRD-49D.
Time Critical Task: NO Validation Time: 40 minutes
I_
Appendix C Job Performance Measure Form ES-C-1 (R8, SI)
INITIAL CONDITIONS Facility: Kewaunee Job Performance Measure No: A.l (RO)
Initial Conditions:
You are the RO assigned to day shift.
The reactor automatically tripped at 8 am yesterday and is expected to be critical at 2 pm today.
Prior to the trip, the reactor was at steady-state 100% power for 3 weeks.
Core burnup is 6500 MWD/MTU and boron concentration is currently 1400 ppm.
Desired CBD position is 90 steps and Tavg is expected to be 548°F for Startup No. 11 1.
The computer is not available and an updated reactivity plan is being developed.
lnitiatina Cue: The CRS has directed you to perform an independent manual ECP for a Critical Boron - Fixed Rod Height per step 4.2 of N-CRD-49D.
Appendix C 3
Form ES-C-1 (R8, Si)
PERFORMANCE INFORMATION (Denote critical steps with a "*")
Startina Time:
1 Performance step:
Heading of ECP data sheet is filled out.
Standard:
ALL blocks filled out with given information (see grading data sheet).
Comment:
2 Performance step:
Determine excess core reactivity based on core burnup.
Standard:
Excess core reactivity determined to be 12290 pcm 250 using RD 13.2.
Comment:
3 Performance step:
Calculate xenon worth.
Standard:
RD 9.2 is used to determine full power equilibrium Xe (-2573 pcm k2.5)
RD 9.1.2 is used to determine YO full power equilibrium Xe (0.69 k0.005)
These values are multiplied together to obtain Xe worth (-1775 pcm +15)
Comment:
Appendix C 4
PERFORMANCE INFORMATION (Denote critical steps with a "*")
4 Performance step:
Determine Samarium worth.
Standard:
Samarium worth is determined using RD 10.1 or RD 10.2 (-945 pcm 2 2.5)
Comment:
The MOL line should be used and RD 10.1 may more easily provide an accurate samarium worth value due to smaller time increments.
5 Performance step:
Determine temperature defect.
Standard:
Temperature defect is determined to be 1 OF (548 - 547 = 1 O F ).
Isothermal Temperature Coefficient is 0 per N-CRD-49D note.
These values are multiplied together to obtain temperature defect (0 pcm).
Comment:
6 Performance step:
Calculate total defect.
Standard:
Total defect is the sum of all calculated reactivities (9570 pcm k67.5).
Comment:
Appendix C 5
PERFORMANCE INFORMATION (Denote critical steps with a "*")
7 Performance step:
Determine rod worth with CBD at 90 steps.
Standard:
RD 5.1.I.I or RD 5.1.1.2 is used to determine rod worth (-576 pcm +O)
Comment:
8 Performance step:
Determine net reactivity.
Standard:
Rod worth is added to obtain net reactivity (9570 - 576 = 8994 pcm k67.5).
Comment:
9 Performance step:
Determine critical reactivity.
Standard:
Rod worth is multiplied by -1 to obtain critical reactivity (8994 X -1 = -8994 pcm k67.5).
Comment:
Appendix C 6
PERFORMANCE INFORMATION (Denote critical steps with a "*")
10 Performance step:
Determine differential boron worth.
Standard:
Differential boron worth is determined using RD 6.2 for MOL at 1400 ppm
(-6.98 pcm/ppm k0.025)
Comment:
11
- Performance step:
Determine critical boron concentration.
Standard:
Critical boron concentration is determined by dividing critical reactivity by the differential boron worth (-8994 / -6.98 = 1289 ppm
- 14)
Comment:
The critical boron concentration value of 1288 ppm indicates that a dilution is required.
12*
Performance step:
Determine maximum CBD position.
Standard:
400 pcm is added to the CBD worth (-576 + 400 = -176 pcm). Using RD 5.1.1.1 or RD 5.1.1.2, maximum CBD position is 159 steps +1, -0)
Comment:
Appendix C 7
Form ES-C-1 (R8, Sly PERFORMANCE INFORMATION (Denote critical steps with a "*")
13*
Performance step: Determine minimum CBD position.
Standard:
400 pcm is subtracted from the CBD worth (-576 - 400 = -976 pcm). Using RD 5.1.1.1 or RD 5.1.1.2, minimum CBD position is (37 steps +I,
-0)
Comment:
Terminatina cue:
THIS COMPLETES THE JPM.
Completion Time:
Appendix C 8
Form ES-C-1 (R8, S1)
VERIFICATION OF COMPLETION Job Performance Measure No.
A. 1 (RO]
Examinees Name:
Examiners Name:
Date performed:
Facility Evaluator:
Number of attempts:
Time to complete:
Question Documentation:
Question:
Response
~~
Result: SAT or UNSAT Examiners signature and date:
Appendix C Job Performance Measure Form ES-C-2 (R8, S1)
Quality Checklist Every JPM should:
- 1.
J be supported by facility licensees job task analysis.
- 2.
J be operationally important (meets NRC WA Catalog threshold criterion of 2.5 (3 for requalification exams) or as determined by the facility and agreed to by the N RC).
- 3.
J be designed as either SRO only, RO/SRO or AO/RO/SRO.
- 4.
include the following, as applicable:
- a. ___
J initial conditions
- b. -
J initiating cues
- c. _c_
J references and tools, including associated procedures
- d. ___
J validated time limits (average time allowed for completion) and specific designation of those JPMs that are deemed to be time-critical by the facility operations department
- e. ___
J specific performance criteria that include:
(1) J expected actions with exact control and indication nomenclature and criteria (switch position, meter reading),
even if these criteria are not specified in the procedural step (2) J system response and other cues that are complete and correct so that the examiner can properly cue the examinee, if asked (3) J statements describing important observations that should be made by the examinee (4) J criteria for successful completion of the task (5) J identification of those steps that are considered critical (6)
N/A restrictions on the sequence of steps
Appendix C Job Performance Measure Form ES-C-1 (R8, S1)
Worksheet Facility: Kewaunee Task No: Procedure N-CRD-49D Task
Title:
ECP Manual Calculation Job Performance Measure No: A. 1 (SRO)
WA
Reference:
Generic 2.1.25 (2.8 / 3.1)
Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of testing Simulated Performance Actual Performance X
Classroom X
Simulator X
Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
You are the SRO assigned to day shift.
The reactor automatically tripped at 8 am yesterday and is expected to be critical at 2 pm today.
Prior to the trip, the reactor was at steady-state 100°/o power for 3 weeks.
Core burnup is 6500 MWD/MTU and boron concentration is currently 1400 ppm.
Desired CBD position is 90 steps and Tavg is expected to be 548°F for Startup No. 11 1.
The computer is not available and an updated reactivity plan is being developed.
