Summary of Meeting with Virginia Electric & Power Company/Dominion Connecticut Nuclear to Provide Both Organizations Opportunity to Discuss Items of Interest, Including Attributes of Good Licensing Submittals
ML040770030
Person / Time
Site: Millstone, Surry, North Anna  Dominion icon.png
Issue date: 03/26/2004
From: Stephen Monarque
NRC/NRR/DLPM/LPD2
To:
Office of Nuclear Reactor Regulation
Monarque S, NRR/DLPM, 415-1544
References
Download: ML040770030 (5)


Text

March 26, 2004 LICENSEE:

Virginia Electric and Power Company (VEPCO) and Dominion Nuclear Connecticut, Inc.

FACILITY:

North Anna Power and Surry Power Stations, Units 1 and 2, and Millstone Power Station, Units 2 and 3

SUBJECT:

SUMMARY

OF DECEMBER 3, 2003, MEETING WITH VIRGINIA ELECTRIC AND POWER COMPANY/DOMINION NUCLEAR CONNECTICUT, INC.

On December 3, 2003, representatives of Virginia Electric and Power Company (VEPCO) and Dominion Nuclear Connecticut, Inc. met with the U.S. Nuclear Regulatory Commission (NRC) staff at Dominions Headquarters in Richmond, VA. The purpose of this meeting was to provide both organizations an opportunity to discuss items of interest, including the attributes of good licensing submittals. This was a Category 1 public meeting. The public meeting began with a discussion about the recent management changes that had occurred at the NRC. Mr. Ed Hackett was introduced as the Director of Project Directorate II and Mr. Darrell Roberts was introduced as the Acting Section Chief within Project Directorate I. The meeting attendees then discussed the agenda topics for the meeting. The summary below provides a brief description of comments made by the meeting attendees.

1. Use of Top-Ten Licensing Issues In order for the NRC staff to be aware of the priority of specific licensing actions, the NRC staff requested that Dominion provide the NRC staff with a list for each plant that contains the prioritized order of existing licensing actions.
2. Cross-Regional Submittals When requesting a licensing action or program review for all three sites, Dominion proposed to submit one application that listed these three plants instead of providing three separate plant-specific applications. Dominion and the NRC staff agreed that this proposal would allow for a consistent and efficient NRC staff review. The NRC staff noted that for these types of applications the technical issues for all three plants should be similar.
3. Generic Reviews Dominion had expressed concern about the generic communication items that were still open.

The NRC staff responded by stating that these bulletins were not intended to serve as long-term solutions, rather as vehicles to collect information about a pending issue. The NRC staff provided the status of several generic communications and indicated to Dominion that it would check on the review status of Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors.

4. Technical Specification Authority Review Process The NRC staff explained that due to the discrepancies discovered with Surry Power Stations Technical Specifications (TS) during the issuance of Surrys renewed license, the NRC is undertaking a program to review the TS contained at plants throughout the country. This is to ensure that the plant-specific TS are exactly the same as the TS authority file maintained by the NRC.
5. Miscellaneous Topics The NRC staff and Dominion had general discussions on the evaluation of no significant hazard consideration, probabilistic risk assessment and deterministic justifications, and the content of regulatory evaluations that are contained in proposed license amendments.

At the conclusion of the meeting, the attendees agreed that this meeting had been successful and the meeting was adjourned.

Members of the public were not in attendance and Public Meeting Feedback forms were not received. The meeting attendance list is included as Enclosure 1. Please direct any inquiries to Mr. Stephen Monarque, Project Manager, at 301-415-1544 or srm2@nrc.gov.

/RA/

Stephen Monarque, Project Manager, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-280, 50-281, 50-336, 50-338, 50-339, and 50-423

Attachment:

Meeting Attendance List cc w/attachment:

See next page

4. Technical Specification Authority Review Process The NRC staff explained that due to the discrepancies discovered with Surry Power Stations Technical Specifications (TS) during the issuance of Surrys renewed license, the NRC is undertaking a program to review the TS contained at plants throughout the country. This is to ensure that the plant-specific TS are exactly the same as the TS authority file maintained by the NRC.
5. Miscellaneous Topics The NRC staff and Dominion had general discussions on the evaluation of no significant hazard consideration, probabilistic risk assessment and deterministic justifications, and the content of regulatory evaluations that are contained in proposed license amendments.

At the conclusion of the meeting, the attendees agreed that this meeting had been successful and the meeting was adjourned.

Members of the public were not in attendance and Public Meeting Feedback forms were not received. The meeting attendance list is included as Enclosure 1. Please direct any inquiries to Mr. Stephen Monarque, Project Manager, at 301-415-1544 or srm2@nrc.gov.