Task Standard: The ECP is completed with the critical boron concentration determined to be 1288 ppm 2 14. Maximum and minimum CBD rod position are determined to be 160 steps (+1,
-0) and 37 steps (+1, -0). Graph values are to be read to within one half of one division.
Reauired Materials: N-CRD-49D, Calculating Estimated Critical Position for Reactor Startup, Reactor Data (RD) curves referenced below, and a calculator.
General
References:
N-CRD-49D, Rev. D and appropriate RD curves, including 5.1.1.1, 5.1.1.2, 6.2, 8.3, 9.2, 9.1.2, 10.1, 10.2, and 13.2.
Initiating Cue: The Shift Manager has directed you to REVIEW and CORRECT as necessary a manual ECP for a Critical Boron - Fixed Rod Height per step 4.2 of N-CRD-49D.
Time Critical Task: NO Validation Time: 40 minutes
Appendix C Job Performance Measure Form ES-C-1 (R8, S1)
INITIAL CONDITIONS Facility: Kewaunee Job Performance Measure No: A. 1 (SRO)
Initial Conditions:
You are the SRO assigned to day shift.
The reactor automatically tripped at 8 am yesterday and is expected to be critical at 2 pm today.
Prior to the trip, the reactor was at steady-state 100% power for 3 weeks.
Core burnup is 6500 MWD/MTU and boron concentration is currently 1400 ppm.
Desired CBD position is 90 steps and Tavg is expected to be 548°F for Startup No. 11 1 The computer is not available and an updated reactivity plan is being developed.
lnitiatina Cue: The Shift Manager has directed you to REVIEW and CORRECT as necessary a manual ECP for a Critical Boron - Fixed Rod Height per step 4.2 of N-CRD-49D.
Appendix C 3
Form ES-C-1 (R8, Sly PERFORMANCE INFORMATION (Denote critical steps with a "*")
Startina Time:
1 Performance step:
Heading of ECP data sheet is verified to be filled out.
Standard:
ALL blocks filled out with given information (see grading data sheet).
Comment:
2 Performance step:
Determine excess core reactivity based on core burnup.
Standard:
Excess core reactivity verified to be 12290 pcm +50 using RD 13.2.
Comment:
Given 12200 pcm - NEEDS CORRECTION 3
Performance step:
Calculate xenon worth.
Standard:
RD 9.2 is used to determine full power equilibrium Xe (-2573 pcm 52.5)
RD 9.1.2 is used to determine Yo full power equilibrium Xe (0.69 k0.005)
These values are multiplied together to obtain Xe worth (-1 775 pcm +15)
Comment:
Given full power equilibrium Xe (-2581 pcm) - NEEDS CORRECTION Given Yo full power equilibrium Xe (0.7) - NEEDS CORRECTION Given Xe worth (-1806 pcm) - NEEDS CORRECTION
Appendix C 4
Form ES-C-1 (R8, Sly PERFORMANCE INFORMATION (Denote critical steps with a "*")
4 Performance step:
Determine Samarium worth.
Standard:
Samarium worth is determined using RD 10.1 or RD 10.2 (-945 pcm 2.5)
Comment:
The MOL line should be used and RD 10.1 may more easily provide an accurate samarium worth value due to smaller time increments. Given
-950 pcm - NEEDS CORRECTION 5 Performance step:
Determine temperature defect.
Standard:
Temperature defect is determined to be 1 OF (548 - 547 = 1 O F ).
Isothermal Temperature Coefficient is 0 per N-CRD-49D note.
These values are multiplied together to obtain temperature defect (0 pcm).
Comment:
Given (+1 X -7.8)
= -8 pcm - NEEDS CORRECTION 6
Performance step:
Calculate total defect.
Standard:
Total defect is the sum of all calculated reactivities (9570 pcm k67.5).
Comment:
Given 9436 pcm - NEEDS CORRECTION
Appendix C 5
Form ES-C-1 (R8, Sly PERFORMANCE INFORMATION (Denote critical steps with a "*")
7 Performance step:
Determine rod worth with CBD at 90 steps.
Standard:
RD 5.1.1.1 or RD 5.1.1.2 is used to determine rod worth (-576 pcm +O)
Comment:
OK 8 Performance step:
Determine net reactivity.
Standard:
Rod worth is added to obtain net reactivity (9570 - 576 = 8994 pcm k67.5).
Comment:
Given (9436 - 576 = 8850 pcm) - NEEDS CORRECTION 9
Performance step:
Determine critical reactivity.
Standard:
Rod worth is multiplied by -1 to obtain critical reactivity (8994 X -1 = -8994 pcm k67.5).
Comment:
Given (-8850 pcm) - NEEDS CORRECTION
Appendix C 6
Form ES-C-1 (R8, Sly PERFORMANCE INFORMATION (Denote critical steps with a *)
10 Performance step:
Determine differential boron worth.
Standard:
Differential boron worth is determined using RD 6.2 for MOL at 1400 ppm
(-6.98 pcm/ppm k0.025)
Comment:
Given (-6.95 pcm/ppm) - NEEDS CORRECTION 11
- Performance step:
Determine critical boron concentration.
Standard:
Critical boron concentration is determined by dividing critical reactivity by the differential boron worth (-8994
/ -6.98 = 1289 ppm & 14)
Comment:
Given 1274 ppm - NEEDS CORRECTION 12*
Performance step:
Determine maximum CBD position.
Standard:
400 pcm is added to the CBD worth (-576 + 400 = -176 pcm). Using RD 5.1.1.1 or RD 5.1.1.2, maximum CBD position is 159 steps +1, -0)
Comment:
Given CBD worth (+576 + 400 = 976 pcm), Thus maximum CBD position is 37 steps - NEEDS CORRECTION
Appendix C 7
Form ES-C-1 (R8, Si)
PERFORMANCE INFORMATION (Denote critical steps with a *)
13* Performance step: Determine minimum CBD position.
Standard:
400 pcm is subtracted from the CBD worth (-576 - 400 = -976 pcm). Using RD 5.1.I
.1 or RD 5.1.1.2, minimum CBD position is (37 steps +I, -0)
Comment:
Given CBD worth (+576 - 400 = 176 pcm), Thus minimum CBD position is 159 steps - NEEDS CORRECTION Terminatina cue:
THIS COMPLETES THE JPM.
ComDletion Time:
Appendix C 8
Form ES-C-1 (R8, Sly VERI Fl CAT1 ON OF COMPLETION Job Performance Measure No.
A. 1 (SRO)
Examinees Name:
Examiners Name:
Date performed:
Facility Evaluator:
Number of attempts:
Time to complete:
Question Documentation:
Question:
Response
Result: SAT or UNSAT Examiners Signature and date:
Appendix C Job Performance Measure Form ES-C-2 (R8, SI)
Quality Checklist Every JPM should:
- 1.
J be supported by facility licensees job task analysis.
- 2.
J be operationally important (meets NRC WA Catalog threshold criterion of 2.5 (3 for requalification exams) or as determined by the facility and agreed to by the NRC).
- 3.
J be designed as either SRO only, RO/SRO or AO/RO/SRO.
- 4.
include the following, as applicable:
- a.
~
J initial conditions
- b. -
J initiating cues
- c. -
J references and tools, including associated procedures
- d. -
J validated time limits (average time allowed for completion) and specific designation of those JPMs that are deemed to be time-critical by the facility operations department
- e.
~
J specific performance criteria that include:
expected actions with exact control and indication nomenclature and criteria (switch position, meter reading),
even if these criteria are not specified in the procedural step system response and other cues that are complete and correct so that the examiner can properly cue the examinee, if asked statements describing important observations that should be made by the examinee criteria for successful completion of the task identification of those steps that are considered critical restrictions on the sequence of steps
Appendix C Job Performance Measure Form ES-C-1 (R8, S1)
Worksheet Facility: Kewaunee Task
Title:
Manual QPTR WA
Reference:
2.1.33 Examinee:
Faci I i ty Eva1 uato r:
Method of testinq:
Simulated Performance Task No: SP-48-337 Job Performance Measure No: A.l.b(SRO)
NRC Examiner:
Date:
Actual Performance X
Classroom Simulator X
Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
The plant is at 80% power.
The Honeywell computer is NOT available (47024-K).
A-CP-46 is in effect.
(Examiner Note: Control Rod bank D-1 must be manually set to desired value)
Detector Current values are within k0.2, Corrected Currents are within
+0.001, and QPTR values are within k0.002. Also, QPTR is reported to exceed an Acceptance Criterion (QPTR >1.02).
Task Standards:
Required Materials: Calculator, Technical Specifications and a completed copy of SP-48-337, Quadrant Power Tilt Ratio Determination, Data Sheet 1.
Give the applicant a complete copy of SP-48-337 not just data sheet.
General
References:
SP-48-337, Quadrant Power Tilt Ratio Determination.
Initiating Cue: The SM directs you to REVIEW a manual QPTR, make any necessary Time Critical Task:
NO corrections, and advise him of any Technical Specification actions.
Validation Time:
20 minutes
Appendix C Job Performance Measure Form ES-C-1 (R8, S1)
INITIAL CONDITIONS Facility: Kewaunee Job Performance Measure No: A.l.b(SRO)
Initial Conditions:
The plant is at 80% power.
The Honeywell computer is NOT available.
lnitiatinq Cue: The SM directs you to REVIEW a manual QPTR, make any necessary corrections, and advise him of any Technical Specification actions.
Appendix C 3
Form ES-C-1 (R8, Sly PERFORMANCE INFORMATION (Denote critical steps with a "*")
Startinq Time:
1 Performance step:
Refer to procedure SP-48-337 and Data Sheet 1.
Standard:
Refer to SP-48-337, Abnormal Nuclear Instrumentation, and Data Sheet 1.
Comment:
Provide a completed copy of Data Sheet 1 as required to review and correct the JPM.
2 Performance step:
Verify individual Detector Currents from Power Range B Drawers.
Standard:
Verify individual Detector Currents are within k0.2 of panel values and Record any corrections.
Comment:
The SRO should VERIFY given detector current values against the Power Range B Drawers gncJ CORRECT any errors on Data Sheet 1. See attached Answer Key Performance step:
Verify 100% detector currents on Data Sheet 1.
Standard:
Verify recorded Power Range drawer 100% detector current values are within
+0.2 of placard values.
Comment:
The SRO should VERIFY 100°/o detector current values against the placard values gncJ CORRECT any errors on Data Sheet 1. See attached Answer Key
Appendix C 4
Form ES-C-1 (R8, S1)
PERFORMANCE INFORMATION (Denote critical steps with a "*")
4 Performance step:
Verify calculated Corrected Currents.
Standard:
Verify calculated Corrected Currents to within +0.001 by dividing Detector Current by 100% current for each detector on Data Sheet 1.
Comment:
The SRO should verify the corrected currents AND correct any errors to within
+0.001. See attached Answer Key 5*
Performance step:
Verify calculated average Corrected Currents for upper'and lower detectors Standard:
Verify calculated average Corrected Currents of the 4 upper and four lower detectors to within +0.001.
Comment:
The SRO should verify the average Corrected Currents AND correct any errors to within +0.001. NOTE: The average corrected current for the upper detectors has the middle two numbers transposed.
Performance step:
Verify calculated QPTR for each detector Standard:
Verify calculated QPTR for each detector by dividing the corrected current by the corresponding average current to within k0.002.
Comment:
The SRO should verify QPTR AND correct any errors to within 20.002. Note:
The result of having the average corrected current middle numbers transposed is that the QPTR for the upper detectors will not indicate above 1.02. The actual QPTR is 1.03.
Appendix C 5
Form ES-C-1 (R8, Si)
PERFORMANCE INFORMATION (Denote critical steps with a *)
7*
Performance step:
Review QPTR results per Technical Specifications and specify actions required to the CRS.
Standard:
Refer to Technical Specification 3.10.c - Quadrant Power Tilt Limits, for a tilt >
1.02 but less than 1.09 AND report a Technical Specification/Acceptance Criterion has been exceeded.
Comment:
The SRO should note the tilt and notify the Shift Manager to:
0 0
Eliminate the tilt within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or reduce power to 150%.
Restrict maximum core power by 2% for every 1 Yo of indicated power tilt ratio >1.O.
Terminatinu cue:
This JPM is completed.
ComDletion Time:
Appendix C 6
Form ES-C-1 (R8, S1)
VERIFICATION OF COMPLETION Job Performance Measure No.
A. 1.b(SRO)
Examinees Name:
Examiners Name:
Date performed:
Facility Evaluator:
Number of attempts:
Time to complete:
Question Documentation:
Question:
Response
Result: SAT or UNSAT Examiners signature and date:
Appendix C Job Performance Measure Form ES-C-2 (R8, S1)
Quality Checklist Every JPM should:
- 1.
J be supported by facility licensees job task analysis.
- 2.
J be operationally important (meets NRC WA Catalog threshold criterion of 2.5 (3 for requalification exams) or as determined by the facility and agreed to by the N RC).
- 3.
J be designed as either SRO only, RO/SRO or AO/RO/SRO.
- 4.
include the following, as applicable:
- a. -
J initial conditions
- b.
~
J initiating cues
- c.
~
J references and tools, including associated procedures
- d.