/RA/

Stephen Monarque, Project Manager, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-280, 50-281, 50-336, 50-338, 50-339, and 50-423

Attachment:

Meeting Attendance List cc w/attachment:

See next page DISTRIBUTION PUBLIC RidsNrrPMEDunnington (Hard Copy)

PDII-1 R/F RidsAcrsAcnwMailCenter RidsNrrDlpm (TMarsh/ELeeds)

RidsOgcRp RidsNrrDlpmLpdii (EHackett)

JAlbright RidsNrrDlpmLpdii-1 (JNakoski)

MKotzalas RidsNrrPMSMonarque KLandis, RII Package: ML040910062 Meeting Notice: ML0333240507 ADAMS ACCESSION NO. ML040770030 OFFICE PDII-1/PM PDII-2/LA PDII-1/SC NAME SMonarque EDunnington JNakoski DATE 3/26/04 3/18/04 3/26/04 OFFICIAL RECORD COPY

Virginia Electric & Power Company cc:

Mr. C. Lee Lintecum County Administrator Louisa County P.O. Box 160 Louisa, Virginia 23093 Ms. Lillian M. Cuoco, Esquire Senior Nuclear Counsel Dominion Nuclear Connecticut, Inc.

Millstone Power Station Building 475, 5th Floor Rope Ferry Road Rt. 156 Waterford, Connecticut 06385 Dr. W. T. Lough Virginia State Corporation Commission Division of Energy Regulation P. O. Box 1197 Richmond, Virginia 23209 Old Dominion Electric Cooperative 4201 Dominion Blvd.

Glen Allen, Virginia 23060 Mr. Stephen P. Sarver, Director Nuclear Licensing & Operations Support Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Blvd.

Glen Allen, Virginia 23060-6711 Office of the Attorney General Commonwealth of Virginia 900 East Main Street Richmond, Virginia 23219 North Anna Power Station Units 1 and 2 Mr. David A. Heacock Site Vice President North Anna Power Station P. O. Box 402 Mineral, Virginia 23117 Mr. David A. Christian Sr. Vice President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Blvd.

Glen Allen, Virginia 23060-6711 Mr. Richard H. Blount, II Site Vice President Surry Power Station Virginia Electric and Power Company 5570 Hog Island Road Surry, Virginia 23883-0315 Robert B. Strobe, M.D., M.P.H.

State Health Commissioner Office of the Commissioner Virginia Department of Health P.O. Box 2448 Richmond, Virginia 23218 Mr. William R. Matthews Vice President - Nuclear Operations Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, Virginia 23060-6711 Senior Resident Inspector North Anna Power Station U.S. Nuclear Regulatory Commission 1024 Haley Drive Mineral, Virginia 23117

ATTENDEES - MEETING ON DECEMBER 3, 2003 TO DISCUSS PROCESSING OF LICENSING APPLICATIONS AND ATTRIBUTES OF GOOD LICENSING SUBMITTALS NAME ORGANIZATION Stephen R. Monarque NRC/NRR/DLPM Christopher Gratton NRC/NRR/DLPM John Nakoski NRC/NRR/DLPM Darrell J. Roberts NRC/NRR/DLPM Ed Hackett NRC/NRR/DLPM Margaret Earle Dominion Nuclear Licensing Jim Clifford NRC/NRR/DLPM Larry Lane Dominion Chris Funderburk Dominion Paul Willoughby Dominion Dave Dotson Dominion Stephen Scace Dominion Barry Garber Dominion Mike Gaffney Dominion James Crossman Dominion Gregory S. Salomone Dominion David A. Sommers Dominion Maggie McClure Dominion Leslie L. Spain Dominion Sheri W. Teu Dominion Attachment

Millstone Power Station, Unit Nos. 2 and 3 cc:

Lillian M. Cuoco, Esquire Senior Counsel Dominion Resources Services, Inc.

Rope Ferry Road Waterford, CT 06385 Edward L. Wilds, Jr., Ph.D.

Director, Division of Radiation Department of Environmental Protection 79 Elm Street Hartford, CT 06106-5127 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 First Selectmen Town of Waterford 15 Rope Ferry Road Waterford, CT 06385 Mr. W. R. Matthews Senior Vice President - Nuclear Operations Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385 Charles Brinkman, Director Washington Operations Nuclear Services Westinghouse Electric Company 12300 Twinbrook Pkwy, Suite 330 Rockville, MD 20852 Senior Resident Inspector Millstone Power Station c/o U.S. Nuclear Regulatory Commission P. O. Box 513 Niantic, CT 06357 Mr. P. J. Parulis Manager - Nuclear Oversight Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385 Mr. John Markowicz Co-Chair Nuclear Energy Advisory Council 9 Susan Terrace Waterford, CT 06385 Ms. Nancy Burton 147 Cross Highway Redding Ridge, CT 00870 Mr. G. D. Hicks Director - Nuclear Station Safety and Licensing Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385 Mr. Evan W. Woollacott Co-Chair Nuclear Energy Advisory Council 128 Terrys Plain Road Simsbury, CT 06070 Mr. William D. Meinert Nuclear Engineer Massachusetts Municipal Wholesale Electric Company P.O. Box 426 Ludlow, MA 01056 Mr. David W. Dodson Licensing Supervisor Dominion Nuclear Connecticut, Inc.

Roper Ferry Road Waterford, CT 06385

Millstone Power Station, Unit Nos. 2 and 3 cc:

Mr. S. E. Scace Assistant to the Site Vice President Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385 Mr. M. J. Wilson Manager - Nuclear Training Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385 Mr. A. J. Jordan, Jr.

Director - Nuclear Engineering Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385 Mr. S. P. Sarver Director - Nuclear Station Operations and Maintenance Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385 Mr. J. Alan Price Site Vice President Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385 Mr. Chris L. Funderburk Director, Nuclear Licensing and Operations Support Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711