~
J validated time limits (average time allowed for completion) and specific designation of those JPMs that are deemed to be time-critical by the facility operations department
- e. -
J specific performance criteria that include:
(1) J expected actions with exact control and indication nomenclature and criteria (switch position, meter reading),
even if these criteria are not specified in the procedural step (2) J system response and other cues that are complete and correct so that the examiner can properly cue the examinee, if asked (3) J statements describing important observations that should be made by the examinee (4) J criteria for successful completion of the task (5) J identification of those steps that are considered critical (6) N/A restrictions on the sequence of steps
__I..........
.~
..-~-
FOR SIMULATOR USE ONLY Simulator Seturx Reset simulator to 80% power, BOC, CBD 8 190steps.
Place simulator in RUN Place CBD Rods G-3, C-7 and G-1 1 Disconnect Switches in the DISCONNECTED position (Key 1).
Place the Control Bank Selector switch to the CBD position.
Drive Rod (K-7) in 5 steps to 190 steps on CBD Group 1 Step Counter.
Place the Control Bank Selector switch to the AUTO position.
Restore CBD Rods G-3, C-7 and G-1 1 Disconnect Switches in the CONNECTED position.
Place simulator in FREEZE
AppendixC J ob Performance Measure korm tS-C-1 (H8, S1)
Worksheet Facility: Kewaunee Task
Title:
Manual QPTR WA
Reference:
2.1.33 Task No: SP-48-337 Job Performance Measure No: A.l.b(ROl Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of testina:
Simulated Performance Actual Performance X
Classroom Simulator X
Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Task Standards:
Required Materials:
The plant is at 80% power.
The Honeywell computer is NOT available (47024-K).
A-CP-46 is in effect.
Annunciators have come in and have been responded to as appropriate.
Detector Current values are within k0.2, Corrected Currents are within
+0.001, and QPTR values are within k0.002. Also, QPTR is reported to exceed an Acceptance Criterion (QPTR >1.02).
Calculator and a copy of SP-48-337, Quadrant Power Tilt Ratio Determination.
General
References:
SP-48-337, Quadrant Power Tilt Ratio Determination.
Initiating Cue: The CRS directs you to perform a Manual QPTR per SP-48-337.
Time Critical Task:
NO Validation Time:
20 minutes
Appendix C Job Performance Measure Form tS-C-1 (R8, S1) m:
Kewaunee INITIAL CONDITIONS Job Performance Measure No: A.l.b(RO)
Initial Conditions:
The plant is at 80% power.
The Honeywell computer is NOT available (47024-K).
A-CP-46 is in effect.
Annunciators have come in and been responded to as appropriate.
lnitiatina Cue: The CRS directs you to perform a Manual QPTR per SP-48-337.
Appendix C 3
Form ES-C-1 (R8, S1)
PERFORMANCE INFORMATION (Denote critical steps with a "*")
Startina Time:
1 Performance step:
Refer to procedure SP-48-337, Data Sheet 1, and RECORD Group Step Counter Positions.
Standard:
SP-48-337, Quadrant Power Tilt Ratio Determination, step 4.1.
Comment:
Provide a BLANK copy of Data Sheet 1 as required to perform the JPM.
2* Performance step:
Record individual Detector Currents from Power Range B Drawers.
Standard:
Verify the recorded individual Detector Currents are within k0.2 of panel values.
Comment:
Examiner Note: See attached Answer Key 3*
Performance step:
Record 100% detector currents on Data Sheet 1.
Standard:
Verify the recorded Power Range drawer 100°/~ detector current values are within k0.2 of panel values.
Comment:
Examiner Note: See attached Answer Key
Appendix C 4
Form ES-C-1 (R8, S1)
PtHl-OHMANCt INt-URMAl ION (Denote critical steps with a "*")
4*
Performance step:
Calculate corrected currents.
Standard:
Calculate Corrected Currents to within +0.001 by dividing Detector Current by 100% current for each detector on Data Sheet 1.
Comment:
Examiner Note: See attached Answer Key 5*
Performance step:
Calculate the average Corrected Currents for upper and lower detectors Standard:
Calculate the average Corrected Currents of the 4 upper and four lower detectors to within +0.001.
Comment:
Examiner Note: See attached Answer Key 6*
Performance step:
Calculate the QPTR for each detector.
Standard:
Calculate the QPTR for each detector by dividing the corrected current by the corresponding average current to within k0.002.
Comment:
Examiner Note: See attached Answer Key 7* Performance step:
Candidate processes Data Sheet 1, notes QPTR >1.02, and informs shift management.
Standard:
SP-48-337, Quadrant Power Tilt Ratio Determination, steps 4.5, 5.1 and 5.2.
Comment:
CUE: As the CRS, INFORM the candidate that you will complete the processing of Data Sheet 1 and ACKNOWLEDGE the report that QPTR ~1.02.
Terminatina cue:
This JPM is completed.
Completion Time:
Appendix C 5
Form ES-C-1 (R8, Sl)
VERI Fl CAT1 ON OF COMPLETION Job Performance Measure No.
A.l.brRO)
Examinees Name:
Examiners Name:
Date performed:
Facility Evaluator:
Number of attempts:
Time to complete:
Question Documentation:
Question:
Response
Result: SAT or UNSAT Examiners signature and date:
Appendix C Job Performance Measure Form ES-C-2 (R8, S1)
Qualitv Checklist Every JPM should:
- 1.
4 be supported by facility licensees job task analysis.
- 2.
4 be operationally important (meets NRC WA Catalog threshold criterion of 2.5 (3 for requalification exams) or as determined by the facility and agreed to by the NRC).
- 3.
4 be designed as either SRO only, RO/SRO or AO/RO/SRO.
- 4.
include the following, as applicable:
- a. -
.I initial conditions
- b. -
.I initiating cues c- ~.I references and tools, including associated procedures
- d.
~.I validated time limits (average time allowed for completion) and specific designation of those JPMs that are deemed to be time-critical by the facility operations department
- e.
~.I specific performance criteria that include:
expected actions with exact control and indication nomenclature and criteria (switch position, meter reading),
even if these criteria are not specified in the procedural step system response and other cues that are complete and correct so that the examiner can properly cue the examinee, if asked statements describing important observations that should be made by the examinee (4).I criteria for successful completion of the task (5) -
.I identification of those steps that are considered critical restrictions on the sequence of steps
FOR SIMULATOR USE ONLY Simulator SetuD:
Reset simulator to 80% power, BOC, CBD Q 190steps.
Place simulator in RUN Place CBD Rods G-3, C-7 and G-1 1 Disconnect Switches in the DISCONNECTED position (Key 1).
Place the Control Bank Selector switch to the CBD position.
Drive Rod (K-7) in 5 steps to 190 steps on CBD Group 1 Step Counter.
Place the Control Bank Selector switch to the AUTO position.
Restore CBD Rods G-3, C-7 and G-11 Disconnect Switches in the CONNECTED position.
Place simulator in FREEZE
Appendix C Job Performance Measure Form ES-C-1 (R8, S1)
Worksheet Facility: Kewaunee Task No: GNP-03.03.01 Task
Title:
Review a Taaout Job Performance Measure No: A.2 WA
Reference:
2.2.13 Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of testina:
Simulated Performance Actual Performance X
Classroom X
Simulator X
Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Charging Pump B Pulsation Dampener Maintenance is scheduled.
The computerized tagout system is out of service.
A handwritten tagout has been developed to isolate Charging Pump B.
Task Standards:
Two discrepancies are identified in the review of the tagout.
Required Materials: Current copies of the following references are available:
e GNP-3.03.01 - Tagout Processing e
e e
PMP 35-09, CVC-QA-1, Charging Pump Pulsation Dampener Maintenance N-CVC-35B-CL, Charging and Volume Control Prestartup Checklist Drawing OPERXK-100-36, Flow Diagram CVCS General
References:
References listed above.
Initiating Cue: The CRS directs you to perform a tagout placement and return to service adequacy / accuracy verification for Tag Number 04-9999 and report any discrepancies.
Time Critical Task:
NO Validation Time:
10 minutes
Appendix C Job Performance Measure Form ES-C-1 (R8, S1)
Facility: Kewaunee INITIAL CONDITIONS Job Performance Measure No: A.2 Initial Conditions:
Charging Pump B Pulsation Dampener Maintenance is scheduled.
The computerized tagout system is out of service.
A handwritten tagout has been developed to isolate Charging Pump B.
Initiating Cue: The CRS directs you to perform a tagout placement and return to service adequacy / accuracy verification for Tag Number 04-9999 and report any discrepancies.
Appendix C 3
PERFORMANCE INFORMATION (Denote critical steps with a "*")
Startina Time:
1 Performance step:
Obtain and review references as needed to determine tagging series adequacy.
Standard:
Current copies of the following references are available for review:
PMP 35-09, CVC-QA-1, Charging Pump Pulsation Dampener Maintenance N-CVC-35B-CL, Charging and Volume Control Prestartup Checklist Drawing OPERXK-100-36, Flow Diagram CVCS 0
GNP-3.03.01 - Tagout Processing 0
0 0
Comment:
Provide a working copy of GNP-3.03.01 - Tagout Processing once the candidate locates this procedure. The focus of this JPM is a tag series review using available references. Plant walk-downs, or reviews of individual tags or requesting individual documentation is NOT required.
2*
Performance step:
Verify the Tagout adequately isolates the component.
- \\,
Standard:
While verifying the Tagout adequately isolates the component with respect to worker safety and scope of work, the candidate identifies that the specified breaker for Charging Pump B, MCC62E-A5, should be MCC62E-A6.
Comment:
CVC-28B, Suction Pulsation Dampener Drain, is NOT required to be tagged per PMP 35-09. It may be pointed out that the tag was added at the discretion of the Operations Department if questioned. Also, the Shift Manager will determine the specified tagout sequence once the tagout is ready for placement, if tagout sequence is questioned.
Appendix C 4
Form ES-C-1 (R8, Sly PERFORMANCE INFORMATION (Denote critical steps with a "*")
3* Performance step:
Verify the Tagout adequately isolates the component.
Standard:
While verifying the Tagout adequately isolates the component with respect to worker safety and scope of work, the candidate identifies that the required placement and restoration position for CVC-30B Casing Vent is reversed.
0 The placement position is listed as OPEN, but should be CLOSED.
0 The restoration position is listed as CLOSED, but should be OPEN.
Comment:
After the candidate has completed identifying discrepancies, the JPM can be terminated.
rminatina cue: This JPM is completed.
Comdetion Time:
Appendix C 5
VERIFICATION OF COMPLETION Job Performance Measure No.
A. 2 Examinees Name:
Examiners Name:
Date performed:
Facility Evaluator:
Number of attempts:
Time to complete:
Question Documentation:
Question:
Response
Result: SAT or UNSAT Examiners signature and date:
Appendix C Job Performance Measure Form ES-C-2 (R8, S1)
Quality Checklist Every JPM should:
- 1.
J be supported by facility licensees job task analysis.
- 2.
J be operationally important (meets NRC WA Catalog threshold criterion of 2.5 (3 for requalification exams) or as determined by the facility and agreed to by the NRC).
be designed as either SRO only, RO/SRO or AO/RO/SRO.
- 3.
- 4.
J include the following, as applicable:
- a. -
J initial conditions
- b. -
J initiating cues
- c. -
J
- d. -
J references and tools, including associated procedures validated time limits (average time allowed for completion) and specific designation of those JPMs that are deemed to be time-critical by the facility operations department specific performance criteria that include:
- e. -
J expected actions with exact control and indication nomenclature and criteria (switch position, meter reading),
even if these criteria are not specified in the procedural step system response and other cues that are complete and correct so that the examiner can properly cue the examinee, if asked statements describing important observations that should be made by the examinee criteria for successful completion of the task identification of those steps that are considered critical restrictions on the sequence of steps
Appendix C Job Performance Measure Form ES-C-1 (R8, Sl)
Worksheet Facility: Kewaunee Task No: HP-01.019 Task
Title:
Radiation Control Job Performance Measure No: A.3 WA
Reference:
2.3.1 Examinee
NRC Examiner:
Facilitv Evaluator:
Date:
Method of testina:
Simulated Performance Actual Performance Questions Classroom X
Simulator X
Plant READ TO THE EXAMINEE I will explain the initial conditions and provide initiating cues. When you answer the 2 questions successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
- 3.
GIVEN an area where an individual would receive 1 mrem in 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> at 30 centimeters from a source.
- 4.
GIVEN an area where an individual would receive 1.8 rem in 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> at 30 centimeters from a source Task Standards:
Identify area designations and entry requirements.
Required Materials: Calculator and a pen or pencil.
General
References:
HP-01.019, RCA Boundaries, Postings and Barricades, and Posted Area Entry Requirements.
lnitiatinq Cue:
DETERMINE the following for BOTH radiological conditions:
How would the area be designated?
What would the minimum entry requirements be?
Time Critical Task:
NO Validation Time:
12 minutes
Appendix C Job Performance Measure Form ES-C-1 (R8, S1)
INITIAL CONDITIONS / ANSWER SHEET Facility: Kewaunee Job Performance Measure No: A.3 Initial Conditions:
- 3.
GIVEN an area where an individual would receive 1 mrem in 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> at 30 centimeters from a source.
- 4.
GIVEN an area where an individual would receive 1.8 rem in 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> at 30 centimeters from a source lnitiatincl Cue:
DETERMINE the following for BOTH radiological conditions:
- 1.
How would the area be designated?
- 2.
What would the minimum entry requirements be?
Appendix C 2
Form ES-C-1 (R8, S1)
PERFORMANCE INFORMATION (Denote critical steps with a *)
Startina Time:
1*
Performance step:
Given an area where an individual would receive 1 mrem in 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> at 30 centimeters from a source:
0 0
How would the area be designated?
What would the minimum entry requirements be?
Standard:
Per HP-01.019, RCA Boundaries, Postings and Barricades, and Posted Area Entry Requirements, page 6, an area > 0.25 mrem/hour to 5 mrem/hour is a Radiologically Controlled Area (RCA). Entry requirements are specified as:
0 0
a Direct-Reading Dosimeter (DRD) 0 and a TLD.
a Radiation Work Permit (RW P)
Comment:
2*
Performance step:
Given an area where an individual would receive 1.8 rem in 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> at 30 centimeters from a source:
0 0
How would the area be designated?
What would the minimum entry requirements be?
Standard:
Per HP-01.019, RCA Boundaries, Postings and Barricades, and Posted Area Entry Requirements, pages 7-8, an area > 100 mrem/hour but e 1000 mrem/hour is a High Radiation Area (HRA). Entry requirements are specified as:
0 0
a Direct-Reading Dosimeter (DRD) 0 a TLD.
0 a Radiation Work Permit (RW P) and any ONE of the following:
0 A radiation monitoring device which continuously indicates dose rate in the area.
0 A radiation monitoring device which continuously integrates the radiation dose in the area and alarms when a preset integrated dose is received.
A Radiation Protection qualified individual (qualified in RP procedures) with a radiation monitoring device who is responsible for providing positive control over the activities and performing periodic surveillance.
0 Comment:
Appendix C 5
Form ES-C-1 (R8, S1)
~~
~~
VERI Fl CAT1 ON OF COMPLETION Job Performance Measure No.
A.3 Examinees Name:
Examiners Name:
Date performed:
Facility Evaluator:
Number of attempts:
Time to complete:
Question Documentation:
Question:
Response
Result: SAT or UNSAT Examiners signature and date:
Appendix C Job Performance Measure Form ES-C-2 (R8, S1)
Quality Checklist Every JPM should:
- 1.
J be supported by facility licensees job task analysis.
- 2.
J be operationally important (meets NRC WA Catalog threshold criterion of 2.5 (3 for requalification exams) or as determined by the facility and agreed to by the NRC).
- 3.
-f be designed as either SRO only, RO/SRO or AO/RO/SRO.
- e.
N/A include the following, as applicable:
initial conditions initiating cues references and tools, including associated procedures validated time limits (average time allowed for completion) and specific designation of those JPMs that are deemed to be time-critical by the facility operations department specific performance criteria that include:
expected actions with exact control and indication nomenclature and criteria (switch position, meter reading),
even if these criteria are not specified in the procedural step system response and other cues that are complete and correct so that the examiner can properly cue the examinee, if asked statements describing important observations that should be made by the examinee criteria for successful completion of the task identification of those steps that are considered critical restrictions on the sequence of steps
Facility: Kewaunee Task No: EPIP-AD-02 Task
Title:
Classification and NARS Job Performance Measure No: A.4. (SRO)
Examinee:
NRC Examiner:
Facility Evaluator:
Date:
Method of testing Simulated Performance Actual Performance X
Class room Simulator Plant WA
Reference:
2.4.41 SRO 4.1 Task Standards:
Table 2-1, EPIP-AD-02, Emergency Class Determination.
Required Materials: Table 2-1, EPIP-AD-02, Emergency Class Determination.
General
References:
EPIP-AD-02, Emergency Class Determination.
READ TO THE EXAMINEE:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
INITIAL CONDITIONS:
You are the SM.
Seven minutes ago a small plane crashed into the switchyard.
The plant had been operating at 100% Steady State power prior to the event.
Six minutes ago lockouts were received for the MAT (generator), RAT, and TAT.
The reactor tripped on loss of RCPs.
All required blackout loads for Busses 5 and 6 started.
Immediately following the trip, indication on R-15, Air Ejector Exhaust Monitor began to rise.
TLA-15, RMS ABOVE NORMAL, went into alarm for PPCS point GOOO15.
The R-15 recorder is currently stabilized below the alert setpoint at 1.43E+5 cpm.
Diesel Generator B was subsequently shutdown, but the fire continues to burn in the area.
The fire brigade has responded and is currently containing the fire.
The call went out to the Kewaunee Fire Department to respond.
Przr level rapidly fell off-sale low.
Four minutes ago, fire alarm, DSL GEN RM 1B FIRE, was received.
Three minutes ago, SI was manually actuated.
Przr pressure dropped rapidly and continues to decrease.
Containment pressure began to rise.
Containment rad monitors R-2 and R-7 began to rise rapidly.
SI injection flow is 340 gpm RCS pressure is 700 psig Highest CET is 500 deg F RVLlS level is 100%
Containment pressure is 12 psig R-2 is 4.7E+4 mr/hr R-7 is 2.5E+4 mr/hr R-15 is 1.43E+5 cpm 0
One minute ago plant parameters indicated:
0 Wind direction is 305 degrees and windspeed is 9.6 mph.
0 Stability Class is B INITIATING CUE:
You are to classify the event at the highest level and fill out the NARs form. This is a time critical JPM.
Time Critical Task:
YES Validation Time:
30 minutes
Appendix C Job Performance Measure Form ES-C-1 (R8, Sl)
Facility: Kewaunee Job Performance Measure No: A.4.b(SRO)
INITIAL CONDITIONS:
You are the SM.
Seven minutes ago a small plane crashed into the switchyard.
The plant had been operating at 100% Steady State power prior to the event.
Six minutes ago lockouts were received for the MAT (generator), RAT, and TAT.
The reactor tripped on loss of RCPs.
All required blackout loads for Busses 5 and 6 started.
Immediately following the trip, indication on R-15, Air Ejector Exhaust Monitor began to rise.
TLA-15, RMS ABOVE NORMAL, went into alarm for PPCS point GO001 5.
The R-15 recorder is currently stabilized below the alert setpoint at 1.43E+5 cpm.
Diesel Generator B was subsequently shutdown, but the fire continues to burn in the area.
The fire brigade has responded and is currently containing the fire.
The call went out to the Kewaunee Fire Department to respond.
Three minutes ago, SI was manually actuated.
Przr level rapidly fell off-scale low.
Przr pressure dropped rapidly and continues to decrease.
Containment pressure began to rise.
Containment rad monitors R-2 and R-7 began to rise rapidly.
SI injection flow is 340 gpm RCS pressure is 700 psig Highest CET is 500 deg F RVLlS level is 100%
Containment pressure is 12 psig R-2 is 4.7E+4 mr/hr R-7 is 2.5E+4 mr/hr R-15 is 1.43E+5 cpm Four minutes ago, fire alarm, DSL GEN RM 1 B FIRE, was received.
One minute ago plant parameters indicated:
Wind direction is 305 degrees and windspeed is 9.6 mph.
Stability Class is B INITIATING CUE:
You are to classify the event at the highest level and fill out the NARs form. This is a time critical JPM.
Appendix C 3
Form ES-C-1 (R8, Sly PERFORMANCE INFORMATION (Denote critical steps with a "*")
Starting Time:
1 Performance step:
Refer to EPIP-AD-02, Emergency Class Determination.
Standard:
Refer to EPIP-AD-02.
Performance:
SATISFACTORY: -
UNSATISFACTORY: -
2* Performance step:
Determine the highest level of Emergency Classification for the event.
Standard:
Determine classification is Site Emergency from Chart C or D within 14 minutes of start time.
Performance:
SATISFACTORY: -
UNSATISFACTORY: -
Performance step:
Fill out NARs form.
Standard:
NARs form completed in accordance with Answer Key within 15 minutes of classification of the event.
Performance:
SATISFACTORY: -
UNSATISFACTORY: -
Terminating cue:
This JPM is completed.
Completion Time:
Appendix C 6
Form ES-C-1 (R8, Sly VERIFICATION OF COMPLETION Job Performance Measure No. A.l.b(SRO)
Examinees Name:
Date performed:
Facility Evaluator:
Time to complete:
Question Documentation:
Question:
Response
Result: SAT or UNSAT Examiners signature and date:
Appendix C Job Performance Measure Form ES-C-2 (R8, S1)
Quality Checklist Every JPM should:
- 1.
L be supported by facility licensees job task analysis.
- 2.
L be operationally important (meets NRC WA Catalog threshold criterion of 2.5 (3 for requalification exams) or as determined by the facility and agreed to by the NRC).
- 3. L be designed as either SRO only, RO/SRO or AO/RO/SRO.
Include the following, as applicable:
- a. L initial conditions
- b. L initiating cues
- c. L references and tools, including associated procedures
- d. L validated time limits (average time allowed for completion) and specific designation of those JPMs that are deemed to be time-critical by the facility operations department
- e. L specific performance criteria that include:
(1) L expected actions with exact control and indication nomenclature and criteria (switch position, meter reading), even if these criteria are not specified in the procedural step (2) L system response and other cues that are complete and correct so that the examiner can properly cue the examinee, if asked (3) L statements describing important observations that should be made by the examinee (4) L criteria for successful completion of the task (5) L identification of those steps that are considered critical (6) NA restrictions on the sequence of steps
Appendix C Job Performance Measure Form ES-C-1 (R8, S1)
Worksheet Facilitv: Kewaunee Task No: EPIP-AD-07 Task
Title:
Job Performance Measure No: A.4(RO)
WA
Reference:
2.4.15 Examinee:
NRC Examiner:
Facilitv Evaluator:
Date:
Method of testing Simulated Performance X
Actual Performance Classroom Simulator X
Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
0 0
0 Task Standards:
Rewired Materials:
The plant experienced a Loss of Offsite Power from 100% power, normal operations due to a severe storm that has just passed through the area.
Buses 1-5 and 1-6 are being powered from the Emergency Diesel Generators.
An Unusual Event has been declared 6 minutes ago and the Event Notice (NARS) Form EPIPF-AD-07-01 was JUST completed and approved.
Initial Emergency Notifications are initiated and in progress within 15 minutes from the time of EVENT CLASSIFICATION (9 minutes from the Initiating Cue).
A Dial Select phone, the NARS Form EPIPF-AD-07-01 and procedure EPI P-AD-07.
General
References:
EPIP-AD-03, KNPP Response to an Unusual Event.
EPIP-AD-07, Initial Emergency Notifications..
Form EPIPF-AD-07-01, Event Notice Nuclear Accident Reporting System Form (NARS) lnitiatina Cue: The Shift Manager directs you, as the NOTIFIER, to perform State and County notifications per EPIP-AD-07. THIS TASK IS TIME CRITICAL.
Time Critical Task:
YES Validation Time:
10 minutes
Appendix C Job Performance Measure Form ES-C-1 (R8, SI)
INITIAL CONDITIONS Facility: Kewaunee Job Performance Measure No: A.4(RO)
Initial Conditions:
0 0
0 The plant experienced a Loss of Offsite Power from 100% power, normal operations due to a severe storm that has just passed through the area.
Buses 1-5 and 1-6 are being powered from the Emergency Diesel Generators.
An Unusual Event has been declared 6 minutes ago and the Event Notice (NARS) Form EPIPF-AD-07-01 was JUST completed and approved.
lnitiatina Cue: The Shift Manager directs you, as the NOTIFIER, to perform State and County notifications per EPIP-AD-07. THIS TASK IS TIME CRITICAL.
Appendix C 3
Form ES-C-1 (R8, Sly PERFORMANCE INFORMATION (Denote critical steps with a *)
Startina Time:
1 Performance step:
Obtain and review references as needed.
Standard:
Current copies of the following references are available for review:
EPIP-AD-03, KNPP Response to an Unusual Event Form EPIPF-AD-07-01, Event Notice Nuclear Accident Reporting System Form (NARS) - (a partially completed NARS form is provided to the candidate when the Initiating Cue is given) 0 0
EPIP-AD-07, Initial Emergency Notifications.
0 Comment:
Provide working copies of EPIP-AD-07 and EPIP-AD-03, as required, after the candidate locates the desired procedure(s).
2 Performance step:
Verify the SM/ED has contacted the SAS.
Standard:
EPIP-AD-07, step 5.1.1 - The candidate performs the verification.
Comment:
The note prior to step 5.1 requires that the Notifief to perform step 5.1:
Notify the State and County of the Event.
3 Performance step:
Verify any Event Notice (NARS) Form received from the SM has approval signature, date and time.
Standard:
EPIP-AD-07, step 5.1.2 - The candidate performs the verification.
Comment:
The note prior to step 5.1 requires that the Notifief to perform step 5.1:
Notify the State and County of the Event.
-4:
Performance step:
Complete block 12 of Form EPIPF-AD-07-01 (NARS).
Standard:
EPIP-AD-07, step 5.1.3 - The candidate performs the action.
Comment:
The note prior to step 5.1 requires that the Notifief to perform step 5.1:
Notify the State and County of the Event.
Appendix C 4
Form ES-C-1 (R8, S1)
PERFORMANCE INFORMATION (Denote critical steps with a *)
5* Performance step:
Complete EPIP-AD-07, Attachment A, State and County Event Notification per EPIP-AD-07, step 5.1.4
- (1) VERIFY the bell switch is ON.
Standard:
EPIP-AD-07, Attachment A - Step 1 - The candidate performs the verification.
Comment:
CUE - The bell switch is ON.
6* Performance step:
Complete EPIP-AD-07, Attachment A, State and County Event Notification per EPIP-AD-07, step 5.1.4
- (2) Pick up the Dial Select phone and verify the line is clear.
Standard:
EPIP-AD-07, Attachment A - Step 2 - The candidate performs the actions.
Comment:
CUE - Someone is found to be using the Dial Select Line.
7*
Performance step:
Complete EPIP-AD-07, Attachment A, State and County Event Notification per EPIP-AD-07, step 5.1.4
- (2.a) IF someone is using the line, STATE you have a Priority 2 Notification.
Standard:
EPIP-AD-07, Attachment A - Step 2.a. - The candidate performs the action.
Comment:
CUE - The line is now clear.
8* Performance step:
Complete EPIP-AD-07, Attachment A, State and County Event Notification per EPIP-AD-07, step 5.1.4 -
(3) When the line is Clear, DIAL 22.
Standard:
EPIP-AD-07, Attachment A - Step 3 - The candidateperforms the action.
Comment:
CUE - The phone rings, State Warning Center II answers and the phone keeps ringing.
PERFORMANCE INFORMATION (Denote critical steps with a *)
9* Performance step:
Complete EPIP-AD-07, Attachment A, State and County Event Notification per EPIP-AD-07, step 5.1.4:
- (4a-b) When each party acknowledges, answer by saying This is Kewaunee Nuclear Plant - Please stay on the line for a NARS message and record the time that the agency responds on the NARS form.
Standard:
EPIP-AD-07, Attachment A - Step 4.a&b - The candidate performs the actions.
Comment:
CUE - LKewaunee and Manitowoc County Sherriffs BOTH answer and the phone keeps ringing - RECORD the TIME.
(TIME:
).
1 O* Performance step:
Complete EPIP-AD-07, Attachment A, State and County Event Notification per EPIP-AD-07, step 5.1.4: (PERFORM AGAIN)
- (4a-b) When each party acknowledges, answer by saying This is Kewaunee Nuclear Plant - Please stay on the line for a NARS message and record the times that both counties responded on the NARS form.
Standard:
EPIP-AD-07, Attachment A - Step 4.a&b - The candidate performs the actions.
Comment:
The following step (pressing the # key to stop the phone from ringing) may be performed Drier to answering the parties above.
11*
Performance step: Complete EPIP-AD-07, Attachment A, State and County Event Notification per EPIP-AD-07, step 5.1.4:
- (4c) After all agencies have answered, press the # key to cancel the ringing.
Standard:
EPIP-AD-07, Attachment A - Step 4.c - The candidate performs the action.
Comment:
CUE - The phone stops ringing.
Appendix C 6
Form ES-C-1 (R8, Sly PERFORMANCE INFORMATION (Denote critical steps with a *)
12*
Performance step: Complete EPIP-AD-07, Attachment A, State and County Event Notification per EPIP-AD-07, step 5.1.4
- (5) Read the message on the NARS Form SLOWLY and DELIBERATELY, using letter and number designations (REF:
PHONETIC ALPHABET).
Standard:
EPIP-AD-07, Attachment A - Step 5 - The candidate performs the action.
Comment:
The PHONETIC ALPHABET is defined in the Communications Standard GNP-03.17.04.
13*
Performance step: Complete EPIP-AD-07, Attachment A, State and County Event Notification per EPIP-AD-07, step 5.1.4
- (6) SAY: State Warning Center, please read back this message to verify accuracy and PAUSE.
Standard:
EPIP-AD-07, Attachment A - Step 6 - The candidate performs the actions.
Comment:
CUE - STATE: State Warning Center reads back the message accurately IF the message contains no errors, OTHERWISE read back the message AS GIVEN by the candidate to see if the errors are corrected appropriately.
14*
Performance step: Complete EPIP-AD-07, Attachment A, State and County Event Notification per EPIP-AD-07, step 5.1.4
- (7) SAY: Have all agencies received this message? and PAUSE.
Standard:
EPIP-AD-07, Attachment A - Step7 - The candidate performs the actions.
Comment:
CUE - STATE: All agencies have received this message 15*
Performance step: Complete EPIP-AD-07, Attachment A, State and County Event Notification per EPIP-AD-07, step 5.1.4
- (8) SAY: Relay this information to Emergency Management immediately. Have the appropriate personnel verify this message by placing a return phone call to KNPP at 920-388-0101.
Standard:
EPIP-AD-07, Attachment A - Step 8 - The candidate performs the action.
Comment:
CUE - ACKNOWLEDGE (and repeat back) the last message. NOTE: This last leg of communication is not stated in the procedure.
I-__-
Appendix C 7
Form ES-C-1 (R8, Sly PERFORMANCE INFORMATION (Denote critical steps with a I*)
16 Performance step:
Complete EPIP-AD-07, Attachment A, State and County Event Notification per EPIP-AD-07, step 5.1.4
- (9) IF any agencies did not respond...
Standard:
EPIP-AD-07, Attachment A - Step 9 - The candidate performs the verification.
Comment:
17*
The candidate should acknowledge that all agencies have responded.
Performance step: Complete EPIP-AD-07, Attachment A, State and County Event Notification per EPIP-AD-07, step 5.1.4
- (10) INFORM SM/ED/ERM that initial notifications have been made and you are awaiting verification callbacks.
Standard:
EPIP-AD-07, Attachment A - Step 10 - The candidate performs the actions.
Comment:
CUE - ACKNOWLEDGE (and repeat back) the last message.
Terminatina cue:
This JPM is completed.
Comdetion Time:
Appendix C a
Form ES-C-1 (R8, Sl)
VERIFICATION OF COMPLETION Job Performance Measure No.
A.4(RO)
Examinees Name:
Examiners Name:
Date performed:
Facility Evaluator:
Number of attempts:
Time to complete:
Question Documentation:
Question:
Response
Result: SAT or UNSAT Examiners signature and date:
Appendix C Job Performance Measure Form ES-C-2 (R8, S1)
Quality Checklist Every JPM should:
- 1.
J be supported by facility licensees job task analysis.
- 2.
J be operationally important (meets NRC WA Catalog threshold criterion of 2.5 (3 for requalification exams) or as determined by the facility and agreed to by the NRC).
be designed as either SRO only, RO/SRO or AO/RO/SRO.
- 3.
- 4.
J include the following, as applicable:
- a. -
J initial conditions
- b.
~
J initiating cues
- c.
~
J
- d. -
J references and tools, including associated procedures validated time limits (average time allowed for completion) and specific designation of those JPMs that are deemed to be time-critical by the facility operations department specific performance criteria that include:
- e.
~
J expected actions with exact control and indication nomenclature and criteria (switch position, meter reading),
even if these criteria are not specified in the procedural step system response and other cues that are complete and correct so that the examiner can properly cue the examinee, if asked statements describing important observations that should be made by the examinee criteria for successful completion of the task identification of those steps that are considered critical restrictions on the sequence of steps